67 research outputs found

    A two-level facility location and sizing problem for maximal coverage

    Get PDF
    This paper presents a two-stage hierarchical location problem for systems where the lower level facilities act as the first points contact for the customers while the upper level facilities act as suppliers of the lower level facilities that either serve them or provide advanced services to customers. Furthermore, more recent and realistic coverage constructs such as gradual and cooperative covering are included in our setting. Although our problem can be applicable in various settings, the most fitting application is in wireless telecommunication networks to determine the location of base stations and mobile switching centers. We have developed two competing formulations for the problem, each of which involve nonlinear components that are difficult to deal with. We then develop their respective linearizations and tested their performances. These formulations are solved by commercial optimizers for a set of reasonably large problem instances and it is found that majority of the problems can be solved within a maximum of 10% optimality gap within a short time

    Fiber optical network design problems : case for Turkey

    Get PDF
    Ankara : The Department of Industrial Engineering and the Graduate School of Engineering and Science of Bilkent University, 2013.Thesis (Master's) -- Bilkent University, 2013.Includes bibliographical references leaves 102-110.The problems within scope of this thesis are based on an application arising from one of the largest Internet service providers operating in Turkey. There are mainly two different problems: the green field design and copper field re-design. In the green field design problem, the aim is to design a least cost fiber optical network from scratch that will provide high bandwidth Internet access from a given central station to a set of aggregated demand nodes. Such an access can be provided either directly by installing fibers or indirectly by utilizing passive splitters. Insertion loss, bandwidth level and distance limitations should simultaneously be considered in order to provide a least cost design to enable the required service level. On the other hand, in the re-design of the copper field application, the aim is to improve the current service level by augmenting the network through fiber optical wires. Copper rings in the existing infrastructure are augmented with cabinets and direct fiber links from cabinets to demand nodes provide the required coverage to distant nodes. Mathematical models are constructed for both problem specifications. Extensive computational results based on real data from Kartal (45 points) and Bakırköy (74 points) districts in Istanbul show that the proposed models are viable exact solution methodologies for moderate dimensions.Yazar, BaşakM.S

    Locating and Protecting Facilities Subject to Random Disruptions and Attacks

    Get PDF
    Recent events such as the 2011 Tohoku earthquake and tsunami in Japan have revealed the vulnerability of networks such as supply chains to disruptive events. In particular, it has become apparent that the failure of a few elements of an infrastructure system can cause a system-wide disruption. Thus, it is important to learn more about which elements of infrastructure systems are most critical and how to protect an infrastructure system from the effects of a disruption. This dissertation seeks to enhance the understanding of how to design and protect networked infrastructure systems from disruptions by developing new mathematical models and solution techniques and using them to help decision-makers by discovering new decision-making insights. Several gaps exist in the body of knowledge concerning how to design and protect networks that are subject to disruptions. First, there is a lack of insights on how to make equitable decisions related to designing networks subject to disruptions. This is important in public-sector decision-making where it is important to generate solutions that are equitable across multiple stakeholders. Second, there is a lack of models that integrate system design and system protection decisions. These models are needed so that we can understand the benefit of integrating design and protection decisions. Finally, most of the literature makes several key assumptions: 1) protection of infrastructure elements is perfect, 2) an element is either fully protected or fully unprotected, and 3) after a disruption facilities are either completely operational or completely failed. While these may be reasonable assumptions in some contexts, there may exist contexts in which these assumptions are limiting. There are several difficulties with filling these gaps in the literature. This dissertation describes the discovery of mathematical formulations needed to fill these gaps as well as the identification of appropriate solution strategies

