4,012 research outputs found

    The source structure of 0642+449 detected from the CONT14 observations

    Full text link
    The CONT14 campaign with state-of-the-art VLBI data has observed the source 0642+449 with about one thousand observables each day during a continuous observing period of fifteen days, providing tens of thousands of closure delays---the sum of the delays around a closed loop of baselines. The closure delay is independent of the instrumental and propagation delays and provides valuable additional information about the source structure. We demonstrate the use of this new "observable" for the determination of the structure in the radio source 0642+449. This source, as one of the defining sources in the second realization of the International Celestial Reference Frame (ICRF2), is found to have two point-like components with a relative position offset of -426 microarcseconds in right ascension and -66 microarcseconds in declination. The two components are almost equally bright with a flux-density ratio of 0.92. The standard deviation of closure delays for source 0642+449 was reduced from 139 ps to 90 ps by using this two-component model. Closure delays larger than one nanosecond are found to be related to the source structure, demonstrating that structure effects for a source with this simple structure could be up to tens of nanoseconds. The method described in this paper does not rely on a priori source structure information, such as knowledge of source structure determined from direct (Fourier) imaging of the same observations or observations at other epochs. We anticipate our study to be a starting point for more effective determination of the structure effect in VLBI observations.Comment: 14 pages, 13 figures, Accepted by Astronomical Journal on 12 Jul, 201

    The impacts of source structure on geodetic parameters demonstrated by the radio source 3C371

    Full text link
    Closure quantities measured by very long baseline interferometry (VLBI) observations are independent of instrumental and propagation instabilities and antenna gain factors, but are sensitive to source structure. A new method is proposed to calculate a structure index based on the median values of closure quantities rather than the brightness distribution of a source. The results are comparable to structure indices based on imaging observations at other epochs and demonstrate the flexibility of deriving structure indices from exactly the same observations as used for geodetic analysis and without imaging analysis. A three-component model for the structure of source 3C371 is developed by model-fitting closure phases. It provides a real case of tracing how the structure effect identified by closure phases in the same observations as the delay observables affects the geodetic analysis, and investigating which geodetic parameters are corrupted to what extent by the structure effect. Using the resulting structure correction based on the three-component model of source 3C371, two solutions, with and without correcting the structure effect, are made. With corrections, the overall rms of this source is reduced by 1 ps, and the impacts of the structure effect introduced by this single source are up to 1.4 mm on station positions and up to 4.4 microarcseconds on Earth orientation parameters. This study is considered as a starting point for handling the source structure effect on geodetic VLBI from geodetic sessions themselves.Comment: 5 figures, 15 pages, accepted by Journal of Geodesy at 19 Dec., 201

    FAKTOR RISIKO KETIDAKIKUTSERTAAN SKRINING TUBERKULOSIS (STUDI PADA PENDERITA DIABETES MELLITUS DI PUSKESMAS IMOGIRI 1 BANTUL)

    Get PDF
    Latar belakang: DM meningkatkan risiko sebesar 1,5-7,8 kali untuk terinfeksi TB. Tingginya jumlah kasus DM sangat mungkin meningkatkan kejadian TB secara bermakna di masa mendatang sehingga perlu dilakukan upaya tambahan untuk meningkatkan deteksi TB melalui peninjauan pada populasi penderita DM. Tujuan: menganalisis faktor risiko ketidakikutsertaan skrining TB pada penderita DM di Puskesmas Imogiri 1. Metode: penelitian ini menggunakan desain studi case control dengan menambahkan metode kualitatif deskriptif sebagai pendalaman jawaban. Besar sampel pada penelitian ini adalah 80 responden yang terdiri dari 40 kasus dan 40 kontrol. Analisis bivariat menggunakan uji chi-square dan untuk data pendukung kualitatif dilakukan konten analisis. Hasil: faktor risiko ketidakikutsertaan skrining TB pada penderita DM adalah pendidikan tidak tamat SMA (OR=4,20), pengetahuan TB-DM kurang (OR=3,77), tidak memiliki persepsi TB-DM sebagai penyakit serius (OR=5,93), tidak memiliki penghargaan intrinsik (OR=3,66), tidak memiliki kesanggupan untuk skrining(OR=4,89), tidak memiliki tanggapan mengenai kemanjuran skrining (OR=3,00) dan tidak memiliki tanggapan tentang biaya (OR=3,95). Kesimpulan: pendidikan tamat SMA, pengetahuan TB-DM kurang, tidak memiliki persepsi TB DM sebagai penyakit serius, tidak memiliki penghargaan intrinsik, tidak memiliki kesanggupan untuk skrining, tidak memiliki tanggapan mengenai kemanjuran skrining dan tidak memiliki tanggapan tentang biaya merupakan faktor risiko ketidakikutsertaan skrining TB pada penderita DM di Puskesmas Imogiri 1 Kata Kunci: Partisipasi, Skrining TB, DM, Komorbiditas TB-D

