    Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach

    Get PDF
    Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.Peer Reviewe

    Rehearsal Scheduling Problem

    Get PDF
    Scheduling is a common task that plays a crucial role in many industries such as manufacturing or servicing. In a competitive environment, effective scheduling is one of the key factors to reduce cost and increase productivity. Therefore, scheduling problems have been studied by many researchers over the past thirty years. Rehearsal scheduling problem (RSP) is similar to the popular resource-constrained project scheduling problem (RCPSP); however, it does not have activity precedence constraints and the resources’ availabilities are not fixed during processing time. RSP can be used to schedule rehearsal in theatre industry or to schedule group scheduling when each member has different sets of available time. In this report, three different approaches are proposed to solve RSP including Constraint Programming, Integer Programming, and Schedule Generation Schemes

    A Decision Support System for Ship Maintenance Capacity Planning

    Get PDF
    In this paper, the basic framework and algorithms of a decision support system are discussed, which enhance process and capacity planning at a large repair shop. The research is strongly motivated by experiences in a project carried out at a dockyard, which performs repair, overhaul and modification programs for various classes of navy ships. We outline the basic requirements placed upon order acceptance, process planning and capacity scheduling for large maintenance projects. In subsequent sections a number of procedures and algorithms to deal with these requirements, in particular a procedure for workload-based capacity planning, a database system to support process planning are developed, as well as a resource-constrained project scheduling system to support work planning at a more detailed level. The system has been designed to support decision making at the Navy Dockyard in particular, however, we believe that, due to its generic structure, it is applicable to a wide range of project-based manufacturing and maintenance environments

    Scheduling Limited Resources in Engineering Projects

    Get PDF
    Because of high customizations in the one-of-a-kind production companies (OKP companies), these companies need to find a way for reducing the production cost, shortening the production lead-time, and maintaining the quality of the productions as in the mass production system MP.s. Currently, production scheduling in OKP system follows the traditional mass production system, which focus on time and inventory, and it is inapplicable. Actually, OKP system works based on customer requirements, where each order can be representing as multi-project based. In this paper, One-of-a-kind production OKP has been referred as a project-based production and as a flexible resource- constrained project scheduling problems (FRCPSs); because in practice, some of project activities cannot be pre-determined due to its high customizations and great uncertainties. A new model has been proposed based on these assumptions to create production schedules for OKP system, which focuses on time and resources as in project management system PM. s, and deals with the problem which have three categories of project activities A, B, and C. The per-findings indicated that the model enhances the applicability of resulting schedules, emulates what a project manager in practice does (i.e. adding or removing resources from tasks to have the project completed in time), increase the number of feasible solutions, and reduces the project duration

    A survey of variants and extensions of the resource-constrained project scheduling problem

    Get PDF
    The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. --project scheduling,modeling,resource constraints,temporal constraints,networks

    Railway scheduling reduces the expected project makespan.

    Get PDF
    The Critical Chain Scheduling and Buffer Management (CC/BM) methodology, proposed by Goldratt (1997), introduced the concepts of feeding buffers, project buffers and resource buffers as well as the roadrunner mentality. This last concept, in which activities are started as soon as possible, was introduced in order to speed up projects by taking advantage of predecessors finishing early. Later on, the railway scheduling concept of never starting activities earlier than planned was introduced as a way to increase the stability of the project, typically at the cost of an increase in the expected project makespan. In this paper, we will indicate a realistic situation in which railway scheduling improves both the stability and the expected project makespan over roadrunner scheduling.Railway scheduling; Roadrunner scheduling; Feeding buffer; Priority list; Resource availability;

    Resource-constrained project scheduling.

