138 research outputs found

    Reservation-Based Federated Scheduling for Parallel Real-Time Tasks

    Full text link
    This paper considers the scheduling of parallel real-time tasks with arbitrary-deadlines. Each job of a parallel task is described as a directed acyclic graph (DAG). In contrast to prior work in this area, where decomposition-based scheduling algorithms are proposed based on the DAG-structure and inter-task interference is analyzed as self-suspending behavior, this paper generalizes the federated scheduling approach. We propose a reservation-based algorithm, called reservation-based federated scheduling, that dominates federated scheduling. We provide general constraints for the design of such systems and prove that reservation-based federated scheduling has a constant speedup factor with respect to any optimal DAG task scheduler. Furthermore, the presented algorithm can be used in conjunction with any scheduler and scheduling analysis suitable for ordinary arbitrary-deadline sporadic task sets, i.e., without parallelism

    On the Pitfalls of Resource Augmentation Factors and Utilization Bounds in Real-Time Scheduling

    Get PDF
    In this paper, we take a careful look at speedup factors, utilization bounds, and capacity augmentation bounds. These three metrics have been widely adopted in real-time scheduling research as the de facto standard theoretical tools for assessing scheduling algorithms and schedulability tests. Despite that, it is not always clear how researchers and designers should interpret or use these metrics. In studying this area, we found a number of surprising results, and related to them, ways in which the metrics may be misinterpreted or misunderstood. In this paper, we provide a perspective on the use of these metrics, guiding researchers on their meaning and interpretation, and helping to avoid pitfalls in their use. Finally, we propose and demonstrate the use of parametric augmentation functions as a means of providing nuanced information that may be more relevant in practical settings

    Exact Speedup Factors and Sub-Optimality for Non-Preemptive Scheduling

    Get PDF
    Fixed priority scheduling is used in many real-time systems; however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive earliest deadline first (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP). As this lower bound matches a recently published upper bound for the same quantity, it closes the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, in other words, there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive the exact speed-up factor required to guarantee FP-P feasibility of any constrained-deadline FP-NP feasible task set

    A Survey of Research into Mixed Criticality Systems

    Get PDF
    This survey covers research into mixed criticality systems that has been published since Vestal’s seminal paper in 2007, up until the end of 2016. The survey is organised along the lines of the major research areas within this topic. These include single processor analysis (including fixed priority and EDF scheduling, shared resources and static and synchronous scheduling), multiprocessor analysis, realistic models, and systems issues. The survey also explores the relationship between research into mixed criticality systems and other topics such as hard and soft time constraints, fault tolerant scheduling, hierarchical scheduling, cyber physical systems, probabilistic real-time systems, and industrial safety standards

    Quantifying the Exact Sub-optimality of Non-preemptive Scheduling

    Full text link

    Resource-Efficient Scheduling Of Multiprocessor Mixed-Criticality Real-Time Systems

    Get PDF
    Timing guarantee is critical to ensure the correctness of embedded software systems that interact with the physical environment. As modern embedded real-time systems evolves, they face three challenges: resource constraints, mixed-criticality, and multiprocessors. This dissertation focuses on resource-efficient scheduling techniques for mixed-criticality systems on multiprocessor platforms. While Mixed-Criticality (MC) scheduling has been extensively studied on uniprocessor plat- forms, the problem on multiprocessor platforms has been largely open. Multiprocessor al- gorithms are broadly classified into two categories: global and partitioned. Global schedul- ing approaches use a global run-queue and migrate tasks among processors for improved schedulability. Partitioned scheduling approaches use per processor run-queues and can reduce preemption/migration overheads in real implementation. Existing global scheduling schemes for MC systems have suffered from low schedulability. Our goal in the first work is to improve the schedulability of MC scheduling algorithms. Inspired by the fluid scheduling model in a regular (non-MC) domain, we have developed the MC-Fluid scheduling algo- rithm that executes a task with criticality-dependent rates. We have evaluated MC-Fluid in terms of the processor speedup factor: MC-Fluid is a multiprocessor MC scheduling algo- rithm with a speed factor of 4/3, which is known to be optimal. In other words, MC-Fluid can schedule any feasible mixed-criticality task system if each processor is sped up by a factor of 4/3. Although MC-Fluid is speedup-optimal, it is not directly implementable on multiprocessor platforms of real processors due to the fractional processor assumption where multiple task can be executed on one processor at the same time. In the second work, we have considered the characteristic of a real processor (executing only one task at a time) and have developed the MC-Discrete scheduling algorithm for regular (non-fluid) scheduling platforms. We have shown that MC-Discrete is also speedup-optimal. While our previous two works consider global scheduling approaches, our last work con- siders partitioned scheduling approaches, which are widely used in practice because of low implementation overheads. In addition to partitioned scheduling, the work consid- ers the limitation of conventional MC scheduling algorithms that drops all low-criticality tasks when violating a certain threshold of actual execution times. In practice, the system designer wants to execute the tasks as much as possible. To address the issue, we have de- veloped the MC-ADAPT scheduling framework under uniprocessor platforms to drop as few low-criticality tasks as possible. Extending the framework with partitioned multiprocessor platforms, we further reduce the dropping of low-criticality tasks by allowing migration of low-criticality tasks at the moment of a criticality switch. We have evaluated the quality of task dropping solution in terms of speedup factor. In existing work, the speedup factor has been used to evaluate MC scheduling algorithms in terms of schedulability under the worst-case scheduling scenario. In this work, we apply the speedup factor to evaluate MC scheduling algorithms in terms of the quality of their task dropping solution under various MC scheduling scenarios. We have derived that MC-ADAPT has a speedup factor of 1.618 for task dropping solution
    • …
    corecore