1,382 research outputs found

    Alternatif Pemecahan Masalah Open Shop Schedulling Dengan Pendekatan Algoritma Genetik Dan Heuristik

    Full text link
    One of industrial problem is Open Shop Schedulling (OSS). This research try topropose open shop schedulling problem alternative solution with genetic and heuristicapproach. First we try to make a genetic coding for this problem. Machine schedulling systemanalogue as individu, chromosom analogue as a machine (task), and gen analogue as theoperation. Each individu consist of chromosoms, and each chromosom consist of gens. Weused two methods which represented by coding by operation and code task-operation. Afterchromosom coding detected, fitness function can determine the function of givingchromosoms weight to choose parent chromosom and changing population. Fitness functiondesign base on minimum sum of zero time on each machine with high efficiency, and lack ofoverlapping job for each machine

    The predictive functional control and the management of constraints in GUANAY II autonomous underwater vehicle actuators

    Get PDF
    Autonomous underwater vehicle control has been a topic of research in the last decades. The challenges addressed vary depending on each research group's interests. In this paper, we focus on the predictive functional control (PFC), which is a control strategy that is easy to understand, install, tune, and optimize. PFC is being developed and applied in industrial applications, such as distillation, reactors, and furnaces. This paper presents the rst application of the PFC in autonomous underwater vehicles, as well as the simulation results of PFC, fuzzy, and gain scheduling controllers. Through simulations and navigation tests at sea, which successfully validate the performance of PFC strategy in motion control of autonomous underwater vehicles, PFC performance is compared with other control techniques such as fuzzy and gain scheduling control. The experimental tests presented here offer effective results concerning control objectives in high and intermediate levels of control. In high-level point, stabilization and path following scenarios are proven. In the intermediate levels, the results show that position and speed behaviors are improved using the PFC controller, which offers the smoothest behavior. The simulation depicting predictive functional control was the most effective regarding constraints management and control rate change in the Guanay II underwater vehicle actuator. The industry has not embraced the development of control theories for industrial systems because of the high investment in experts required to implement each technique successfully. However, this paper on the functional predictive control strategy evidences its easy implementation in several applications, making it a viable option for the industry given the short time needed to learn, implement, and operate, decreasing impact on the business and increasing immediacy.Peer ReviewedPostprint (author's final draft

    On-demand Audio Streaming Menggunakan Metode Peer to Peer Block Scheduling

    Full text link
    Audio streaming adalah memainkanberkas suara lewat jaringan sebelum berkas sepenuhnyaselesai diunduh, saat ini semakin banyak yangmemanfaatkan audio streaming. Makin banyaknya orangyang menggunakan audio streaming menimbulkanmasalah pada penerapan sistem audio streamingkonvensional yang terpusat. Dengan sistem terpusatmaka sumberdaya yang dibutuhkan pelayan (server)pusat harus makin besar mengikuti perkembanganpengguna. Pada audio streaming peer to peer metodeblock scheduling tidak ada pelayan (server) terpusat yangterbebani, melainkan beban didistribusikan padapengguna itu sendiri. Audio streaming Peer to Peermetode block scheduling di Implementasikanmenggunakan protokol TCP dengan memanfaatkan APISocket. Dari hasil pengujian beban pelayanan audiostreaming terbagi hampir sama rata pada sistem audiostreaming peer to peer metode block scheduling.Kata Kunci— Audio Streaming, Peer to Peer, TCP,Socket

    ANALISIS KINERJA BIAYA DENGAN METODE NILAI HASIL (EARNED VALUE ANALYSIS) PADA PEKERJAAN PEMBANGUNAN AULA LEMBAGA PENJAMIN MUTU PENDIDIKAN SAMARINDA KALIMANTAN TIMUR

