52 research outputs found

    Development of longitudinal beam profile monitor based on Coherent Transition Radiation effect for CLARA accelerator

    Get PDF
    Coherent Transition Radiation (CTR) has widely been used for longitudinal beam profile diagnostics. Its spectral-spatial properties have been thoroughly theoretically and experimentally investigated. We have decided to develop a longitudinal beam profile diagnostics based on CTR technique to be used for interpreting the experimental results of Dielectric Wakefield Accelerator (DWA) and Coherent Cherenkov Diffraction Radiation (CChDR) experiments. In this paper we present the technical design,tuning and commissioning of the CTR longitudinal bunch profile monitor at CLARA facilit

    Resonant Diffraction Radiation from an Ultrarelativistic Particle Moving Close to a Tilted Grating

    Get PDF
    A simple model for calculating the diffraction radiation characteristics from an ultrarelativistic charged particle moving close to a tilted ideally conducting strip is developed. Resonant diffraction radiation (RDR) is treated as a superposition of the radiation fields for periodically spaced strips. The RDR characteristics have been calculated as a function of the number of grating elements, tilted angle, and initial particle energy. An analogy with both the resonant transition radiation in absorbing medium and the parametric X-ray radiation is noted.Comment: 17 pages, 12 figures, RevTe

    Lithospheric structure along wide-angle seismic profile GEORIFT 2013 in Pripyat–Dnieper–Donets Basin (Belarus and Ukraine)

    Get PDF
    The GEORIFT 2013 (GR'13) WARR (wide-angle reflection and refraction) experiment was carried out in 2013 in the territory of Belarus and Ukraine with broad international co-operation. The aim of the work is to study basin architecture and deep structure of the Pripyat-Dnieper-Donets Basin (PDDB), which is the deepest and best studied Palaeozoic rift basin in Europe. The PDDB is located in the southern part of the East European Craton (EEC) and crosses Sarmatia-one of the three segments of the EEC. The PDDB was formed by Late Devonian rifting associated with domal basement uplift and magmatism. The GR'13 extends in NW SE direction along the PDDB strike and crosses the Pripyat Trough (PT) and Dnieper Graben (DG) separated by the Bragin Uplift (BU) of the basement. The field acquisition along the GR'13 (of 670 km total length) involved 14 shots and recorders deployed every similar to 2.2 km for several shot points. The good quality of the data, with first arrivals visible up to 670 km for several shot points, allowed for construction of a velocity model extending to 80 km depth using ray-tracing modelling. The thickness of the sediments (Vp <6.0 km s(-1)) varies from 1-4 km in the PT, to 5 km in the NW part of the DG, to 10-13 km in the SE part of the profile. Below the DG, at similar to 330-530 km distance, we observed an upwarping of the lower crust (with Vp of similar to 7.1 km s(-1)) to 25 km depth that represents a rift pillow or mantle underplate. The Moho shallows southeastwards from similar to 47 km in the PT to 40-38 km in the DG with mantle velocities of 8.35 and similar to 8.25 km s(-1) in the PT and DG, respectively. A near-horizontal mantle discontinuity was found beneath BU (a transition zone from the PT to the DG) at the depth of 50-47 km. It dips to the depth of similar to 60 km at distances of 360-405 km, similar to the intersecting EUROBRIDGE'97 profile. The crust and upper mantle structure on the GR'13 may reflect varying intensity of rifting in the PDDB from a passive stage in the PT to active rifting in the DG. The absence of Moho uplift and relatively thick crystalline crust under the PT is explained by its tectonic position as a closing unit of the PDDB, with a gradual attenuation of rifting from the southeast to the northwest. The most active stage of rifting is evidenced in the DG by a shallower Moho and by a presence of a rift pillow caused by mafic and ultramafic intrusions during the active phase. The junction of the PT and the DG (the BU) locates just at its intersection with the NS regional tectonic zone Odessa-Gomel. Most likely, the 'blocking' effect of this zone did not allow for further propagation of active rifting to the NW.Peer reviewe

    ATF2 COMMISSIONING

    Get PDF
    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF
    The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+ee^+e^- collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years
    corecore