226 research outputs found

    Orbital transfer vehicle concept definition and system analysis study, 1986. Volume 9: Study extension results

    Get PDF
    The purpose of this extension to the OTV Concept Definition and Systems Analysis Study was to improve the definition of the OTV Program that will be most beneficial to the nation in the 1995 to 2010 timeframe. The implications of the defined mission and defined launch vehicle are investigated. The key mission requirements identified for the Space Transportation Architecture Study (STAS) were established and reflect a need for early capability and more ambitious capability growth. The key technical objectives and related issues addressed are summarized. The analyses of selected areas including aerobrake design, proximity operations, and the balance of EVA and IVA operations used in the support of the OTV at the space-base were enhanced. Sensitivity studies were conducted to establish how the OTV program should be tailored to meet changing circumstances

    A management model for closed-loop supply chains of reusable articles

    Get PDF
    This PhD dissertation is framed in the emergent fields of Reverse Logistics and ClosedLoop Supply Chain (CLSC) management. This subarea of supply chain management has gained researchers and practitioners' attention over the last 15 years to become a fully recognized subdiscipline of the Operations Management field. More specifically, among all the activities that are included within the CLSC area, the focus of this dissertation is centered in direct reuse aspects. The main contribution of this dissertation to current knowledge is twofold. First, a framework for the so-called reuse CLSC is developed. This conceptual model is grounded in a set of six case studies conducted by the author in real industrial settings. The model has also been contrasted with existing literature and with academic and professional experts on the topic as well. The framework encompasses four building blocks. In the first block, a typology for reusable articles is put forward, distinguishing between Returnable Transport Items (RTI), Reusable Packaging Materials (RPM), and Reusable Products (RP). In the second block, the common characteristics that render reuse CLSC difficult to manage from a logistical standpoint are identified, namely: fleet shrinkage, significant investment and limited visibility. In the third block, the main problems arising in the management of reuse CLSC are analyzed, such as: (1) define fleet size dimension, (2) control cycle time and promote articles rotation, (3) control return rate and prevent shrinkage, (4) define purchase policies for new articles, (5) plan and control reconditioning activities, and (6) balance inventory between depots. Finally, in the fourth block some solutions to those issues are developed. Firstly, problems (2) and (3) are addressed through the comparative analysis of alternative strategies for controlling cycle time and return rate. Secondly, a methodology for calculating the required fleet size is elaborated (problem (1)). This methodology is valid for different configurations of the physical flows in the reuse CLSC. Likewise, some directions are pointed out for further development of a similar method for defining purchase policies for new articles (problem (4)). The second main contribution of this dissertation is embedded in the solutions part (block 4) of the conceptual framework and comprises a two-level decision problem integrating two mixed integer linear programming (MILP) models that have been formulated and solved to optimality using AIMMS as modeling language, CPLEX as solver and Excel spreadsheet for data introduction and output presentation. The results obtained are analyzed in order to measure in a client-supplier system the economic impact of two alternative control strategies (recovery policies) in the context of reuse. In addition, the models support decision-making regarding the selection of the appropriate recovery policy against the characteristics of demand pattern and the structure of the relevant costs in the system. The triangulation of methods used in this thesis has enabled to address the same research topic with different approaches and thus, the robustness of the results obtained is strengthened

