12,142 research outputs found
Electrical Loads and Power Systems for the DEMO Nuclear Fusion Project
EU-DEMO is a European project, having the ambitious goal to be the first demonstrative
power plant based on nuclear fusion. The electrical power that is expected to be produced is in the
order of 700â800 MW, to be delivered via a connection to the European High Voltage electrical grid.
The initiation and control of fusion processes, besides the problems related to the nuclear physics,
need very complex electrical systems. Moreover, also the conversion of the output power is not
trivial, especially because of the inherent discontinuity in the EU-DEMO operations. The present
article concerns preliminary studies for the feasibility and realization of the nuclear fusion power
plant EU-DEMO, with a special focus on the power electrical systems. In particular, the first stage of
the study deals with the survey and analysis of the electrical loads, starting from the steady-state
loads. Their impact is so relevant that could jeopardy the efficiency and the convenience of the plant
itself. Afterwards, the loads are inserted into a preliminary internal distribution grid, sizing the main
electrical components to carry out the power flow analysis, which is based on simulation models
implemented in the DIgSILENT PowerFactory software
Performance evaluation of secondary control policies with respect to digital communications properties in inverter-based islanded microgrids
A key challenge for inverted-based microgrids working in islanded mode is to maintain their own frequency and voltage to a certain reference values while regulating the active and reactive power among distributed generators and loads. The implementation of frequency and voltage restoration control policies often requires the use of a digital communication network for real-time data exchange (tertiary control covers the coordi- nated operation of the microgrid and the host grid). Whenever a digital network is placed within the loop, the operation of the secondary control may be affected by the inherent properties of the communication technology. This paper analyses the effect that properties like transmission intervals and message dropouts have for four existing representative approaches to secondary control in a scalable islanded microgrid. The simulated results reveals pros and cons for each approach, and identifies threats that properly avoided or handled in advance can prevent failures that otherwise would occur. Selected experimental results on a low- scale laboratory microgrid corroborate the conclusions extracted from the simulation study.Peer ReviewedPostprint (author's final draft
Power quality and electromagnetic compatibility: special report, session 2
The scope of Session 2 (S2) has been defined as follows by the Session Advisory Group and the Technical Committee: Power Quality (PQ), with the more general concept of electromagnetic compatibility (EMC) and with some related safety problems in electricity distribution systems.
Special focus is put on voltage continuity (supply reliability, problem of outages) and voltage quality (voltage level, flicker, unbalance, harmonics). This session will also look at electromagnetic compatibility (mains frequency to 150 kHz), electromagnetic interferences and electric and magnetic fields issues. Also addressed in this session are electrical safety and immunity concerns (lightning issues, step, touch and transferred voltages).
The aim of this special report is to present a synthesis of the present concerns in PQ&EMC, based on all selected papers of session 2 and related papers from other sessions, (152 papers in total). The report is divided in the following 4 blocks:
Block 1: Electric and Magnetic Fields, EMC, Earthing systems
Block 2: Harmonics
Block 3: Voltage Variation
Block 4: Power Quality Monitoring
Two Round Tables will be organised:
- Power quality and EMC in the Future Grid (CIGRE/CIRED WG C4.24, RT 13)
- Reliability Benchmarking - why we should do it? What should be done in future? (RT 15
Restoration of an active MV distribution grid with a battery ESS: A real case study
In order to improve power system operation, Battery Energy Storage Systems (BESSs) have been installed in high voltage/medium voltage stations by Distribution System Operators (DSOs) around the world. Support for restoration of MV distribution networks after a blackout or HV interruption is among the possible new functionalities of BESSs. With the aim to improve quality of service, the present paper investigates whether a BESS, installed in the HV/MV substation, can improve the restoration process indicators of a distribution grid. As a case study, an actual active distribution network of e-distribuzione, the main Italian DSO, has been explored. The existing network is located in central Italy. It supplies two municipalities of approximately 10,000 inhabitants and includes renewable generation plants. Several configurations are considered, based on: the state of the grid at blackout time; the BESS state of charge; and the involvement of Dispersed Generation (DG) in the restoration process. Three restoration plans (RPs) have been defined, involving the BESS alone, or in coordination with DG. A MATLABÂź/SimulinkÂź program has been designed to simulate the restoration process in each configuration and restoration plan. The results show that the BESS improves restoration process quality indicators in different simulated configurations, allowing the operation in controlled island mode of parts of distribution grids, during interruptions or blackout conditions. The defined restoration plans set the priority and the sequence of controlled island operations of parts of the grid to ensure a safe and better restoration. In conclusion, the results demonstrate that a BESS can be a valuable element towards an improved restoration procedure
Distributed photovoltaic systems: Utility interface issues and their present status. Intermediate/three-phase systems
The interface issues between the intermediate-size Power Conditioning Subsystem (PCS) and the utility are considered. A literature review yielded facts about the status of identified issues
- âŠ