74 research outputs found

    The Analysis of Channel Type Combination Alternative of “Klambu-Kudu” Raw Water Channel

    Get PDF
    “Klambu Kudu” raw water channel is a 40.558 km channel which conveys raw water from Klambu Weir to Kudu Water treatment plant (WTP). The water flow measured in the Intake at Klambu Weir and at Kudu WTP has some discrepancies to the planned. This discrepancies are partly caused by use of different types of channel on various locale conditions. This research describes the selection to the policy maker in deciding which raw water channel type suitable for each area by using Decision Making Supporting System (DSS) with an approach of Analytic Hiearchy Process (AHP) Method. It integrating the criteria of construction cost, operation and maintenance cost, the ease of operation and maintenace implementation as well as benefit/profit

    Analisis Penanganan Longsoran Pada Bangunan Pelimpah Bendungan Ciawi

    Get PDF
    The shallow landslide on the left slope of the Ciawi Dam spillway occurred in June 2020. The landslide occurred gradually and disrupted the progress of the dam construction. Therefore, this study aims to analyze the stability of the slope and determine the safe number of the slope then providing recommendations for proper handling. The method used in this study is the limit equilibrium method with the SLOPE/W geostudio program which is run in two methods of determining safety factor, Bishop and Fellenius/Ordinary. Based on the results of the stability analysis, the safety factor is 0.915 for Bishop method and 0.852 for Ordinary method. The first attempt at handling the slopes was to reduce the slope, but this effort did not provide a significant increase in the number of safety factor. The next handling is to use the reinforcement of 3 borepiles with a depth of 35 m, 40 m, and 45 m with a distance between the piles of 40 mm with a shear strength of 150 kN. This effort provides a safety factor number of 1.754 Bishop's method and 1.546 Ordinary’s method with the result that it meets the safety requirements of slope reinforcement.The shallow landslide on the left slope of the Ciawi Dam spillway occurred in June 2020. The landslide occurred gradually and disrupted the progress of the dam construction. Therefore, this study aims to analyze the stability of the slope and determine the safe number of the slope then providing recommendations for proper handling. The method used in this study is the limit equilibrium method with the SLOPE/W geostudio program which is run in two methods of determining safety factor, Bishop and Fellenius/Ordinary. Based on the results of the stability analysis, the safety factor is 0.915 for Bishop method and 0.852 for Ordinary method. The first attempt at handling the slopes was to reduce the slope, but this effort did not provide a significant increase in the number of safety factor. The next handling is to use the reinforcement of 3 borepiles with a depth of 35 m, 40 m, and 45 m with a distance between the piles of 40 mm with a shear strength of 150 kN. This effort provides a safety factor number of 1.754 Bishop's method and 1.546 Ordinary’s method with the result that it meets the safety requirements of slope reinforcement

    POLDER SEMARANG TIMUR

    Get PDF
    Saat ini wilayah Semarang Timur sistem drainasenya sangat dipengaruhi oleh adanya air laut pasang. Hal ini menyebabkan kerugian sosial dan ekonomi akibat genangan rob yang menggenangi wilayah pantai utara Jawa Tengah, oleh karena itu perlu kajian untuk mengatasi masalah banjir dan rob yang ada. Penanggulangan air laut pasang yang masuk daratan (yang disebut rob) dilakukan dengan membangun tanggul yang menghubungkan tanggul kanan Kanal Banjir Barat dengan tanggul kiri Kali Babon. Untuk membuang air banjir dari Kali Tenggang dan Kali Sringin diperlukan pompa dengan kolam detensi agar kapasitas pompa dapat dapat diminimalkan. Permasalahan sosial yang mungkin timbul adalah merubah penggunaan lahan dari tambak menjadi lahan kering, atau merubah tambak air payau menjadi tambak air tawar. Penyusunan Basic Design ini dimaksudkan untuk mendapatkan teknik pengendalian banjir dan rob untuk disampaikan pada pemerintah dalam hal ini adalah Balai Besar Wilayah Sungai (BBWS) Pemali Juana. Sistem pengendalian banjir dan rob yang sesuai adalah sistem polder, dengan komponen infrastrukturnya adalah: tanggul laut yang dimanfaatkan sebagai proteksi terhadap masuknya air pasang (rob) kearah daratan DAS Kali Tenggang dan DAS Kali Sringin. Pengeluaran air hujan yang turun di DAS tersebut menggunakan pompa dan kolam detensi

