555 research outputs found
Solving two production scheduling problems with sequence-dependent set-up times
In today�s competitive markets, the importance of good scheduling strategies in manufacturing companies lead to the need of developing efficient methods to solve complex scheduling problems. In this paper, we studied two production scheduling problems with sequence-dependent setups times. The setup times are one of the most common complications in scheduling problems, and are usually associated with cleaning operations and changing tools and shapes in machines. The first problem considered is a single-machine scheduling with release dates, sequence-dependent setup times and delivery times. The performance measure is the maximum lateness. The second problem is a job-shop scheduling problem with sequence-dependent setup times where the objective is to minimize the makespan. We present several priority dispatching rules for both problems, followed by a study of their performance. Finally, conclusions and directions of future research are presented.Production-scheduling, set-up times, priority dispatching rules
Order Acceptance and Scheduling: A Taxonomy and Review
Over the past 20 years, the topic of order acceptance has attracted considerable attention from those who study scheduling and those who practice it. In a firm that strives to align its functions so that profit is maximized, the coordination of capacity with demand may require that business sometimes be turned away. In particular, there is a trade-off between the revenue brought in by a particular order, and all of its associated costs of processing. The present study focuses on the body of research that approaches this trade-off by considering two decisions: which orders to accept for processing, and how to schedule them. This paper presents a taxonomy and a review of this literature, catalogs its contributions and suggests opportunities for future research in this area
Bütünleşik tedarik zinciri çizelgeleme modelleri: Bir literatür taraması
Research on integration of supply chain and scheduling is relatively recent, and
number of studies on this topic is increasing. This study provides a comprehensive
literature survey about Integrated Supply Chain Scheduling (ISCS) models to help
identify deficiencies in this area. For this purpose, it is thought that this study will
contribute in terms of guiding researchers working in this field. In this study,
existing literature on ISCS problems are reviewed and summarized by introducing
the new classification scheme. The studies were categorized by considering the
features such as the number of customers (single or multiple), product lifespan
(limited or unlimited), order sizes (equal or general), vehicle characteristics
(limited/sufficient and homogeneous/heterogeneous), machine configurations and
number of objective function (single or multi objective). In addition, properties of
mathematical models applied for problems and solution approaches are also
discussed.Bütünleşik Tedarik Zinciri Çizelgeleme (BTZÇ) üzerine yapılan araştırmalar
nispeten yenidir ve bu konu üzerine yapılan çalışma sayısı artmaktadır. Bu çalışma,
bu alandaki eksiklikleri tespit etmeye yardımcı olmak için BTZÇ modelleri hakkında
kapsamlı bir literatür araştırması sunmaktadır. Bu amaçla, bu çalışmanın bu alanda
çalışan araştırmacılara rehberlik etmesi açısından katkı sağlayacağı
düşünülmektedir. Bu çalışmada, BTZÇ problemleri üzerine mevcut literatür gözden
geçirilmiş ve yeni sınıflandırma şeması tanıtılarak çalışmalar özetlenmiştir.
Çalışmalar; tek veya çoklu müşteri sayısı, sipariş büyüklüğü tipi (eşit veya genel),
ürün ömrü (sınırlı veya sınırsız), araç karakteristikleri (sınırlı/yeterli ve
homojen/heterojen), makine konfigürasyonları ve amaç fonksiyonu sayısı (tek veya
çok amaçlı) gibi özellikler dikkate alınarak kategorize edildi. Ayrıca problemler için
uygulanan matematiksel modellerin özellikleri ve çözüm yaklaşımları da
tartışılmıştır
Scheduling Single-Machine Problem Oriented by Just-In-Time Principles - A Case Study
Developments in advanced autonomous production resources have increased the interest in the Single-Machine Scheduling Problem (SMSP). Until now, researchers used SMSP with little to no practical application in industry, but with the introduction of multi-purpose machines, able of executing an entire task, such as 3D Printers, replacing extensive production chains, single-machine problems are becoming a central point of interest in real-world scheduling. In this paper we study how simple, easy to implement, Just-in-Time (JIT) based, constructive heuristics, can be used to optimize customer and enterprise oriented performance measures. Customer oriented performance measures are mainly related to the accomplishment of due dates while enterprise-oriented ones typically consider other time-oriented measures.The authors wish to acknowledge the support of the Fundação para a Ciência e Tecnologia (FCT), Portugal, through the grant “Projeto Estratégico – UI 252 – 2011–2012” reference PEst-OE/EME/UI0252/2011 and FCOMP-01-0124FEDER-PEst-OE/EEI/UI0760/2014info:eu-repo/semantics/publishedVersio
Scheduling in assembly type job-shops
Assembly type job-shop scheduling is a generalization of the job-shop scheduling problem to include assembly operations. In the assembly type job-shops scheduling problem, there are n jobs which are to be processed on in workstations and each job has a due date. Each job visits one or more workstations in a predetermined route. The primary difference between this new problem and the classical job-shop problem is that two or more jobs can merge to foul\u27 a new job at a specified workstation, that is job convergence is permitted. This feature cannot be modeled by existing job-shop techniques. In this dissertation, we develop scheduling procedures for the assembly type job-shop with the objective of minimizing total weighted tardiness. Three types of workstations are modeled: single machine, parallel machine, and batch machine. We label this new scheduling procedure as SB. The SB procedure is heuristic in nature and is derived from the shifting bottleneck concept. SB decomposes the assembly type job-shop scheduling problem into several workstation scheduling sub-problems. Various types of techniques are used in developing the scheduling heuristics for these sub-problems including the greedy method, beam search, critical path analysis, local search, and dynamic programming.