    Diseño de una planta de transferencia de residuos sólidos urbanos en la comarca de Sobrarbe (Huesca)

    Get PDF
    La comarca de Sobrarbe se ve con la necesidad de buscar una solución a la problemática que supone la inminente clausura del vertedero controlado de Ainsa. Dicho vertedero entró en funcionamiento en 1992, inicialmente previsto para un periodo de servicio de ocho años. A día de hoy, el vaso del vertedero está colmado, hace tiempo que las chimeneas de metano están enterradas por los residuos, y la compactación de los residuos se hace sin sellado de tierra. El Plan de Gestión Integral de los Residuos de Aragón (G.I.R.A. 2005-2008) prevé la clausura del vertedero, además de la construcción de una planta de transferencia de residuos sólidos urbanos (RSU) en el municipio de Ainsa, para optimizar el transporte de los RSU al vertedero de la agrupación supracomarcal, ubicado en los alrededores de Barbastro. La memoria describe un estudio de las necesidades de la comarca. Se ha analizado la producción de RSU, así como su caracterización; también se ha tenido en cuenta aspectos socioculturales, como la geografía del terreno, el patrimonio cultural y medioambiental, el peso del turismo, su estacionalidad y los picos de producción de RSU asociados. Otros aspectos, como los precedentes de la comarca en materia de gestión de residuos, y la normativa Aragonesa en materia de residuos (G.I.R.A.) y local (Agenda 21 de Sobrarbe) se han tenido en cuenta desde un principio. Una vez se hecho el estudio de necesidades, se hace un análisis de la tipología de las plantas de transferencia de RSU. En este análisis se describen los objetivos de este tipo de instalaciones, se describen dos modelos distintos, se comenta su funcionamiento y se citan criterios para un buen diseño de estas instalaciones. El capítulo dedicado a las estadísticas es especialmente útil para el diseño y el dimensionado de la planta. Se citan dos casos reales de planta de transferencia de RSU de alta montaña, que sirven de guía para elegir el tipo de planta a proponer. La elección de la maquinaria, el dimensionado y la descripción de la obra civil, se acompaña del estudio de la vida útil, de las necesidades futuras de la planta, de las estimaciones logísticas y de un estudio de aspectos medio ambientales. Como conclusión, se propone la construcción de una planta de transferencia de RSU con compactación, ubicada en el mismo recinto del vertedero controlado, así como el equipamiento y la maquinaria auxiliar necesaria. Como añadido, también se propone mejorar la gestión de los residuos, a base de promocionar un punto limpio, y con la descripción de técnicas de gestión y eliminación de lixiviados de vertedero

    Diseño de una planta de transferencia de residuos sólidos urbanos en la comarca de Sobrarbe (Huesca)

    Get PDF
    La comarca de Sobrarbe se ve con la necesidad de buscar una solución a la problemática que supone la inminente clausura del vertedero controlado de Ainsa. Dicho vertedero entró en funcionamiento en 1992, inicialmente previsto para un periodo de servicio de ocho años. A día de hoy, el vaso del vertedero está colmado, hace tiempo que las chimeneas de metano están enterradas por los residuos, y la compactación de los residuos se hace sin sellado de tierra. El Plan de Gestión Integral de los Residuos de Aragón (G.I.R.A. 2005-2008) prevé la clausura del vertedero, además de la construcción de una planta de transferencia de residuos sólidos urbanos (RSU) en el municipio de Ainsa, para optimizar el transporte de los RSU al vertedero de la agrupación supracomarcal, ubicado en los alrededores de Barbastro. La memoria describe un estudio de las necesidades de la comarca. Se ha analizado la producción de RSU, así como su caracterización; también se ha tenido en cuenta aspectos socioculturales, como la geografía del terreno, el patrimonio cultural y medioambiental, el peso del turismo, su estacionalidad y los picos de producción de RSU asociados. Otros aspectos, como los precedentes de la comarca en materia de gestión de residuos, y la normativa Aragonesa en materia de residuos (G.I.R.A.) y local (Agenda 21 de Sobrarbe) se han tenido en cuenta desde un principio. Una vez se hecho el estudio de necesidades, se hace un análisis de la tipología de las plantas de transferencia de RSU. En este análisis se describen los objetivos de este tipo de instalaciones, se describen dos modelos distintos, se comenta su funcionamiento y se citan criterios para un buen diseño de estas instalaciones. El capítulo dedicado a las estadísticas es especialmente útil para el diseño y el dimensionado de la planta. Se citan dos casos reales de planta de transferencia de RSU de alta montaña, que sirven de guía para elegir el tipo de planta a proponer. La elección de la maquinaria, el dimensionado y la descripción de la obra civil, se acompaña del estudio de la vida útil, de las necesidades futuras de la planta, de las estimaciones logísticas y de un estudio de aspectos medio ambientales. Como conclusión, se propone la construcción de una planta de transferencia de RSU con compactación, ubicada en el mismo recinto del vertedero controlado, así como el equipamiento y la maquinaria auxiliar necesaria. Como añadido, también se propone mejorar la gestión de los residuos, a base de promocionar un punto limpio, y con la descripción de técnicas de gestión y eliminación de lixiviados de vertedero

