610 research outputs found

    An optimization model for line planning and timetabling in automated urban metro subway networks

    Full text link
    In this paper we present a Mixed Integer Nonlinear Programming model that we developed as part of a pilot study requested by the R&D company Metrolab in order to design tools for finding solutions for line planning and timetable situations in automated urban metro subway networks. Our model incorporates important factors in public transportation systems from both, a cost-oriented and a passenger-oriented perspective, as time-dependent demands, interchange stations, short-turns and technical features of the trains in use. The incoming flows of passengers are modeled by means of piecewise linear demand functions which are parameterized in terms of arrival rates and bulk arrivals. Decisions about frequencies, train capacities, short-turning and timetables for a given planning horizon are jointly integrated to be optimized in our model. Finally, a novel Math-Heuristic approach is proposed to solve the problem. The results of extensive computational experiments are reported to show its applicability and effectiveness to handle real-world subway networksComment: 30 pages, 6 figures, 9 table

    Fewer Trains for Better Timetables: The Price of Fixed Line Frequencies in the Passenger-Oriented Timetabling Problem

    Get PDF
    This paper introduces the Passenger-Oriented Timetabling problem with flexible frequencies (POT-flex) in the context of railway planning problems. POT-flex aims at creating feasible railway timetables minimising total perceived passenger travel time. The contribution of the POT-flex lies in its relaxation of the generally adopted assumption that line frequencies should be a fixed part of the input. Instead, we consider flexible line frequencies, encompassing a minimum and maximum frequency per line, allowing the timetabling model to decide on optimal line frequencies to obtain better solutions using fewer train services per line. We develop a mixed-integer programming formulation for POT-flex based on the Passenger-Oriented Timetabling (POT) formulation of [Polinder et al., 2021] and compare the performance of the new formulation against the POT formulation on three instances. We find that POT-flex allows to find feasible timetables in instances containing bottlenecks, and show improvements of up to 2% on the largest instance tested. These improvements highlight the cost that fixed line frequencies can have on timetabling

    Efficiency and Robustness in Railway Operations

    Get PDF

    Operations research in passenger railway transportation

    Get PDF
    In this paper, we give an overview of state-of-the-art OperationsResearch models and techniques used in passenger railwaytransportation. For each planning phase (strategic, tactical andoperational), we describe the planning problems arising there anddiscuss some models and algorithms to solve them. We do not onlyconsider classical, well-known topics such as timetabling, rollingstock scheduling and crew scheduling, but we also discuss somerecently developed topics as shunting and reliability oftimetables.Finally, we focus on several practical aspects for each of theseproblems at the largest Dutch railway operator, NS Reizigers.passenger railway transportation;operation research;planning problems

    Optimization Methods in Modern Transportation Systems

    Get PDF
    One of the greatest challenges in the public transportation network is the optimization of the passengers waiting time, where it is necessary to find a compromise between the satisfaction of the passengers and the requirements of the transport companies. This paper presents a detailed review of the available literature dealing with the problem of passenger transport in order to optimize the passenger waiting time at the station and to meet the requirements of companies (maximize profits or minimize cost). After a detailed discussion, the paper clarifies the most important objectives in solving a timetabling problem: the requirements and satisfaction of passengers, passenger waiting time and capacity of vehicles. At the end, the appropriate algorithms for solving the set of optimization models are presented

    Overview of Infrastructure Charging, part 4, IMPROVERAIL Project Deliverable 9, “Improved Data Background to Support Current and Future Infrastructure Charging Systems”

    Get PDF
    Improverail aims are to further support the establishment of railway infrastructure management in accordance with Directive 91/440, as well as the new railway infrastructure directives, by developing the necessary tools for modelling the management of railway infrastructure; by evaluating improved methods for capacity and resources management, which allow the improvement of the Life Cycle Costs (LCC) calculating methods, including elements related to vehicle - infrastructure interaction and external costs; and by improving data background in support of charging for use of railway infrastructure. To achieve these objectives, Improverail is organised along 8 workpackages, with specific objectives, responding to the requirements of the task 2.2.1/10 of the 2nd call made in the 5th RTD Framework Programme in December 1999.This part is the task 7.1 (Review of infrastructure charging systems) to the workpackage 7 (Analysis of the relation between infrastructure cost variation and diversity of infrastructure charging systems).Before explaining the economic characteristics of railway and his basic pricing principles, authors must specify the objectives of railways infrastructure charging.principle of pricing ; rail infrastructure charging ; public service obligation ; rail charging practice ; Europe ; Improverail

    An iterative heuristic for passenger-centric train timetabling with integrated adaption times

    Get PDF
    In this paper we present a method to construct a periodic timetable from a tactical planning perspective. We aim at constructing a timetable that is feasible with respect to infrastructure constraints and minimizes average perceived passenger travel time. In addition to in-train and transfer times, our notion of perceived passenger time includes the adaption time (waiting time at the origin station). Adaption time minimization allows us to avoid strict frequency regularity constraints and, at the same time, to ensure regular connections between passengers’ origins and destinations. The combination of adaption time minimization and infrastructure constraints satisfaction makes the problem very challenging. The described periodic timetabling problem can be modelled as an extension of a Peri- odic Event Scheduling Problem (PESP) formulation, but requires huge computing times if it is directly solved by a general-purpose solver for instances of realistic size. In this paper, we propose a heuristic approach consisting of two phases that are executed iteratively. First, we solve a mixed-integer linear program to determine an ideal timetable that mini- mizes the average perceived passenger travel time but neglects infrastructure constraints. Then, a Lagrangian-based heuristic makes the timetable feasible with respect to infras- tructure constraints by modifying train departure and arrival times as little as possible. The obtained feasible timetable is then evaluated to compute the resulting average per- ceived passenger travel time, and a feedback is sent to the Lagrangian-based heuristic so as to possibly improve the obtained timetable from the passenger perspective, while still respecting infrastructure constraints. We illustrate the proposed iterative heuristic approach on real-life instances of Netherlands Railways and compare it to a benchmark approach, showing that it finds a feasible timetable very close to the ideal one

    Reliability and heterogeneity of railway services

    Get PDF
    Reliability is one of the key factors in transportation, both for passengers and for cargo. This paper examines reliability in public railway systems. Reliability of railway services is a complex matter, since there are many causes for disruptions and at least as many causes for delays to spread around in space and time. One way to increase the reliability is to reduce the propagation of delays due to the interdependencies between trains. In this paper we attempt to decrease these interdependencies by reducing the running time differences per track section, i.e. by creating more homogeneous timetables. Because of the complexity of railway systems, we use network wide simulation for the analysis of the alternative timetables. We report on both theoretical and practical cases. Besides a comparison of different timetables, also general timetabling principles are deduced.heterogeneity;simulation;reliability;transportation;railways

    Stochastic Improvement of Cyclic Railway Timetables

    Get PDF
    Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can cope with the stochastic disturbances as well as possible. For that purpose, a timetable usually contains time supplements in several process times and buffer times between pairs of consecutive trains. This paper describes a Stochastic Optimization Model that can be used to allocate the time supplements and the buffer times in a given timetable in such a way that the timetable becomes maximally robust against stochastic disturbances. The Stochastic Optimization Model was tested on several instances of NS Reizigers, the main operator of passenger trains in the Netherlands. Moreover, a timetable that was computed by the model was operated in practice in a timetable experiment on the so-called “Zaanlijnâ€. The results show that the average delays of trains can often be reduced significantly by applying relatively small modifications to a given timetable.Railway Timetabling;Stochastic Optimization;Robustness
    corecore