1,465 research outputs found

    Education and training requirements for a practicing civil engineer to qualify for registration in Australasia and the United Kingdom

    Get PDF
    Paper ID: no. 8227The making a qualified and competent engineer requires education, practical training, and a professional assessment. Obtaining a professional registration is an indication of competence and willingness to shoulder the legal and social responsibilities required to be an engineer. It also gives the general public the sense of confidence for engineering works designed and constructed by engineers. The requirements and procedure of registration can be stipulated in law, and/or controlled by professional institutions. Different jurisdictions have thus imposed different requirements to suit their conditions. While engineering education programs in most jurisdictions do not differ too much from each other, the requirements for post-graduation training among jurisdictions may vary significantly. The professional …postprin

    Contention-Free Complete Exchange Algorithms on Clusters

    Get PDF
    To construct a large commodity clustec a hierarchical network is generally adopted for connecting the host muchines, where a Gigabit backbone switch connects a few commodity switches with uplinks to achieve scaled bisectional bandwidth. This type of interconnection usually results in link contention and has congestion developed at the uplink ports. Moreover, the non-detenninistic delays on scheduling communication events in clusters accelerate the building up of congestion amongst these uplink ports, which lead to severe packets drop and hinder the overall performance. In this paper, we focus on the practical design of high-speed complete exchange algorithm on a commodity cluster interconnected by a hierarchical Ethemet-based network. By exploiting some architectural characteristics of the interconnection in optimizing the performunce of a complete exchange algorithm, we introduce a congestion control mechanism - global windowing that monitors and regulates the trafic load, together with a permutation scheme - reorder scheme that effectively alleviates the congestion problem. We evaluate our algorithm and compare its performance with other algorithms in a PC cluster connected by various types of switches, including Gigabit Ethernet, input-buffered and shared-memory Fast Ethernet switches.published_or_final_versio

    Asset management of drainage facilities using advanced technologies

    Get PDF
    Parallel Session - Theme A4: Asset Management: A4-2The Drainage Services Department, in collaboration of the Water Supplies Department, of the Hong Kong SAR Government has to invest and maintain an extremely large public urban water infrastructural asset to provide world-class water supply, wastewater, and stormwater services to enable the sustainable development of the Hong Kong Special Administrative Region (SAR). A brief outline of the concepts of asset management is given in this paper. Effective management of urban water assets needs extensive planning, design and construction, and operation and maintenance. Accurate real-time data collection, transmission, and management in different inter-related functions of asset management become extremely important for the effective and efficient functioning of asset management. Some of these advanced technologies that have been and may be adopted in the Hong Kong SAR are presented in this paper.postprin

    Kinematic Analysis of Four Plyometric Push-Up Variations

    Get PDF
    International Journal of Exercise Science 5(4) : 334-343, 2012. Plyometric research in the upper extremity is limited, with the effects of open-chain plyometric exercises being studied most. Kinematic and ground reaction force data concerning closed-chain upper extremity plyometrics has yet to be examined. Twenty-one recreationally active male subjects performed four variations of plyometric push-ups in a counterbalanced order. These included box drop push-ups from 3.8 cm, 7.6 cm, 11.4 cm heights, and clap push-ups. Kinematics of the trunk, dominant extremity and both hands were collected to examine peak flight, elbow flexion at ground contact, elbow displacement, and hand separation. Additionally peak vertical ground reaction force was measured under the dominant extremity. The 11.4 cm and clap push-ups had significantly higher peak flight than the other variations (P\u3c.001). At ground contact, the elbow was in significantly greater flexion for the 3.8 cm and clap push-up compared to the other variations (P\u3c.001). The clap push-up had significantly more elbow displacement than the other variations (P\u3c.001) while hand separation was not significantly different between variations (P=.129). Peak vertical ground reaction force was significantly greater for the clap push-ups than for all other variations (P\u3c .001). Despite similar flight heights between the 11.4 cm and clap push-ups, the greater peak vertical ground reaction force and elbow displacement of the clap push-ups indicates the clap push-up is the most intense of the variations examined. Understanding the kinematic variables involved will aid in the creation of a closed chain upper-extremity plyometric progression

    Comparison of Visual Analog Pain Score Reported to Physician vs Nurse in Nonoperatively Treated Foot and Ankle Patients

    Get PDF
    Background: Patient reported outcome measures (PROMs) are taking a more prominent role in Orthopedics as health care seeks to define treatment outcomes. The Visual Analogue Scale (VAS) is considered a reliable measure of acute pain. A previous study found that operative candidates’ VAS pain score was significantly higher when reported to the surgeon compared to the nurse. This study’s aim is to examine whether this phenomenon occurs in nonoperative patients. We hypothesize that patients’ VAS scores reported to the surgeon and a nurse will be the same Methods: This study is a retrospective cohort of 201 consecutive nonoperative patients treated by a single surgeon. Patients were asked to rate pain intensity by a nurse followed by the surgeon using a horizontal VAS, 0 “no pain” to 10 worst pain”. Differences in reported pain levels were compared with data from the previous cohort of 201 consecutive operative patients. Results: The mean VAS score reported to the nurse was 3.2 whereas the mean VAS score reported to the surgeon was 4.2 (p\u3c.001). The mean difference in VAS scores reported for operative patients was 2.9, whereas the mean difference for nonoperative patients was 1.0 (p \u3c .001). Conclusion: This study found statistically significant differences between VAS scores reported to the surgeon versus the nurse in nonoperative patients which support the trend found in our previous study, where operative patients reported significantly higher scores to the surgeon. The mean difference between reported pain scores is significantly higher for operative patients compared to nonoperative patients

    Incidence, risk factors and causes of death in an HIV care programme with a large proportion of injecting drug users.