    An Exploratory-Descriptive Review of Main Big Data Analytics Reference Architectures – an IT Service Management Approach

    Get PDF
    Big Data Analytics (BDA) aims to create decision-making business value by applying multiple analytical procedures from the Statistics, Operations Research and Artificial Intelligence disciplines to huge internal and external business datasets. However, BDA requires high investments in IT resources – computing, storage, network, software, data, and environment -, and consequently the selection of the right-sized implementation is a hard business managerial decision. Parallelly, IT Service Management (ITSM) frameworks have provided best processes-practices to deliver value to end-users through the concept of IT services, and the provision of BDA as Service (BDAaaS) has now emerged. Consequently, from a dual BDA-ITSM perspective, delivering BDAaaS demands the design and implementation of a concrete BDAaaS architecture. Practitioner and academic literature on BDAaaS architectures is abundant but fragmented, disperse and uses a non-standard terminology. ITSM managers and academics involved on the problematic to deliver BDAaaS, thus, face the lack of mature practical guidelines and theoretical frameworks on BDAaaS architectures. In this research, consequently, with an exploratory-descriptive purpose, we contributed with an updated review of three main non-proprietary BDAaaS reference architectures to ITSM managers, and with a hybrid functional-deployment architectural view to the BDAaaS literature. However, given its exploratory status, further conceptual and empirical research is encouraged

    Hybrid time-dependent Ginzburg-Landau simulations of block copolymer nanocomposites: nanoparticle anisotropy

    Full text link
    Block copolymer melts are perfect candidates to template the position of colloidal nanoparticles in the nanoscale, on top of their well-known suitability for lithography applications. This is due to their ability to self-assemble into periodic ordered structures, in which nanoparticles can segregate depending on the polymer-particle interactions, size and shape. The resulting coassembled structure can be highly ordered as a combination of both the polymeric and colloidal properties. The time-dependent Ginzburg-Landau model for the block copolymer was combined with Brownian dynamics for nanoparticles, resulting in an efficient mesoscopic model to study the complex behaviour of block copolymer nanocomposites. This review covers recent developments of the time-dependent Ginzburg-Landau/Brownian dynamics scheme. This includes efforts to parallelise the numerical scheme and applications of the model. The validity of the model is studied by comparing simulation and experimental results for isotropic nanoparticles. Extensions to simulate nonspherical and inhomogeneous nanoparticles are discussed and simulation results are discussed. The time-dependent Ginzburg-Landau/Brownian dynamics scheme is shown to be a flexible method which can account for the relatively large system sizes required to study block copolymer nanocomposite systems, while being easily extensible to simulate nonspherical nanoparticles

    Fortalecimiento del Sentido de Vida a partir de Procesos de Autogestión en la IPS Generación IVProyect Centro de Armonización The Wala Nasa