    Get PDF
    : In the implementation of a network construction project it is rare to find a project that is exactly as planned. Hall construction work is an effort carried out in development with the aim of gaining a return on investment, therefore an integrated cost analysis is needed to avoid losses that can be controlled by the project in terms of cost by the Earned Value method. in this study is the construction of the Hall of the Education Quality Assurance Institute (LPMP) on Cipto Mangunkusumo KM.2 Samarinda Seberang, East Kalimantan as a research location, in this study the cost of building the Hall will be evaluated During the project implementation there are many obstacles that may occur that cause the project to experience a loss in costs, not in accordance with the planned or delayed work, A method is needed that aims to control these constraints during project implementation in order to avoid losses in the development activities. Using the Earned Value Analysis method, in the Hall of Education Quality Assurance Institution building project on Cipto Mangunkusumo KM.2 Samarinda, Seber- ang, East Kalimantan as the research location. This research was conducted to control project costs in an integrated manner with the Earned Value method so that it can know the performance of the activities being carried out and can increase effectiveness in increasing project activities in order to obtain maximum results from available resources. Can be concluded the results of the cost calculation using the earned value analysis method in the LPMP Hall construction. In this study Time and Cost Performance Analysis with Value Earned Analysis Method in Mulawarman Residence Samarinda Housing Development resulted in the value of SPI 0.907 while the CPI was 1,024, From the results of the calculation of the costs for the remaining work (ETC) the results obtained are Rp. 350,486,693.22, and for the estimated total cost of the project with the estimated total cost of the project (EAC) the results were 3,078,214,349,5

    ANALISIS KOMPETENSI MANAJER PROYEK BERPENGARUH TERHADAP KINERJA KONSTRUKSI DI KOTA DENPASAR DAN KABUPATEN BADUNG

    Get PDF
    Proyek konstruksi gedung swasta di Kota Denpasar dan Kabupaten Badung tidak terlepas dari masalah di dalam pelaksanaannya yang salah satunya diakibatkan oleh kurangnya kompetensi manajer proyek terhadap tanggung-jawab mengendalikan semua sumber daya yang dimiliki demi pencapaian sasaran proyek. Dalam hal ini peran Manajer Proyek sangat menentukan kinerja konstruksi dalam hal ketepatan waktu penyelesaian proyek, biaya yang tidak melebihi  anggaran yang telah direncanakan, serta tercapainya mutu atau hasil proyek harus memenuhi spesifikasi dan kriteria yang dipersyaratkan. Sehingga, perlu dilakukan penelitian mengenai analisis kompetensi yang wajib dimiliki oleh  manajer proyek berdasarkan 4 aspek yang ditinjau meliputi aspek kemampuan conseptual, kemampuan interpersonal/social skills, kemampuan administrasi, serta kemampuan teknis/technical skills dan menganalisis pengaruh kompetensi manajer proyek terhadap kinerja kontruksi gedung di Kota Denpasar dan Kabupaten Badung serta upaya yang dapat dilakukan oleh perusahaan jasa konstruksi terkait peningkatan kompetensi manajer proyek.Penelitian dilakukan pada proyek konstruksi gedung swasta di Kota Denpasar dan Kabupaten Badung secara kuantitatif dan kualitatif. Pengumpulan data dilakukan dengan studi literatur, wawancara, brainstrorming, dan kuisioner kepada para pakar. Metode pemilihan responden dengan purposive sampling yaitu responden dipilih berdasarkan kriteria yang ditentukan. Analisis data yang dipergunakan yaitu analisis Structural Equation Modelling (SEM) melalui pendekatan Partial Least Squares (PLS) dengan alat bantu software SmartPLS 3.0. Hasil pengujian menunjukkan bahwa Human Relationship Skills, Problem Solving dan Decision Making, Leadership Skills, Communication Skills, Marketing, Contracting, dan Customer Relationship Skills, Negotiating Skills, Resources Management, Schedulling dan Time Management Skills, Budgeting dan Cost Skills, serta Experience dan Technical Construction berpengaruh terhadap Kinerja konstruksi sebesar 97,80 %, dan sisanya 2,20 % di luar penelitian ini. Kompetensi manajer proyek yang memiliki pengaruh paling kuat terhadap kinerja konstruksi adalah Leadership Skills dengan nilai Original Sample (O) 0,205 lebih besar dibandingkan dengan variabel lainnya. Maka dari itu, manajer proyek hendaknya dapat meningkatkan  kompetensi leadership skills dalam mencapai kinerja konstruksi yang memadai

    ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE NILAI HASIL (EARNED VALUE ANALYSIS) PADA PEKERJAAN PEMBANGUNAN PERUMAHAN MANDIRI 2 SAMARINDA

    Get PDF
    Untuk analisa Skripsi ini peninjauan dilakukan selama 16 minggu pelaksanaan proyek yaitu, 04 Mei 2019 sampai dengan 04 desember 2020 atau selama 16 minggu. Sedangkan analisa perhitungan Earned Value dibagi menjadi 4 kali laporan peninjauan, yaitu laporan bulan pertama, laporan bulan kedua, laporan bulan ketiga laporan bulan keempat. Progress rencana sampai minggu ke 16 sebesar 100% sedangkan progress realisasi dilapangan adalah 46,69%. Jadwal pelaksanaan proyek yaitu mulai tanggal 02 Januari 2018 dan direncanakan selesai pada tanggal 02 Mei 2020, terhitung selama 120 hari atau 16 minggu. Pada akhir minggu peninjauan minggu ke-16 ini prestasi pekerjaan mencapai 46,69% , padahal direncanakan 100%. Dengan anggaran rencana sebesar Rp. 699.109.000;- dari prestasi tersebut didapat nilai BCWP (Budgeted Cost of Work Perfomance) sebesar Rp. 257,992,668 dengan anggaran actual yang dikeluarkan sebesar Rp. 250,344,597 Dari ketiga nilai indikator kinerja yang diperoleh didapatkan nilai SV (Schedulling Variance) sebesar -295.290.592 nilai negatif menunjukan waktu pelaksanaan proyek mengalami keterlambatan dari jadwal perencanaan. Sedangkan nilai CV (Cost Variance) sebesar Rp. 7.648.071 nilai positif menunjukan biaya yang lebih rendah untuk pekerjaan yang sudah terlaksana pada minggu tersebut. Nilai SV (Schedulling Variance) dan CV (Cost Variance) menunjukan bahwa kondisi proyek sampai minggu ke-16 mengalami keterlambatan dari jadwal yang direncanakan namun mengalami penghematan biaya dari yang dianggarkan. Untuk nilai SPI (Schedulling Perfomance Index) sampai minggu ke-16 adalah 0.466 angka ini menunjukan kinerja proyek yang mengalami keterlambatan dari jadwal. Sedangkan nilai CPI (Cost Perfomance Index) adalah 1.031 yang menunjukan pengeluaran biaya yang lebih rendah dari anggaran untuk pekerjaan yang telah dilaksanakan. Proyek direncanakan berlangsung selama 120 hari. Pelaporan dilakukan pada akhir minggu ke-16 tanggal 02 Mei 2018 yaitu pada hari ke 120 proyek berjalan, Diperkirakan dari perhitungan TE (Time Schedulling) proyek akan selesai dalam waktu 268 hari. Jika performa seperti ini akan mengalami keterlambatan dari jadwal awal perencanaan. Dari ETC ( perkiraan untuk pekerjaan tersisa ) tersebut, didapatkan perkiraan biaya total proyek adalah Rp. 678,196,762 Nilai biaya mengalami penurunan dari biaya yang dianggarkan untuk pekerjaan yang terlaksana Pada akhir peninjauan pada minggu ke-16, kinerja jadwal proyek (SPI) sebesar 0.447 lebih kecil dari 1, menunjukan bahwa proyek mengalami keterlambatan dari rencana awal proyek yang direncanakan sebesar 100% dengan realisasi pekerjaan 46.69% Sedangkan dari kinerja biaya, nilai CPI (Cost Perfomance Index) adalah 1.031 lebih besar dari 1 yang berarti terjadi penghematan atau biaya actual yang lebih kecil dari pekerjaan yang telah terlaksana. Perkiraan waktu penyelesaian proyek bertambah dari 16 minggu menjadi 38 minggu. Besar Biaya Penyelesaian Proyek Dari hasil perhitungan biaya untuk pekerjaan tersisa (ETC) didapat hasil yaitu Rp. 438,244,281.28, dan untuk perkiraan biaya total proyek dengan perhitungan perkiraan biaya total proyek (EAC) didapat hasil 678,196,762, Keuntungan dan Kerugian pada Pelaksanaan Proyek. Berdasarkan pelaporan pada minggu terkahir nilai CV (Cost Variance) pada akhir peninjauan adalah Rp. 7.326.665, dimana terjadi pengeluaran biaya aktual yang lebih sedikit atau kontraktor mengalami keuntungan selama proyek berlangsung. Nilai SV (Schedulling Variance) dan CV (Cost Variance) menunjukan bahwa kondisi proyek sampai minggu ke-16 mengalami keterlambatan dari jadwal yang direncanakan namun mengalami penghematan biaya dari yang dianggarkan. Untuk nilai SPI (Schedulling Perfomance Index) sampai minggu ke-16 adalah 0.447 angka ini menunjukan kinerja proyek yang mengalami keterlambatan dari jadwal. Sedangkan nilai CPI (Cost Perfomance Index) adalah 1.031 yang menunjukan pengeluaran biaya yang lebih rendah dari anggaran untuk pekerjaan yang telah dilaksanaka

