130 research outputs found

    Intentional and unintentional contributions to nonspecific preparation: Electrophysiological evidence.

    Get PDF
    The authors hypothesized that there are distinct intentional and unintentional influences on nonspecific preparation for a future event. In 2 experiments, participants responded to an imperative stimulus (

    A Fast and Reliable Method for Simultaneous Waveform, Amplitude and Latency Estimation of Single-Trial EEG/MEG Data

    Get PDF
    The amplitude and latency of single-trial EEG/MEG signals may provide valuable information concerning human brain functioning. In this article we propose a new method to reliably estimate single-trial amplitude and latency of EEG/MEG signals. The advantages of the method are fourfold. First, no a-priori specified template function is required. Second, the method allows for multiple signals that may vary independently in amplitude and/or latency. Third, the method is less sensitive to noise as it models data with a parsimonious set of basis functions. Finally, the method is very fast since it is based on an iterative linear least squares algorithm. A simulation study shows that the method yields reliable estimates under different levels of latency variation and signal-to-noise ratioÕs. Furthermore, it shows that the existence of multiple signals can be correctly determined. An application to empirical data from a choice reaction time study indicates that the method describes these data accurately

    The relationship between reversed masked priming and the tri-phasic pattern of the lateralised readiness potential.

    Get PDF
    One of the potential explanations for negative compatibility effects (NCE) in subliminal motor priming tasks has been perceptual prime-target interactions. Here, we investigate whether the characteristic tri-phasic LRP pattern associated with the NCE is caused by these prime-target interactions. We found that both the prime-related phase and the critical reversal phase remain present even on trials where the target is omitted, confirming they are elicited by the prime and mask, not by prime-target interactions. We also report that shape and size of the reversal phase are associated with response speed, consistent with a causal role for the reversal for the subsequent response latency. Additionally, we analysed sequential modulation of the NCE by previous conflicting events, even though such conflict is subliminal. In accordance with previous literature, this modulation is small but significant

    Modeling of high storage sheet depot with Plant Simulation

    No full text
    Manufacturing processes are becoming increasingly automated. Introduction of innovative solutions often necessitate processing very large number of signals from various devices. Correctness tests of the components configuration becomes a compiled operation requiring vast expenditure of time and knowledge. The models may be a mathematical reflection of the actual object. Many actions can be computer-assisted to varying degree. One example is construction of simulation models. These can also be simulation models developed in advanced software. The stages of creating a model may be purely random. This paper aims at a closer analysis of the simulation model based on the high storage sheet depot modeling using Plant Simulation software. The results of analysis can be used for optimization, but this stage is a separate issue. Keywords: Plant Simulation, simulation, model, warehouse, sheet depot

    Decision model supporting selection of material supply chains for construction projects

    Get PDF
    Przedstawiono matematyczny model programowania liniowego mieszanego problemu optymalizacji dostaw wyrobów budowlanych zużywanych w sposób nierównomierny. Pozwala on na analizę opłacalności stosowania wyrobów zamiennych, wyrobów wymagających wstępnego przygotowania lub obróbki przed wbudowaniem, oraz możliwych do gromadzenia w ilościach przekraczających bieżące zapotrzebowanie budowy, lecz z ograniczeniem pojemności składowisk. Model umożliwia minimalizację łącznych kosztów gospodarowania zapasami – zaplanowanie ekonomicznie uzasadnionej wielkości dostaw w kolejnych okresach realizacji budowy oraz dokonanie wyboru łańcuchów zaopatrzenia
    • …
    corecore