    EVALUASI UMUR LAYANAN WADUK SANGGEH

    Get PDF
    Waduk Sanggeh merupakan salah satu wujud usaha pengelolaan Sumber Daya Air yang berlokasi di desa Tambirejo, Kecamatan Toroh, Kabupaten Grobogan. Waduk Sanggeh dibangun antara tahun 1909-1911, dengan luas genangan waduk Sanggeh 13 ha dibangun dengan tujuan untuk mengairi sawah seluas 46 ha. Salah satu persoalan utama yang terjadi di dalam operasional Waduk Sanggeh adalah terjadinya sedimentasi yang berakibat pada pengurangan kapasitas waduk sehingga berdampak terhadap umur layanan waduk yang sudah direncanakan. Maka perlu dilakukan penelitian untuk memperkirakan umur layanan waduk berdasarkan laju sedimentasi Waduk Sanggeh pada kondisi saat ini. Analisis erosi dan sedimentasi diperlukan guna menentukan sisa umur waduk. Prediksi laju erosi dilakukan dengan analisis USLE untuk menghasilkan tingkat erosi lahan. Analisis Sediment Delivery Ratio (SDR) menghasilkan laju sedimen yang masuk ke Waduk Sanggeh. Volume sedimen yang mengendap di dalam waduk dapat diprediksi dengan cara mencari besarnya trap efficiency. Prediksi sisa umur layanan waduk dapat dikomparasi dari hasil perhitungan secara empiris dengan hasil pengukuran bathimetri. Sesuai dengan tujuan penelitian, hasil penelitian ini dapat memprediksi tingkat sedimentasi, dan memprediksi sisa umur layanan waduk selama 9 tahun, sesuai dengan maksud dan tujuan penelitian. Diharapkan hasil penelitian ini dapat digunakan untuk menyusun pedoman operasi dan konservasi lahan DTA waduk, terutama Waduk Sanggeh

    REKAYASA PERLINTASAN SUNGAI BRINGIN DAN JALAN TOL SEMARANG-BATANG

    Get PDF
    Trase jalan tol Semarang-Batang pada Sta 444+881 melintasi Sungai Bringin yang beralur meander sepanjang 667,45 m. Untuk melintasi Sungai Beringin, ada 3(tiga) alternatif perlintasan jalan tol yang diusulkan dalam studi ini. Alternatif perlintasan ke I adalah menggunakan jalan layang, ke II pemindahan alur sungai, dan yang ke III adalah kombinasi antara jembatan layang dan pembangunan embung. Sungai Bringin adalah sungai yang dapat dikategorikan sebagai sungai yang garang, karena itu masing-masing alternatif tersebut perlu dikaji pengaruhnya pada morfologi sungai, dan lingkungan daerah hilirnya. Analisis yang dilakukan dalam studi ini antara lain analisis hidrologi untuk memprediksi debit banjir, analisis hidrolika untuk melihat pengaruh aliran banjir dan analisis multi kriteria untuk memilih alternatif yang terbaik berdasarkan beberapa kriteria. Analisis hidrologi menggunakan HEC-HMS untuk menganalisis volume kolam embung, lebar bangunan pelimpah, tinggi muka air banjir dan elevasi puncak bendungan. Analisis hidrolika dilakukan dengan HEC-RAS untuk mengkaji tinggi muka air dan kecepatan aliran. Pemilihan alternatif dalam pengambilan keputusan dilakukan dengan kajian analisis multikriteria “Weighted Average” yang paling sederhana agar analisisnya mudah diikuti oleh pihak-pihak yang berwenang mengambil keputusan. Penelitian ini bermanfaat untuk menentukan alternatif yang terbaik berdasarkan aspek hidrologi, hidrolika, morfologi sungai, waktu dan biaya pelaksanaan

    Effects of Disaster Management Programs on Individuals' Preparedness in Mount Merapi

