8,587 research outputs found

    Energy Efficient Scheduling of MapReduce Jobs

    Full text link
    MapReduce is emerged as a prominent programming model for data-intensive computation. In this work, we study power-aware MapReduce scheduling in the speed scaling setting first introduced by Yao et al. [FOCS 1995]. We focus on the minimization of the total weighted completion time of a set of MapReduce jobs under a given budget of energy. Using a linear programming relaxation of our problem, we derive a polynomial time constant-factor approximation algorithm. We also propose a convex programming formulation that we combine with standard list scheduling policies, and we evaluate their performance using simulations.Comment: 22 page

    From Dataflow Specification to Multiprocessor Partitioned Time-triggered Real-time Implementation *

    Get PDF
    International audienceOur objective is to facilitate the development of complex time-triggered systems by automating the allocation and scheduling steps. We show that full automation is possible while taking into account the elements of complexity needed by a complex embedded control system. More precisely, we consider deterministic functional specifications provided (as often in an industrial setting) by means of synchronous data-flow models with multiple modes and multiple relative periods. We first extend this functional model with an original real-time characterization that takes advantage of our time-triggered framework to provide a simpler representation of complex end-to-end flow requirements. We also extend our specifications with additional non-functional properties specifying partitioning, allocation , and preemptability constraints. Then, weprovide novel algorithms for the off-line scheduling of these extended specifications onto partitioned time-triggered architectures Ă  la ARINC 653. The main originality of our work is that it takes into account at the same time multiple complexity elements: various types of non-functional properties (real-time, partitioning, allocation, preemptability) and functional specifications with conditional execution and multiple modes. Allocation of time slots/windows to partitions can be fullyor partially provided, or synthesized by our tool. Our algorithms allow the automatic allocation and scheduling onto multi-processor (distributed) sys-tems with a global time base, taking into account communication costs. We demonstrate our technique on a model of space flight software systemwith strong real-time determinism requirements

    Scheduling Algorithms for Procrastinators

    Full text link
    This paper presents scheduling algorithms for procrastinators, where the speed that a procrastinator executes a job increases as the due date approaches. We give optimal off-line scheduling policies for linearly increasing speed functions. We then explain the computational/numerical issues involved in implementing this policy. We next explore the online setting, showing that there exist adversaries that force any online scheduling policy to miss due dates. This impossibility result motivates the problem of minimizing the maximum interval stretch of any job; the interval stretch of a job is the job's flow time divided by the job's due date minus release time. We show that several common scheduling strategies, including the "hit-the-highest-nail" strategy beloved by procrastinators, have arbitrarily large maximum interval stretch. Then we give the "thrashing" scheduling policy and show that it is a \Theta(1) approximation algorithm for the maximum interval stretch.Comment: 12 pages, 3 figure

    Scheduling theory since 1981: an annotated bibliography

    Get PDF

    How the structure of precedence constraints may change the complexity class of scheduling problems

    Full text link
    This survey aims at demonstrating that the structure of precedence constraints plays a tremendous role on the complexity of scheduling problems. Indeed many problems can be NP-hard when considering general precedence constraints, while they become polynomially solvable for particular precedence constraints. We also show that there still are many very exciting challenges in this research area

    Implementing Multi-Periodic Critical Systems: from Design to Code Generation

    Full text link
    This article presents a complete scheme for the development of Critical Embedded Systems with Multiple Real-Time Constraints. The system is programmed with a language that extends the synchronous approach with high-level real-time primitives. It enables to assemble in a modular and hierarchical manner several locally mono-periodic synchronous systems into a globally multi-periodic synchronous system. It also allows to specify flow latency constraints. A program is translated into a set of real-time tasks. The generated code (\C\ code) can be executed on a simple real-time platform with a dynamic-priority scheduler (EDF). The compilation process (each algorithm of the process, not the compiler itself) is formally proved correct, meaning that the generated code respects the real-time semantics of the original program (respect of periods, deadlines, release dates and precedences) as well as its functional semantics (respect of variable consumption).Comment: 15 pages, published in Workshop on Formal Methods for Aerospace (FMA'09), part of Formal Methods Week 2009

    Energy-aware scheduling of bag-of-tasks applications on master-worker platforms

    Get PDF
    International audienceWe consider the problem of scheduling an application composed of independent tasks on a fully heterogeneous master-worker platform with communication costs. We introduce a bi-criteria approach aiming at maximizing the throughput of the application while minimizing the energy consumed by participating resources. Assuming arbitrary super-linear power consumption laws, we investigate different models, with energy overheads and memory constraints. Building upon closed-form expressions for the uni-processor case, we derive asymptotically optimal solutions for all models

    Solving a multiprocessor problem by column generation and branch-and-price

    Get PDF
    This work presents an algorithm for solving exactly a scheduling problem with identical parallel machines and malleable tasks, subject to arbitrary release dates and due dates. The objective is to minimize a function of late work and setup costs. A task is malleable if we can freely change the set of machines assigned to its processing over the time horizon. We present an integer programming model, a Dantzig-Wolfe decomposition reformulation and its solution by column generation. We also developed an equivalent network flow model, used for the branching phase. Finally, we carried out extensive computational tests to verify the algorithm’s efficiency and to determine the model’s sensitivity to instance size parameters: the number of machines, the number of tasks and the size of the planning horizon

    On the periodic behavior of real-time schedulers on identical multiprocessor platforms

    Full text link
    This paper is proposing a general periodicity result concerning any deterministic and memoryless scheduling algorithm (including non-work-conserving algorithms), for any context, on identical multiprocessor platforms. By context we mean the hardware architecture (uniprocessor, multicore), as well as task constraints like critical sections, precedence constraints, self-suspension, etc. Since the result is based only on the releases and deadlines, it is independent from any other parameter. Note that we do not claim that the given interval is minimal, but it is an upper bound for any cycle of any feasible schedule provided by any deterministic and memoryless scheduler
    • …
    corecore