    Development of deficit irrigation for maize crop under drip irrigation in samaru-nigeria

    Get PDF
    In the past, outcome of any water management strategy could only be known after field experiment, in recent times, means of evaluating the implications of irrigation schedules without field experiment is fast gaining grounds with the use of models.  This research work present a scenarios studies for different developed irrigation scheduling options for a drip irrigated maize crop at the Institute for Agricultural Research (IAR) irrigation farm Samaru-Nigeria during 2013 and 2014 cropping season using a computer-based model.  Aqua Crop was calibrated and validated with data obtained from the field, it was further used to generate scenario of different irrigation scheduling outcome. Grain and biomass yields, harvest index, seasonal evapotranspiration and crop water productivity were determined.  The general trend of the results suggests that skipping regular irrigations may be advantageous if such is done at grain-filling stage, though most of the time this stage is intercepted by rain in the study area.  The scenario studies showed that the peak grain and biomass yield value of 3273 and 10492 kgha-1 was recorded when 20 mm water application depth (WAD) with 3-day irrigation interval applied across all the growth stages; the irrigation water productivity with respect to grain and biomass yield were 0.83 and 2.65 kg m-3 respectively.  The possible consequences of a developed irrigation scheduling on the crop and its environment, could be analysed without necessarily going to the field.  The Aqua Crop model is useful for on-the-desk assessing of the impact of irrigation schedulling protocols.

    Instruction Scheduler of C Compiler for VLIW Architecture

    Get PDF
    Tato práce pojednává o architektuře procesorů typu VLIW a části překladače určené pro plánování instrukcí. Dále popisuje kompilační platformu LLVM - zejména části důležité pro vytvoření plánovacího průchodu pro VLIW architekturu. Vytvoření nového plánovacího průchodu je cílem této práce. Jsou zde zhodnoceny výsledky testování tohoto průchodu, jež bylo provedeno na architektuře VEX.This bachelor thesis discusses about VLIW processor architecture and about the part of the compiler which is designed for instruction scheduling. It describes LLVM compiling platform, especially those parts which are important to create new schedulling pass for VLIW architecture. Creation schedulling pass is also a result of this work. Futhermore, test results of newly Scheduling pass are described. Test was conducted on VEX architecture.
    corecore