18,471 research outputs found

    Heuristic Solutions for Loading in Flexible Manufacturing Systems

    Get PDF
    Production planning in flexible manufacturing system deals with the efficient organization of the production resources in order to meet a given production schedule. It is a complex problem and typically leads to several hierarchical subproblems that need to be solved sequentially or simultaneously. Loading is one of the planning subproblems that has to addressed. It involves assigning the necessary operations and tools among the various machines in some optimal fashion to achieve the production of all selected part types. In this paper, we first formulate the loading problem as a 0-1 mixed integer program and then propose heuristic procedures based on Lagrangian relaxation and tabu search to solve the problem. Computational results are presented for all the algorithms and finally, conclusions drawn based on the results are discussed

    Survey of dynamic scheduling in manufacturing systems

    Get PDF

    Job-shop scheduling with an adaptive neural network and local search hybrid approach

    Get PDF
    This article is posted here with permission from IEEE - Copyright @ 2006 IEEEJob-shop scheduling is one of the most difficult production scheduling problems in industry. This paper proposes an adaptive neural network and local search hybrid approach for the job-shop scheduling problem. The adaptive neural network is constructed based on constraint satisfactions of job-shop scheduling and can adapt its structure and neuron connections during the solving process. The neural network is used to solve feasible schedules for the job-shop scheduling problem while the local search scheme aims to improve the performance by searching the neighbourhood of a given feasible schedule. The experimental study validates the proposed hybrid approach for job-shop scheduling regarding the quality of solutions and the computing speed

    Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities

    Get PDF
    Studies had stated that less attention was given to the education aspect, such as teaching and learning in planning for improving the TVET system. Due to the 21st Century context, the current paradigm of teaching for the TVET educators also has been reported to be fatal and need to be shifted. All these disadvantages reported hindering the country from achieving the 5th strategy in the Strategic Plan for Vocational Education Transformation to transform TVET system as a whole. Therefore, this study aims to develop a framework for sustainable TVET Teacher Education program in Malaysia. This study had adopted an Exploratory Sequential Mix-Method design, which involves a semi-structured interview (phase one) and survey method (phase two). Nine experts had involved in phase one chosen by using Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers were selected as the survey sample chosen through random sampling method. After data analysis in phase one (thematic analysis) and phase two (Principal Component Analysis), eight domains and 22 elements have been identified for the framework for sustainable TVET-TE program in Malaysia. This framework was identified to embed the elements of 21st Century Education, thus filling the gap in this research. The research findings also indicate that the developed framework was unidimensional and valid for the development and research regarding TVET-TE program in Malaysia. Lastly, it is in the hope that this research can be a guide for the nations in producing a quality TVET teacher in the future

    An improved constraint satisfaction adaptive neural network for job-shop scheduling

    Get PDF
    Copyright @ Springer Science + Business Media, LLC 2009This paper presents an improved constraint satisfaction adaptive neural network for job-shop scheduling problems. The neural network is constructed based on the constraint conditions of a job-shop scheduling problem. Its structure and neuron connections can change adaptively according to the real-time constraint satisfaction situations that arise during the solving process. Several heuristics are also integrated within the neural network to enhance its convergence, accelerate its convergence, and improve the quality of the solutions produced. An experimental study based on a set of benchmark job-shop scheduling problems shows that the improved constraint satisfaction adaptive neural network outperforms the original constraint satisfaction adaptive neural network in terms of computational time and the quality of schedules it produces. The neural network approach is also experimentally validated to outperform three classical heuristic algorithms that are widely used as the basis of many state-of-the-art scheduling systems. Hence, it may also be used to construct advanced job-shop scheduling systems.This work was supported in part by the Engineering and Physical Sciences Research Council (EPSRC) of UK under Grant EP/E060722/01 and in part by the National Nature Science Fundation of China under Grant 60821063 and National Basic Research Program of China under Grant 2009CB320601

    Scheduling commercial advertisements for television

    Get PDF
    The problem of scheduling the commercial advertisements in the television industry is investigated. Each advertiser client demands that the multiple airings of the same brand advertisement should be as spaced as possible over a given time period. Moreover, audience rating requests have to be taken into account in the scheduling. This is the first time this hard decision problem is dealt with in the literature. We design two mixed integer linear programming (MILP) models. Two constructive heuristics, local search procedures and simulated annealing (SA) approaches are also proposed. Extensive computational experiments, using several instances of various sizes, are performed. The results show that the proposed MILP model which represents the problem as a network flow obtains a larger number of optimal solutions and the best non-exact procedure is the one that uses SA
    • …
    corecore