    Algoritmos evolutivos para alguns problemas em telecomunicações

    Get PDF
    Orientadores: Flavio Keidi Miyazawa, Mauricio Guilherme de Carvalho ResendeTese (doutorado) - Universidade Estadual de Campinas, Instituto de ComputaçãoResumo: Nos últimos anos, as redes de telecomunicação tem experienciado um grande aumento no fluxo de dados. Desde a utilização massiva de vídeo sob demanda até o incontável número de dispositivos móveis trocando texto e vídeo, o tráfego alcançou uma escala capaz de superar a capacidade das redes atuais. Portanto, as companhias de telecomunicação ao redor do mundo tem sido forçadas a aumentar a capacidade de suas redes para servir esta crescente demanda. Como o custo de instalar uma infraestrutura de rede é geralmente muito grande, o projeto de redes usa fortemente ferramentas de otimização para manter os custos tão baixos quanto possível. Nesta tese, nós analisamos vários aspectos do projeto e implementação de redes de telecomunicação. Primeiramente, nós apresentamos um novo problema de projeto de redes usado para servir demandas sem fio de dispositivos móveis e rotear tal tráfego para a rede principal. Tais redes de acesso são baseadas em tecnologias sem fio modernos como Wi-Fi, LTE e HSPA. Este problema consideramos várias restrições reais e é difícil de ser resolvido. Nós estudamos casos reais nas vizinhanças de uma grande cidade nos Estados Unidos. Em seguida, nós apresentamos uma variação do problema de localização de hubs usado para modelar as redes principais (backbones ou laços centrais). Este problema também pode ser utilizado para modelar redes de transporte de cargas e passageiros. Nós também estudamos o problema de clusterização correlacionada com sobreposições usado para modelar o comportamento dos usuários quando utilizam seus equipamentos móveis. Neste problema, nós podemos rotular um objeto usando múltiplos rótulos e analisar a conexão entre eles. Este problema é adequado para análise de mobilidade de equipamentos que pode ser usada para estimar o tráfego em uma dada região. E finalmente, nós analisamos o licenciamento de espectro sobre uma perspectiva governamental. Nestes casos, uma agência do governo deseja vender licenças para companhias de telecomunicação para que operem em uma dada faixa de espectro. Este processo usualmente é conduzido usando leilões combinatoriais. Para todos problemas, nós propomos algoritmos genéticos de chaves aleatórias viciadas e modelos de programação linear inteira mista para resolvê-los (exceto para o problema de clusterização correlacionada com sobreposição, devido sua natureza não-linear). Os algoritmos que propusemos foram capazes de superar algoritmos do estado da arte para todos problemasAbstract: Cutting and packing problems are common problems that occur in many industry and business process. Their optimized resolution leads to great profits in several sectors. A common problem, that occur in textil and paper industries, is to cut a strip of some material to obtain several small items, using the minimum length of material. This problem, known by Two Dimensional Strip Packing Problem (2SP), is a hard combinatorial optimization problem. In this work, we present an exact algorithm to 2SP, restricted to two staged cuts (known by Two Dimensional Level Strip Packing, 2LSP). The algorithm uses the branch-and-price technique, and heuristics based on approximation algorithms to obtain upper bounds. The algorithm obtained optimal or almost optimal for small and moderate sized instancesAbstract: In last twenty years, telecommunication networks have experienced a huge increase in data utilization. From massive on-demand video to uncountable mobile devices exchanging text and video, traffic reached scales that overcame the network capacities. Therefore, telecommunication companies around the world have been forced to increase their capacity to serve this increasing demand. As the cost to deploy network infrastructure is usually very large, the design of a network heavily uses optimization tools to keep costs as low as possible. In this thesis, we analyze several aspects of the design and deployment of communication networks. First, we present a new network design problem used to serve wireless demands from mobile devices and route the traffic to the core network. Such access networks are based on modern wireless access technologies such as Wi-Fi, LTE, and HSPA. This problem has several real world constraints and it is hard to solve. We study real cases of the vicinity of a large city in the United States. Following, we present a variation of the hub-location problem used to model these core networks. Such problem is also suitable to model transportation networks. We also study the overlapping correlation clustering problem used to model the user's behavior when using their mobile devices. In such problem, one can label an object with multiple labels and analyzes the connections between them. Although this problem is very generic, it is suitable to analyze device mobility which can be used to estimate traffic in geographical regions. Finally, we analyze spectrum licensing from a governmental perspective. In these cases, a governmental agency wants to sell rights for telecommunication companies to operate over a given spectrum range. This process usually is conducted using combinatorial auctions. For all problems we propose biased random-key genetic algorithms and mixed integer linear programming models (except in the case of the overlapping correlation clustering problem due its non-linear nature). Our algorithms were able to overcome the state of the art algorithms for all problemsDoutoradoCiência da ComputaçãoDoutor em Ciência da Computaçã

    Hub Network Design and Discrete Location: Economies of Scale, Reliability and Service Level Considerations

    Get PDF
    In this thesis, we study three related decision problems in location theory. The first part of the dissertation presents solution algorithms for the cycle hub location problem (CHLP), which seeks to locate p-hub facilities that are connected by means of a cycle, and to assign non-hub nodes to hubs so as to minimize the total cost of routing flows through the network. This problem is useful in modeling applications in transportation and telecommunications systems, where large setup costs on the links and reliability requirements make cycle topologies a prominent network architecture. We present a branch and-cut algorithm that uses a flow-based formulation and two families of mixed-dicut inequalities as a lower bounding procedure at nodes of the enumeration tree. We also introduce a greedy randomized adaptive search algorithm that is used to obtain initial upper bounds for the exact algorithm and to obtain feasible solutions for large-scale instances of the CHLP. Numerical results on a set of benchmark instances with up to 100 nodes confirm the efficiency of the proposed solution algorithms. In the second part of this dissertation, we study the modular hub location problem, which explicitly models the flow-dependent transportation costs using modular arc costs. It neither assumes a full interconnection between hub nodes nor a particular topological structure, instead it considers link activation decisions as part of the design. We propose a branch-and-bound algorithm that uses a Lagrangean relaxation to obtain lower and upper bounds at the nodes of the enumeration tree. Numerical results are reported for benchmark instances with up to 75 nodes. In the last part of this dissertation we study the dynamic facility location problem with service level constraints (DFLPSL). The DFLPSL seeks to locate a set of facilities with sufficient capacities over a planning horizon to serve customers at minimum cost while a service level requirement is met. This problem captures two important sources of stochasticity in facility location by considering known probability distribution functions associated with processing and routing times. We present a nonlinear mixed integer programming formulation and provide feasible solutions using two heuristic approaches. We present the results of computational experiments to analyze the impact and potential benefits of explicitly considering service level constraints when designing distribution systems