    Essays On Perioperative Services Problems In Healthcare

    Get PDF
    One of the critical challenges in healthcare operations management is to efficiently utilize the expensive resources needed while maintaining the quality of care provided. Simulation and optimization methods can be effectively used to provide better healthcare services. This can be achieved by developing models to minimize patient waiting times, minimize healthcare supply chain and logistics costs, and maximize access. In this proposal, we study some of the important problems in healthcare operations management. More specifically, we focus on perioperative services and study scheduling of operating rooms (ORs) and management of necessary resources such as staff, equipment, and surgical instruments. We develop optimization and simulation methods to coordinate material handling decisions, inventory management, and OR scheduling. In Chapter 1 of this dissertation, we investigate material handling services to improve the flow of surgical materials in hospitals. The ORs require timely supply of surgical materials such as surgical instruments, linen, and other additional equipment required to perform the surgeries. The availability of surgical instruments at the right location is crucial to both patient safety and cost reduction in hospitals. Similarly, soiled material must also be disposed of appropriately and quickly. Hospitals use automated material handling systems to perform these daily tasks, minimize workforce requirements, reduce risk of contamination, and reduce workplace injuries. Most of the literature related to AGV systems focuses on improving their performance in manufacturing settings. In the last 20 years, several articles have addressed issues relevant to healthcare systems. This literature mainly focuses on improving the design and management of AGV systems to handle the specific challenges faced in hospitals, such as interactions with patients, staff, and elevators; adhering to safety standards and hygiene, etc. In Chapter 1, we focus on optimizing the delivery of surgical instrument case carts from material departments to ORs through automated guided vehicles (AGV). We propose a framework that integrates data analysis with system simulation and optimization. We test the performance of the proposed framework through a case study developed using data from a partnering hospital, Greenville Memorial Hospital (GMH) in South Carolina. Through an extensive set of simulation experiments, we investigate whether performance measures, such as travel time and task completion time, improve after a redesign of AGV pathways. We also study the impact of fleet size on these performance measures and use simulation-optimization to evaluate the performance of the system for different fleet sizes. A pilot study was conducted at GMH to validate the results of our analysis. We further evaluated different policies for scheduling the material handling activities to assess their impact on delays and the level of inventory required. Reducing the inventory level of an instrument may negatively impact the flexibility in scheduling surgeries, cause delays, and therefore, reduce the service level provided. On the other hand, increasing inventory levels may not necessarily eliminate the delays since some delays occur because of inefficiencies in the material handling processes. Hospitals tend to maintain large inventories to ensure that the required instruments are available for scheduled surgery. Typically, the inventory level of surgical instruments is determined by the total number of surgeries scheduled in a day, the daily schedule of surgeries that use the same instrument, the processing capacity of the central sterile storage division (CSSD), and the schedule of material handling activities. Using simulation-optimization tools, we demonstrate that integrating decisions of material handling activities with inventory management has the potential to reduce the cost of the system. In Chapter 2 we focus on coordinating OR scheduling decisions with efficient management of surgical instruments. Hospitals pay more attention to OR scheduling. This is because a large portion of hospitals\u27 income is due to surgical procedures. Inventory management of decisions follows the OR schedules. Previous work points to the cost savings and benefits of optimizing the OR scheduling process. However, based on our review of the literature, only a few articles discuss the inclusion of instrument inventory-related decisions in OR schedules. Surgical instruments are classified as (1) owned by the hospital and (2) borrowed from other hospitals or vendors. Borrowed instruments incur rental costs that can be up to 12-25\% of the listed price of the surgical instrument. A daily schedule of ORs determines how many rental instruments would be required to perform all surgeries in a timely manner. A simple strategy used in most hospitals is to first schedule the ORs, followed by determining the instrument assignments. However, such a strategy may result in low utilization of surgical instruments owned by hospitals. Furthermore, creating an OR schedule that efficiently uses available surgical instruments is a challenging problem. The problem becomes even more challenging in the presence of material handling delays, stochastic demand, and uncertain surgery duration. In this study, we propose an alternative scheduling strategy in which the OR scheduling and inventory management decisions are coordinated. More specifically, we propose a mixed-integer programming model that integrates instrument assignment decisions with OR scheduling to minimize costs. This model determines how many ORs to open, determines the schedule of ORs, and also identifies the instrument assignments for each surgery. If the level of instrument inventory cannot meet the surgical requirements, our model allows instruments to be rented at a higher cost. We introduce and evaluate the solution methods for this problem. We propose a Lagrangean decomposition-based heuristic, which is an iterative procedure. This heuristic separates the scheduling problem from the inventory assignment problem. These subproblems are computationally easier to solve and provide a lower bound on the optimal cost of the integrated OR scheduling problem. The solution of the scheduling subproblem is used to generate feasible solutions in every iteration. We propose two alternatives to find feasible solutions to our problem. These alternatives provide an upper bound on the cost of the integrated scheduling problem. We conducted a thorough sensitivity analysis to evaluate the impact of different parameters, such as the length of the scheduling horizon, the number of ORs that can be used in parallel, the number of surgeries, and various cost parameters on the running time and quality of the solution. Using a case study developed at GMH, we demonstrate that integrating OR scheduling decisions with inventory management has the potential to reduce the cost of the system. The objective of Chapter 3 is to develop quick and efficient algorithms to solve the integrated OR scheduling and inventory management problem, and generate optimal/near-optimal solutions that increase the efficiency of GMH operations. In Chapter 2, we introduced the integrated OR scheduling problem which is a combinatorial optimization problem. As such, the problem is challenging to solve. We faced these challenges when trying to solve the problem directly using the Gurobi solver. The solutions obtained via construction heuristics were much farther from optimality while the Lagrangean decomposition-based heuristics take several hours to find good solutions for large-sized problems. In addition, those methods are iterative procedures and computationally expensive. These challenges have motivated the development of metaheuristics to solve OR scheduling problems, which have been shown to be very effective in solving other combinatorial problems in general and scheduling problems in particular. In Chapter 3, we adopt a metaheuristic, Tabu search, which is a versatile heuristic that is used to solve many different types of scheduling problems. We propose an improved construction heuristic to generate an initial solution. This heuristic identifies the number if ORs to be used and then the assignment of surgeries to ORs. In the second step, this heuristic identifies instrument-surgery assignments based on a first-come, first-serve basis. The proposed Tabu search method improves upon this initial solution. To explore different areas of the feasible region, we propose three neighborhoods that are searched one after the other. For each neighborhood, we create a preferred attribute candidate list which contains solutions that have attributes of good solutions. The solutions on this list are evaluated first before examining other solutions in the neighborhood. The solutions obtained with Tabu search are compared with the lower and upper bounds obtained in Chapter \ref{Ch2}. Using a case study developed at GMH, we demonstrate that high-quality solutions can be obtained by using very little computational time

    Space station needs, attributes and architectural options study. Volume 1: Executive study

