    Algorithms for scheduling projects with generalized precedence relations.

    Get PDF
    Project scheduling under the assumption of renewable resource constraints and generalized precedence relations, i.e. arbitrary minimal and maximal time lags between the starting and completion times of the activities of the project, constitutes an important and challenging problem. Over the past few years considerable progress has been made in the use of exact solution procedure for this problem type and its variants. We review the fundamental logic and report new computational experience with a branch-and-bound procedure for optimally solving resource-constrained project scheduling problems with generalized precedence relations of the precedence diagramming type, i.e. start-start, start-finish, finish-start and finish-finish relations with minimal time lags for minimizing the project makespan. Subsequently, we review and report new results for several branch-and -bound procedures for the case of generalized precedence relations, including both minimal and maximal time lags, and demonstrate how the solution methodology can be expected to cope with other regular and nonregular objective functions such a smaximizing the net present value of a project.Networks; Problems; Scheduling; Algorithms; Functions; Net present value;

    Planning and Scheduling of Business Processes in Run-Time: A Repair Planning Example

    Get PDF
    Over the last decade, the efficient and flexible management of business processes has become one of the most critical success aspects. Furthermore, there exists a growing interest in the application of Artificial Intelligence Planning and Scheduling techniques to automate the production and execution of models of organization. However, from our point of view, several connections between both disciplines remains to be exploited. The current work presents a proposal for modelling and enacting business processes that involve the selection and order of the activities to be executed (planning), besides the resource allocation (scheduling), considering the optimization of several functions and the reach of some objectives. The main novelty is that all decisions (even the activities selection) are taken in run-time considering the actual parameters of the execution, so the business process is managed in an efficient and flexible way. As an example, a complex and representative problem, the repair planning problem, is managed through the proposed approach.Ministerio de Ciencia e Innovación TIN2009-13714Junta de Andalucía P08-TIC-0409

    An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations.

    Get PDF
    In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted cash flows and generalized precedence relations (further denoted as RCPSPDC-GPR). The RCPSPDC-GPR extends the RCPSP to (a) arbitrary minimal and maximal time lags between the starting and completion times of activities and (b) the non-regular objective function of maximizing the net present value of the project with positive and/or negative cash flows associated with the activities.). To the best of our knowledge, the literature on the RCPSPDC-GPR is completely void. We present a depth-first branch-and-bound algorithm in which the nodes in the search tree represent the original project network extended with extra precedence relations which resolve a number of resource conflicts. These conflicts are resolved using the concept of a minimal delaying mode (De Reyck and Herroelen, 1996b). An upper bound on the project net present value as well as several dominance rules are used to fathom large portions of the search tree. Extensive computational experience on a randomly generated benchmark problem set is obtained.Scheduling; Optimal; Discounted cash flow; Cash flow;

    Exact and suboptimal reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.

    Get PDF
    In order to cope with the uncertainty inherent in practical project management, proactive and/or reactive strategies can be used. Proactive strategies try to anticipate future disruptions by incorporating slack time or excess resource availability into the schedule, whereas reactive strategies react after a disruption happened and try to revert to a feasible schedule. Traditionally, reactive approaches have focused on obtaining a good schedule with respect to the original objective function or a schedule that deviates as little as possible from the baseline schedule. In this paper, we present various approaches, exact as well as heuristic, for optimizing the latter objective and thus encouraging schedule stability. Furthermore, in contrast to traditional rescheduling algorithms, we present a new heuristic that also takes future uncertainty into account when repairing the schedule. We consider a variant of the resource- constrained project scheduling problem in which the uncertainty is modeled by means of unexpected resource breakdowns. The results of an extensive computational experiment are given to compare the performance of the proposed strategies.Schedule stability; Stability; Algorithms; Heuristic; Uncertainty; Project scheduling; Scheduling; Performance; Strategy; Order; Project management; Management; Time;

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    A robust fuzzy possibilistic AHP approach for partner selection in international strategic alliance

    Get PDF
    The international strategic alliance is an inevitable solution for making competitive advantage and reducing the risk in today’s business environment. Partner selection is an important part in success of partnerships, and meanwhile it is a complicated decision because of various dimensions of the problem and inherent conflicts of stockholders. The purpose of this paper is to provide a practical approach to the problem of partner selection in international strategic alliances, which fulfills the gap between theories of inter-organizational relationships and quantitative models. Thus, a novel Robust Fuzzy Possibilistic AHP approach is proposed for combining the benefits of two complementary theories of inter-organizational relationships named, (1) Resource-based view, and (2) Transaction-cost theory and considering Fit theory as the perquisite of alliance success. The Robust Fuzzy Possibilistic AHP approach is a noveldevelopment of Interval-AHP technique employing robust formulation; aimed at handling the ambiguity of the problem and let the use of intervals as pairwise judgments. The proposed approach was compared with existing approaches, and the results show that it provides the best quality solutions in terms of minimum error degree. Moreover, the framework implemented in a case study and its applicability were discussed

    Design of testbed and emulation tools

    Get PDF
    The research summarized was concerned with the design of testbed and emulation tools suitable to assist in projecting, with reasonable accuracy, the expected performance of highly concurrent computing systems on large, complete applications. Such testbed and emulation tools are intended for the eventual use of those exploring new concurrent system architectures and organizations, either as users or as designers of such systems. While a range of alternatives was considered, a software based set of hierarchical tools was chosen to provide maximum flexibility, to ease in moving to new computers as technology improves and to take advantage of the inherent reliability and availability of commercially available computing systems