    Get PDF
    Objectives  To identify factors influencing mortality in an HIV programme providing care to large numbers of injecting drug users (IDUs) and patients co-infected with hepatitis C (HCV). Methods  A longitudinal analysis of monitoring data from HIV-infected adults who started antiretroviral therapy (ART) between 2003 and 2009 was performed. Mortality and programme attrition rates within 2 years of ART initiation were estimated. Associations with individual-level factors were assessed with multivariable Cox and piece-wise Cox regression. Results  A total of 1671 person-years of follow-up from 1014 individuals was analysed. Thirty-four percent of patients were women and 33% were current or ex-IDUs. 36.2% of patients (90.8% of IDUs) were co-infected with HCV. Two-year all-cause mortality rate was 5.4 per 100 person-years (95% CI, 4.4-6.7). Most HIV-related deaths occurred within 6 months of ART start (36, 67.9%), but only 5 (25.0%) non-HIV-related deaths were recorded during this period. Mortality was higher in older patients (HR = 2.50; 95% CI, 1.42-4.40 for ≥40 compared to 15-29 years), and in those with initial BMI < 18.5 kg/m(2) (HR = 3.38; 95% CI, 1.82-5.32), poor adherence to treatment (HR = 5.13; 95% CI, 2.47-10.65 during the second year of therapy), or low initial CD4 cell count (HR = 4.55; 95% CI, 1.54-13.41 for <100 compared to ≥100 cells/μl). Risk of death was not associated with IDU status (P = 0.38). Conclusion  Increased mortality was associated with late presentation of patients. In this programme, death rates were similar regardless of injection drug exposure, supporting the notion that satisfactory treatment outcomes can be achieved when comprehensive care is provided to these patients

    Seismic risk in the city of Al Hoceima (north of Morocco) using the vulnerability index method, applied in Risk-UE project

    Get PDF
    The final publication is available at Springer via http://dx.doi.org/10.1007/s11069-016-2566-8Al Hoceima is one of the most seismic active regions in north of Morocco. It is demonstrated by the large seismic episodes reported in seismic catalogs and research studies. However, seismic risk is relatively high due to vulnerable buildings that are either old or don’t respect seismic standards. Our aim is to present a study about seismic risk and seismic scenarios for the city of Al Hoceima. The seismic vulnerability of the existing residential buildings was evaluated using the vulnerability index method (Risk-UE). It was chosen to be adapted and applied to the Moroccan constructions for its practicality and simple methodology. A visual inspection of 1102 buildings was carried out to assess the vulnerability factors. As for seismic hazard, it was evaluated in terms of macroseismic intensity for two scenarios (a deterministic and probabilistic scenario). The maps of seismic risk are represented by direct damage on buildings, damage to population and economic cost. According to the results, the main vulnerability index of the city is equal to 0.49 and the seismic risk is estimated as Slight (main damage grade equal to 0.9 for the deterministic scenario and 0.7 for the probabilistic scenario). However, Moderate to heavy damage is expected in areas located in the newer extensions, in both the east and west of the city. Important economic losses and damage to the population are expected in these areas as well. The maps elaborated can be a potential guide to the decision making in the field of seismic risk prevention and mitigation strategies in Al Hoceima.Peer ReviewedPostprint (author's final draft

    Shake-table tests of a reinforced concrete frame designed following modern codes: seismic performance and damage evaluation

    Get PDF
    This paper presents shake-table tests conducted on a two-fifths-scale reinforced concrete frame representing a conventional construction design under current building code provisions in the Mediterranean area. The structure was subjected to a sequence of dynamic tests including free vibrations and four seismic simulations in which a historical ground motion record was scaled to levels of increasing intensity until collapse. Each seismic simulation was associated with a different level of seismic hazard, representing very frequent, frequent, rare and very rare earthquakes. The structure remained basically undamaged and within the inter-story drift limits of the "immediate occupancy" performance level for the very frequent and frequent earthquakes. For the rare earthquake, the specimen sustained significant damage with chord rotations of up to 28% of its ultimate capacity and approached the upper bound limit of inter-story drift associated with "life safety". The specimen collapsed at the beginning of the "very rare" seismic simulation. Besides summarizing the experimental program, this paper evaluates the damage quantitatively at the global and local levels in terms of chord rotation and other damage indexes, together with the energy dissipation demands for each level of seismic hazard. Further, the ratios of column-to-beam moment capacity recommended by Eurocode 8 and ACI-318 to guarantee the formation of a strong column-weak beam mechanism are examined
    corecore