    Get PDF
    Mission identification and validation, the benefits of a manned presence in space; attributes and architectures; time-phased mission and system requirements imposed on the space station; orbit selection; space station architectural options; technology selection; and program planning are addressed

    Space Transportation Materials and Structures Technology Workshop

    Get PDF
    The Space Transportation Materials and Structures Technology Workshop was held on September 23-26, 1991, in Newport News, Virginia. The workshop, sponsored by the NASA Office of Space Flight and the NASA Office of Aeronautics and Space Technology, was held to provide a forum for communication within the space materials and structures technology developer and user communities. Workshop participants were organized into a Vehicle Technology Requirements session and three working panels: Materials and Structures Technologies for Vehicle Systems, Propulsion Systems, and Entry Systems

    Aerospace Manufacturing-Remanufacturing System Modeling and Optimization

    Get PDF
    In recent years, increasing environmental concerns, costs of raw materials, and stricter government regulations have resulted in companies striving to reduce their waste materials. An earlier approach adopted was the recycling of materials such as waste paper, glass and metals. However, recycled products typically lose a portion of their added values. Different waste reduction options such as direct reuse, repair, refurbishing, cannibalization, and remanufacturing were studied to overcome this drawback. Remanufacture recaptures the value added to materials when a product was first manufactured. In the aerospace industry, where safety and performance are the overriding concerns and repairs are highly regulated, it could be perceived that remanufacturing has minimal appeal. However, the very low design tolerance of manufactured components results in a high percentage of defects. Due to the high price of raw materials, remanufacturing and components saving through “transforming” could be applied in imperfect production systems to reduce the amount of scrap materials. In this thesis, a general model is first proposed for a closed-loop supply chain network which includes the following processes: repairs, remanufacturing and transforming of selected defective components and end-of-life products, and cannibalization. A mixed integer linear programming formulation is developed to investigate the effect of various factors on profit, inventory carrying cost, and number of scrap components. Uncertainty in demand and lead-time is one of the major issues in any manufacturing supply chain. Uncertainty is incorporated into an extended model through the scenario-analysis approach and outsourcing is considered as an option for remanufacturing of the customer owned components. Demand of final products is assumed to be deterministic. The defect rate of disassembled components, however, is considered to be variable which makes the demand for spares to be variable. The lead-time of in-house remanufacturing of the customer owned components is also considered to be variable. Sensitivity analysis is performed to investigate the effect of capacity, inventory carrying cost, outsourcing cost, lead-time, and defect rate variation on profit and amount of scraps. The inventory carrying cost variations have direct effect on the inventory turnover ratio. The maximum capacity of the outsourced company and process costs per unit have significant effect on the profitability. Maintaining a long-term relationship with third-party service providers, designing the components with a longer life cycle, and transforming and remanufacturing of defective components directly impact the profitability over the life cycle of a product

    Solar Power Satellite Concept Evaluation. Volume 1: Summary

    Get PDF
    A program was developed to determine the technical feasiblity of a satellite solar power station. The space construction, maintenance, and transport systems are discussed. Environmental factors, in addition to manufacturing, natural resources, and energy were considered. Cost estimates and alternative systems are outlined

    Formulation of a cislunar human transportation architecture through the use of analytic, heuristic, and parametric algorithms

    Get PDF
    The purpose of this study was to conduct a conceptual design study for a lunar transfer vehicle, thus considering the question of whether or not it is possible to conduct a human lunar return given a restriction to exclusively use currently existing technology. A variety of analytic, parametric, and heuristic techniques were used to develop a comprehensive vehicle design. A modular design resulted, consisting of six component spacecraft and an associated mission control environment. A cost analysis was performed to determine an approximate funding level required to support such a vehicle. Recommendations for integration of this lunar transfer vehicle design with a lunar surface base are provided as well as recommendations for further research

    Proceedings of the First Karlsruhe Service Summit Workshop - Advances in Service Research, Karlsruhe, Germany, February 2015 (KIT Scientific Reports ; 7692)

    Get PDF
    Since April 2008 KSRI fosters interdisciplinary research in order to support and advance the progress in the service domain. KSRI brings together academia and industry while serving as a European research hub with respect to service science. For KSS2015 Research Workshop, we invited submissions of theoretical and empirical research dealing with the relevant topics in the context of services including energy, mobility, health care, social collaboration, and web technologies

    The Second Conference on Lunar Bases and Space Activities of the 21st Century, volume 1

    Get PDF
    These papers comprise a peer-review selection of presentations by authors from NASA, LPI industry, and academia at the Second Conference (April 1988) on Lunar Bases and Space Activities of the 21st Century, sponsored by the NASA Office of Exploration and the Lunar Planetary Institute. These papers go into more technical depth than did those published from the first NASA-sponsored symposium on the topic, held in 1984. Session topics covered by this volume include (1) design and operation of transportation systems to, in orbit around, and on the Moon, (2) lunar base site selection, (3) design, architecture, construction, and operation of lunar bases and human habitats, and (4) lunar-based scientific research and experimentation in astronomy, exobiology, and lunar geology
    corecore