24,619 research outputs found

    The safety case and the lessons learned for the reliability and maintainability case

    Get PDF
    This paper examine the safety case and the lessons learned for the reliability and maintainability case

    Development of Neurofuzzy Architectures for Electricity Price Forecasting

    Get PDF
    In 20th century, many countries have liberalized their electricity market. This power markets liberalization has directed generation companies as well as wholesale buyers to undertake a greater intense risk exposure compared to the old centralized framework. In this framework, electricity price prediction has become crucial for any market player in their decision‐making process as well as strategic planning. In this study, a prototype asymmetric‐based neuro‐fuzzy network (AGFINN) architecture has been implemented for short‐term electricity prices forecasting for ISO New England market. AGFINN framework has been designed through two different defuzzification schemes. Fuzzy clustering has been explored as an initial step for defining the fuzzy rules while an asymmetric Gaussian membership function has been utilized in the fuzzification part of the model. Results related to the minimum and maximum electricity prices for ISO New England, emphasize the superiority of the proposed model over well‐established learning‐based models

    Expert Elicitation for Reliable System Design

    Full text link
    This paper reviews the role of expert judgement to support reliability assessments within the systems engineering design process. Generic design processes are described to give the context and a discussion is given about the nature of the reliability assessments required in the different systems engineering phases. It is argued that, as far as meeting reliability requirements is concerned, the whole design process is more akin to a statistical control process than to a straightforward statistical problem of assessing an unknown distribution. This leads to features of the expert judgement problem in the design context which are substantially different from those seen, for example, in risk assessment. In particular, the role of experts in problem structuring and in developing failure mitigation options is much more prominent, and there is a need to take into account the reliability potential for future mitigation measures downstream in the system life cycle. An overview is given of the stakeholders typically involved in large scale systems engineering design projects, and this is used to argue the need for methods that expose potential judgemental biases in order to generate analyses that can be said to provide rational consensus about uncertainties. Finally, a number of key points are developed with the aim of moving toward a framework that provides a holistic method for tracking reliability assessment through the design process.Comment: This paper commented in: [arXiv:0708.0285], [arXiv:0708.0287], [arXiv:0708.0288]. Rejoinder in [arXiv:0708.0293]. Published at http://dx.doi.org/10.1214/088342306000000510 in the Statistical Science (http://www.imstat.org/sts/) by the Institute of Mathematical Statistics (http://www.imstat.org

    Decision support systems for large dam planning and operation in Africa

    Get PDF
    Decision support systems/ Dams/ Planning/ Operations/ Social impact/ Environmental effects

    How Overconfident are Current Projections of Anthropogenic Carbon Dioxide Emissions?

    Get PDF
    Analyzing the risks of anthropogenic climate change requires sound probabilistic projections of CO2 emissions. Previous projections have broken important new ground, but many rely on out-of-range projections, are limited to the 21st century, or provide only implicit probabilistic information. Here we take a step towards resolving these problems by assimilating globally aggregated observations of population size, economic output, and CO2 emissions over the last three centuries into a simple economic model. We use this model to derive probabilistic projections of business-as-usual CO2 emissions to the year 2150. We demonstrate how the common practice to limit the calibration timescale to decades can result in biased and overconfident projections. The range of several CO2 emission scenarios (e.g., from the Special Report on Emission Scenarios) misses potentially important tails of our projected probability density function. Studies that have interpreted the range of CO2 emission scenarios as an approximation for the full forcing uncertainty may well be biased towards overconfident climate change projections.Carbon Dioxide, Emissions, Scenarios, Data Assimilation, Markov Chain Monte Carlo

    Research on ship pilotage risk management and decision making in Guangzhou Port

    Get PDF

    Needs and challenges for assessing the environmental impacts of engineered nanomaterials (ENMs).

    Get PDF
    The potential environmental impact of nanomaterials is a critical concern and the ability to assess these potential impacts is top priority for the progress of sustainable nanotechnology. Risk assessment tools are needed to enable decision makers to rapidly assess the potential risks that may be imposed by engineered nanomaterials (ENMs), particularly when confronted by the reality of limited hazard or exposure data. In this review, we examine a range of available risk assessment frameworks considering the contexts in which different stakeholders may need to assess the potential environmental impacts of ENMs. Assessment frameworks and tools that are suitable for the different decision analysis scenarios are then identified. In addition, we identify the gaps that currently exist between the needs of decision makers, for a range of decision scenarios, and the abilities of present frameworks and tools to meet those needs

    Assessing and augmenting SCADA cyber security: a survey of techniques

    Get PDF
    SCADA systems monitor and control critical infrastructures of national importance such as power generation and distribution, water supply, transportation networks, and manufacturing facilities. The pervasiveness, miniaturisations and declining costs of internet connectivity have transformed these systems from strictly isolated to highly interconnected networks. The connectivity provides immense benefits such as reliability, scalability and remote connectivity, but at the same time exposes an otherwise isolated and secure system, to global cyber security threats. This inevitable transformation to highly connected systems thus necessitates effective security safeguards to be in place as any compromise or downtime of SCADA systems can have severe economic, safety and security ramifications. One way to ensure vital asset protection is to adopt a viewpoint similar to an attacker to determine weaknesses and loopholes in defences. Such mind sets help to identify and fix potential breaches before their exploitation. This paper surveys tools and techniques to uncover SCADA system vulnerabilities. A comprehensive review of the selected approaches is provided along with their applicability
    • 

    corecore