    Get PDF
    Abstract: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types. The objective of this paper is to provide a survey of what we believe are important recent in the area . Our main focus will be on the recent progress made in and the encouraging computational experience gained with the use of optimal solution procedures for the basic resource-constrained project scheduling problem (RCPSP) and important extensions. The RCPSP involves the scheduling of a project its duration subject to zero-lag finish-start precedence constraints of the PERT/CPM type and constant availability constraints on the required set of renewable resources. We discuss recent striking advances in dealing with this problem using a new depth-first branch-and-bound procedure, elaborating on the effective and efficient branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive a set of conclusions from the research on optimal solution procedures for the basis RCPSP and subsequently illustrate how effective and efficient branching rules and several of the strong dominance and bounding arguments can be extended to a rich and realistic variety of related problems. The preemptive resource-constrained project scheduling problem (PRCPSP) relaxes the nonpreemption condition of the RCPSP, thus allowing activities to be interrupted at integer points in time and resumed later without additional penalty cost. The generalized resource-constrained project scheduling (GRCPSP) extends the RCPSP to the case of precedence diagramming type of precedence constraints (minimal finish-start, start-start, start-finish, finish-finish precedence relations), activity ready times, deadlines and variable resource availability's. The resource-constrained project scheduling problem with generalized precedence relations (RCPSP-GPR) allows for start-start, finish-start and finish-finish constraints with minimal and maximal time lags. The MAX-NPV problem aims at scheduling project activities in order to maximize the net present value of the project in the absence of resource constraints. The resource-constrained project scheduling problem with discounted cash flows (RCPSP-DC) aims at the same non-regular objective in the presence of resource constraints. The resource availability cost problem (RACP) aims at determining the cheapest resource availability amounts for which a feasible solution exists that does not violate the project deadline. In the discrete time/cost trade-off problem (DTCTP) the duration of an activity is a discrete, non-increasing function of the amount of a single nonrenewable resource committed to it. In the discrete time/resource trade-off problem (DTRTP) the duration of an activity is a discrete, non-increasing function of the amount of a single renewable resource. Each activity must then be scheduled in one of its possible execution modes. In addition to time/resource trade-offs, the multi-mode project scheduling problem (MRCPSP) allows for resource/resource trade-offs and constraints on renewable, nonrenewable and doubly-constrained resources. We report on recent computational results and end with overall conclusions and suggestions for future research.Scheduling; Optimal;

    Large-scale Zone-based Evacuation Planning: Generating Convergent and Non-Preemptive Evacuation Plans via Column Generation

    Get PDF
    In zone-based evacuations, the evacuated region is divided into zones, and vehicles follow the single evacuation path assigned to their corresponding zone. Ideally, these evacuation paths converge at intersections to reduce driver hesitation; and non-preemptive schedules ensure that the evacuation of a zone proceeds without interruptions once it starts. We present a column-generation algorithm that produces convergent and non-preemptive evacuation plans in real large-scale evacuation scenarios. Furthermore, we compare our algorithm against existing models that produce convergent paths or non-preemptive schedules separately. Finally, we use a traffic simulator to evaluate the quality of the generated plans

    Optimising airline maintenance scheduling decisions

    Get PDF
    Airline maintenance scheduling (AMS) studies how plans or schedules are constructed to ensure that a fleet is efficiently maintained and that airline operational demands are met. Additionally, such schedules must take into consideration the different regulations airlines are subject to, while minimising maintenance costs. In this thesis, we study different formulations, solution methods, and modelling considerations, for the AMS and related problems to propose two main contributions. First, we present a new type of multi-objective mixed integer linear programming formulation which challenges traditional time discretisation. Employing the concept of time intervals, we efficiently model the airline maintenance scheduling problem with tail assignment considerations. With a focus on workshop resource allocation and individual aircraft flight operations, and the use of a custom iterative algorithm, we solve large and long-term real-world instances (16000 flights, 529 aircraft, 8 maintenance workshops) in reasonable computational time. Moreover, we provide evidence to suggest, that our framework provides near-optimal solutions, and that inter-airline cooperation is beneficial for workshops. Second, we propose a new hybrid solution procedure to solve the aircraft recovery problem. Here, we study how to re-schedule flights and re-assign aircraft to these, to resume airline operations after an unforeseen disruption. We do so while taking operational restrictions into account. Specifically, restrictions on aircraft, maintenance, crew duty, and passenger delay are accounted for. The flexibility of the approach allows for further operational restrictions to be easily introduced. The hybrid solution procedure involves the combination of column generation with learning-based hyperheuristics. The latter, adaptively selects exact or metaheuristic algorithms to generate columns. The five different algorithms implemented, two of which we developed, were collected and released as a Python package (Torres Sanchez, 2020). Findings suggest that the framework produces fast and insightful recovery solutions