    The perspective of stakeholders regarding access to ICT in rural communities of uMgungundlovu District Municipality.

    Get PDF
    Masters Degree. University of KwaZulu-Natal, Pietermaritzburg.Understanding stakeholders’ perspectives regarding access to information and communication technology (ICT) is a critical aspect of ICT for Development (ICT4D). The rural communities of uMgungundlovu District Municipality in KwaZulu-Natal in South Africa were studied to investigate the current means of accessing information using ICT; the factors that affect access to ICT in the rural communities; the literacy level and technological skills of local communities and the stakeholders. The challenges that have the potential to undermine the implementation of ICTs were also identified. The study used a sequential mixed methods design that entailed the collection of qualitative data subsequent to the quantitative data collection to address the research questions. A non-proportional stratified sampling technique to collect data from 61 stakeholders was utilised. Self-administered questionnaires were used to collect quantitative data from 26 councillors, 5 municipal managers, 5 corporate services mangers, and 5 ICT managers, while semi-structured interviews were used to collect qualitative data from 20 ward committee members. The quantitative data was analysed using SPSS statistical software and the qualitative data was analysed with thematic content analysis. The findings of the study from the rural stakeholders’ perspectives revealed that radio was used the most to access information followed by word-of-mouth, cellular phone, newspaper, community gatherings, while TV, letter writing and internet had the lowest usage. On the other hand municipal managers recognise the need for ICT for the economic advancement of the region, which requires the adoption of suitable ICT policies and their annual review. Furthermore municipal managers understood that current information on the municipality website and access to the municipality website were important. Almost all of the Ward committee members had knowledge of Community based digital hubs and all of them wanted the Community based digital hub (CBDH) to be established in their communities. The perspective of the committee Ward members on the technological and computer literacy levels of their respective communities shows an even distribution between the community members with knowledge of CBDH and those without. The communities are not trained to use communication tools but their perception on youth training with respect to the use of communication tools were significantly different, since some of the youths have undergone some level of computer training on account of the schools they attended. The greatest challenge to the establishment of community-based digital hubs (CBDH) was lack of availability of land, followed by lack of electricity, shortage of skilled people to manage the CBDH, maintenance of the structure, difficulty of permission to build the CBDH and comunal land conflicts. Recommendations based on the findings of the study are presented, while further research should focus on the factors and challenges that influence access to ICT in rural communities in South Africa from the perspectives of rural community members

    Efficient Algorithms for Infrastructure Networks: Planning Issues and Economic Impact

    Get PDF
    Mei, R.D. van der [Promotor]Bhulai, S. [Copromotor

    On the design of a cost-efficient resource management framework for low latency applications

    Get PDF
    The ability to offer low latency communications is one of the critical design requirements for the upcoming 5G era. The current practice for achieving low latency is to overprovision network resources (e.g., bandwidth and computing resources). However, this approach is not cost-efficient, and cannot be applied in large-scale. To solve this, more cost-efficient resource management is required to dynamically and efficiently exploit network resources to guarantee low latencies. The advent of network virtualization provides novel opportunities in achieving cost-efficient low latency communications. It decouples network resources from physical machines through virtualization, and groups resources in the form of virtual machines (VMs). By doing so, network resources can be flexibly increased at any network locations through VM auto-scaling to alleviate network delays due to lack of resources. At the same time, the operational cost can be largely reduced by shutting down low-utilized VMs (e.g., energy saving). Also, network virtualization enables the emerging concept of mobile edge-computing, whereby VMs can be utilized to host low latency applications at the network edge to shorten communication latency. Despite these advantages provided by virtualization, a key challenge is the optimal resource management of different physical and virtual resources for low latency communications. This thesis addresses the challenge by deploying a novel cost-efficient resource management framework that aims to solve the cost-efficient design of 1) low latency communication infrastructures; 2) dynamic resource management for low latency applications; and 3) fault-tolerant resource management. Compared to the current practices, the proposed framework achieves 80% of deployment cost reduction for the design of low latency communication infrastructures; continuously saves up to 33% of operational cost through dynamic resource management while always achieving low latencies; and succeeds in providing fault tolerance to low latency communications with a guaranteed operational cost
    corecore