    Get PDF
    Entrevista realizada a los comuneros , Test de habilidades aplicado a los comuneros, Evidencia de la técnica. Metaplan, Diseño de la propuesta, Análisis e interpretación de cómo se dan los procesos de autogestión, Módulos 1. Desarrollo humano, Módulo 2. Las diez capacidades humanasLa IPS Generación IVProyect Centro de armonización The Wala Nasa es una organización social ubicada en la vereda los Robles vía a Timbio, de carácter privado, comprometida y habilitada para brindar servicios humanizados que contribuyan a la recuperación de la salud por adiciones de nuestros usuarios mejorando su calidad de vida; con más de 20 años de experiencia en intervenciones de impacto en diferentes comunidades a nivel nacional y más de 10 años de experiencia en procesos de recuperación de la salud. Esta estrategia tiene como finalidad que a través de procesos de autogestión las personas de la comunidad a intervenir se empoderen del proyecto, que sean ellos mismos los creadores de las estrategias, las ejecuten y que sean personas que multipliquen conocimientos en el beneficio de la prevención del consumo de spa. Las técnicas de recolección de información son grupos focales, entrevistas, metaplan y talleres. Como resultados de investigación se evidencia la autogestión comunitaria como un elemento de transformación de las poblaciones afectadas por la problemática de consumo desustancias psicoactivas; Como resultado de la estrategia, se tiene el convencimiento que a través de la Autogestión comunitaria se puede realizar transformación de las realidades sociales, con procesos planificados y organizados con el apoyo de todos los miembros de una comunidad en busca de dar solución a una problemática, siendo por lo consiguiente autores y protagonistas de sus propias propuestasThe IPS Generación IVProject armonizarían Center The Wala Nasa is a social organization located in the village of Los Robles via Timbio, private, committed and enabled to provide humanized services that contribute to the recovery of health by additions of our users improving their quality of life; with more than 20 years of experience in impact interventions in different communities nationwide and more than 10 years of experience in health recovery processes. The purpose of this strategy is that through self-management processes the people of the community to intervene empower themselves in the project, that they are themselves the creators of the strategies, execute them and that they are people who multiply knowledge for the benefit of the prevention of spa consumption. The information gathering techniques are focus groups, interviews, metaplan and workshops. As research results, community self-management is evidenced as an element of transformation of the populations affected by the problem of consumption of psychoactive substances; As a result of the strategy, there is the conviction that through community selfmanagement transformation of social realities can be carried out, with planned and organized processes with the support of all members of a community in search of solving a problem, being therefore authors and protagonists of their own proposal

    Alternatives for the construction of sustainable housing in Colombia associated with the sdg of the sector

    Get PDF
    El presente artículo desarrolla una propuesta académica orientada a la problemática del impacto al medio ambiente, la salud de las personas y el consumo de recursos naturales que se genera desde la actividad de construcción de vivienda en Colombia, de tal manera, se plantea como objetivo el identificar las alternativas para la construcción de viviendas sustentables en Colombia, desde la óptica de los ODS, ya que se destaca el compromiso que recae especialmente en las grandes empresas del sector para disponer obras con conciencia ambiental. Para ello se emplea un tipo de investigación descriptivo, con enfoque cualitativo, desarrollando una revisión documental de los modelos de vivienda sustentable más destacados a nivel nacional e internacional, para evaluar su aplicabilidad al caso colombiano, manteniendo la importancia de la gerencia estratégica de la calidad de estas alternativas para la garantía de una vivienda que atienda a los estándares de seguridad y de calidad para las personas, así como el uso adecuado de los recursos que son dispuestos en estas edificaciones. Esta investigación logra identificar la prevalencia del factor energético y de materiales de construcción, como uno de los que más se atienden en el diseño de las obras de vivienda sustentable, así como el uso de la tecnología como un componente esencial en la planificación de estas alternativas, donde se destaca que se debe tener el acompañamiento de una persona capacitada en estos modelos de energía limpia para su implementación en las viviendas.This article develops an academic proposal oriented to the problem of the impact on the environment, the health of people and the consumption of natural resources that is generated from the activity of housing construction in Colombia, in such a way, the objective is to identify alternatives for the construction of sustainable housing in Colombia, from the perspective of the SDGs, since it highlights the commitment that falls especially on large companies in the sector to arrange works with environmental awareness. For this, a type of descriptive research is used, with a qualitative approach, developing a documentary review of the most outstanding sustainable housing models at the national and international level, to evaluate their applicability to the Colombian case, maintaining the importance of strategic management of the quality of these alternatives for the guarantee of a home that meets the standards safety and quality for people, as well as the proper use of the resources that are available in these buildings. This research manages to identify the prevalence of the energy factor and construction materials, as one of the most attended in the design of sustainable housing works, as well as the use of technology as an essential component in the planning of these alternatives, where it is highlighted that you must have the accompaniment of a person trained in these clean energy models for their implementation in homes.Especializació
    • …
    corecore