    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Discrete and fuzzy dynamical genetic programming in the XCSF learning classifier system

    Full text link
    A number of representation schemes have been presented for use within learning classifier systems, ranging from binary encodings to neural networks. This paper presents results from an investigation into using discrete and fuzzy dynamical system representations within the XCSF learning classifier system. In particular, asynchronous random Boolean networks are used to represent the traditional condition-action production system rules in the discrete case and asynchronous fuzzy logic networks in the continuous-valued case. It is shown possible to use self-adaptive, open-ended evolution to design an ensemble of such dynamical systems within XCSF to solve a number of well-known test problems

    Nature-Inspired Adaptive Architecture for Soft Sensor Modelling

    Get PDF
    This paper gives a general overview of the challenges present in the research field of Soft Sensor building and proposes a novel architecture for building of Soft Sensors, which copes with the identified challenges. The architecture is inspired and making use of nature-related techniques for computational intelligence. Another aspect, which is addressed by the proposed architecture, are the identified characteristics of the process industry data. The data recorded in the process industry consist usually of certain amount of missing values or sample exceeding meaningful values of the measurements, called data outliers. Other process industry data properties causing problems for the modelling are the collinearity of the data, drifting data and the different sampling rates of the particular hardware sensors. It is these characteristics which are the source of the need for an adaptive behaviour of Soft Sensors. The architecture reflects this need and provides mechanisms for the adaptation and evolution of the Soft Sensor at different levels. The adaptation capabilities are provided by maintaining a variety of rather simple models. These particular models, called paths in terms of the architecture, can for example focus on different partition of the input data space, or provide different adaptation speeds to changes in the data. The actual modelling techniques involved into the architecture are data-driven computational learning approaches like artificial neural networks, principal component regression, etc

    A New Method for Fuzzy Critical Path Analysis in Project Networks with a New Representation of Triangular Fuzzy Numbers

    Get PDF
    The method for finding fuzzy optimal solution of fully fuzzy critical path (FFCP) problems i.e., critical path problems in which all the parameters are represented by fuzzy numbers, is at best scant; possibly non-existent. In this paper, a method is proposed to find the fuzzy optimal solution of FFCP problems, together with a new representation of triangular fuzzy numbers. This paper will show the advantages of using, the proposed representation over the existing representations of triangular fuzzy numbers and will present with great clarity the proposed method and illustrate its application to FFCP problems occurring in real life situations

    Fuzzy uncertainty modelling for project planning; application to helicopter maintenance

    Get PDF
    Maintenance is an activity of growing interest specially for critical systems. Particularly, aircraft maintenance costs are becoming an important issue in the aeronautical industry. Managing an aircraft maintenance center is a complex activity. One of the difficulties comes from the numerous uncertainties that affect the activity and disturb the plans at short and medium term. Based on a helicopter maintenance planning and scheduling problem, we study in this paper the integration of uncertainties into tactical and operational multiresource, multi-project planning (respectively Rough Cut Capacity Planning and Resource Constraint Project Scheduling Problem). Our main contributions are in modelling the periodic workload on tactical level considering uncertainties in macro-tasks work contents, and modelling the continuous workload on operational level considering uncertainties in tasks durations. We model uncertainties by a fuzzy/possibilistic approach instead of a stochastic approach since very limited data are available. We refer to the problems as the Fuzzy RoughCut Capacity Problem (FRCCP) and the Fuzzy Resource Constraint Project Scheduling Problem (RCPSP).We apply our models to helicopter maintenance activity within the frame of the Helimaintenance project, an industrial project approved by the French Aerospace Valley cluster which aims at building a center for civil helicopter maintenance