The performance of SB is validated on a set of test problems and compared with priority rules that are normally used in practice. The results show that SB outperforms the priority rules by an average of 19% - 36% for the test problems. SB is extended to solve scheduling problems with other objectives including minimizing the maximum completion time, minimizing weighted flow time and minimizing maximum weighted lateness. Comparisons with the test problems, indicate that SB outperforms the priority rules for these objectives as well.
The SB procedure and its accompanying logic is programmed into an object oriented scheduling system labeled as LEKIN. The LEKIN program includes a standard library of scheduling rules and hence can be used as a platform for the development of new scheduling heuristics. In industrial applications LEKIN allows schedulers to obtain effective machine schedules rapidly. The results from this research allow us to increase shop utilization, improve customer satisfaction, and lower work-in-process inventory without a major capital investment
Recommended from our members
A Digital Twin Framework for Production Planning Optimization: Applications for Make-To-Order Manufacturers
In this dissertation, we develop a Digital Twin framework for manufacturing systems and apply it to various production planning and scheduling problems faced by Make-To-Order (MTO) firms. While this framework can be used to digitally represent a particular manufacturing environment with high fidelity, our focus is in using it to generate realistic settings to test production planning and scheduling algorithms in practice. These algorithms have traditionally been tested by either translating a practical situation into the necessary modeling constructs, without discussion of the assumptions and inaccuracies underlying this translation, or by generating random instances of the modeling constructs, without assessing the limitations in accurately representing production environments. The consequence has been a serious gap between theory advancement and industry practice. The major goal of this dissertation is to develop a framework that allows for practical testing, evaluation, and implementation of new approaches for seamless industry adoption. We develop this framework as a modular software package and emphasize the practicality and configurability of the framework, such that minimal modelling effort is required to apply the framework to a multitude of optimization problems and manufacturing systems. Throughout this dissertation, we emphasize the importance of the underlying scheduling problems which provide the basis for additional operational decision making. We focus on the computational evaluation and comparisons of various modeling choices within the developed frameworks, with the objective of identifying models which are both effective and computationally efficient. In Part 1 of this dissertation, we consider a class of Production Planning and Execution problems faced by job shop manufacturing systems. In Part 2 of this dissertation, we consider a class of scheduling problems faced by manufacturers whose production system is dominated by a single operation
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Resource-constrained project scheduling.
Abstract: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types. The objective of this paper is to provide a survey of what we believe are important recent in the area . Our main focus will be on the recent progress made in and the encouraging computational experience gained with the use of optimal solution procedures for the basic resource-constrained project scheduling problem (RCPSP) and important extensions. The RCPSP involves the scheduling of a project its duration subject to zero-lag finish-start precedence constraints of the PERT/CPM type and constant availability constraints on the required set of renewable resources. We discuss recent striking advances in dealing with this problem using a new depth-first branch-and-bound procedure, elaborating on the effective and efficient branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive a set of conclusions from the research on optimal solution procedures for the basis RCPSP and subsequently illustrate how effective and efficient branching rules and several of the strong dominance and bounding arguments can be extended to a rich and realistic variety of related problems. The preemptive resource-constrained project scheduling problem (PRCPSP) relaxes the nonpreemption condition of the RCPSP, thus allowing activities to be interrupted at integer points in time and resumed later without additional penalty cost. The generalized resource-constrained project scheduling (GRCPSP) extends the RCPSP to the case of precedence diagramming type of precedence constraints (minimal finish-start, start-start, start-finish, finish-finish precedence relations), activity ready times, deadlines and variable resource availability's. The resource-constrained project scheduling problem with generalized precedence relations (RCPSP-GPR) allows for start-start, finish-start and finish-finish constraints with minimal and maximal time lags. The MAX-NPV problem aims at scheduling project activities in order to maximize the net present value of the project in the absence of resource constraints. The resource-constrained project scheduling problem with discounted cash flows (RCPSP-DC) aims at the same non-regular objective in the presence of resource constraints. The resource availability cost problem (RACP) aims at determining the cheapest resource availability amounts for which a feasible solution exists that does not violate the project deadline. In the discrete time/cost trade-off problem (DTCTP) the duration of an activity is a discrete, non-increasing function of the amount of a single nonrenewable resource committed to it. In the discrete time/resource trade-off problem (DTRTP) the duration of an activity is a discrete, non-increasing function of the amount of a single renewable resource. Each activity must then be scheduled in one of its possible execution modes. In addition to time/resource trade-offs, the multi-mode project scheduling problem (MRCPSP) allows for resource/resource trade-offs and constraints on renewable, nonrenewable and doubly-constrained resources. We report on recent computational results and end with overall conclusions and suggestions for future research.Scheduling; Optimal;
- …