    Get PDF
    Disaster management to mitigate or avoid impacts of hazards by reducing vulnerability has been conducted in Mount Merapi since 1969. Vulnerability introduced since 1980s has two main characteristics, such as physical vulnerability (i.e., impacts of hazards) and social vulnerability (i.e., composite characteristics including social, economic and environmental factors). As regulations in Indonesia, i.e. Law of Republic Indonesia No. 24 Year 2007, emphasizes the community involvement in disaster management, individuals or groups of individuals have significant roles in reducing social vulnerability. To promote the community involvement effectively in disaster management, this research hypothesized nine relationships between disaster management programs to assess effects of disaster management programs on the community involvement, such as individuals’ preparedness. Since disaster management programs are not measurable quantitatively, variance-based partial least squares structural equation modeling (PLS-SEM) was applied to test hypothesized causal relationships between the programs. As a result, all nine hypotheses were substantiated. The model revealed that individuals’ preparedness is significantly influenced by emergency logistics and financial aid through self-efficacy, and contingency plans affect reconstruction significantly and successively reconstruction affects rehabilitation

    Reservoir Operation to Minimize Sedimentation

    Full text link
    The Wonogiri Reservoir capacity decreases rapidly, caused by serious sedimentation problems. In 2007, JICA was proposed a sediment storage reservoir with a new spillway for the purpose of sediment flushing / sluicing from The Keduang River. Due to the change of reservoir storage and change of reservoir system, it requires a sustainable reservoir operation technique. This technique is aimed to minimize the deviation between the input and output of sediments. The main objective of this study is to explore the optimal Wonogiri reservoir operation by minimizing the sediment trap. The CSUDP incremental dynamic programming procedure is used for the model optimization. This new operating rules will also simulate a five years operation period, to show the effect of the implemented techniques. The result of the study are the newly developed reservoir operation system has many advantages when compared to the actual operation system and the disadvantage of this developed system is that the use is mainly designed for a wet hydrologic year, since its performance for the water supply is lower than the actual reservoir operations.Doi: 10.12777/ijse.6.1.16-23 [How to cite this article: Wulandari, D.A., Legono, D., and Darsono, S., 2014. Reservoir Operation to Minimize Sedimentation. International Journal of Science and Engineering, 5(2),61-65. Doi: 10.12777/ijse.6.1.16-23

    Transmisi Gelombang pada Pemecah Gelombang Ambang Rendah Ganda

    Get PDF
    Coastal protection efforts can be done in various ways, among others, by making alow threshold breakwaters (sumerged breakwater). Every building in addition there is certainly no shortage of excess. With several weaknesses breakwater low threshold, then conducted research with the title “Wave Transmission At Low Threshold Dual-breaking waves". The study was conducted in the Hydraulic laboratory of the Faculty of Engineering, Tidar Magelang University, with variations of the model as follows: Model I : single low threshold breakwater piles of stones (PGARTTB) with peak width (B)=120 cm Model II : a low threshold double breakwater piles of stones (PGARGTB) formed by reducing material PGARTTB protective stone that is in the middle as much as 8.89%, 20%, 33.33%, and 46.67%. The results showed that: a) Reduction of material protection on the stone breakwater lowthreshold single pile of stones (PGARTTB) affect the magnitude of the wave transmission, b) reduced protective stone will increase the value of the wave transmission coefficient c) for each reduction of 1% a protective stone, waves of up 0.2788% transmission, d) the increase in transmission waves are caused by the reduced friction between the base and peak wave breakwaters low threshold

    Pengambilan Keputusan Pembangunan Bendungan Di Indonesia

    Get PDF
    Determination of dam construction for sure will be closely related to the dam constructing criteria. These criteria can be technical and non-technical. The selection of best location/types of dams requires a thorough consideration of the characteristics of each type, as it relates to the physical features of the location (geology) and the adaptation to the objectives of dam that it should serve, security, economy, and other related limitations. Proper dam construction is closely related to water resources management and depends on a set of qualitative and quantitative criteria. This is because: (1). Some criteria are unmeasurable/qualitatively complex; and (2). One criterion has a lot of information (eg geological criteria have complex information). Such problems can be solved by using the Multi-Criteria Decision-Making (MCDM) approach. MCDM is a sub-disciplinary research operation that explicitly evaluates several conflicting criteria in decision making. MCDM is expressed as a decision-making method to establish the best alternative of a number of alternatives based on certain criteria. Some of models included that popular in MCDM until today are: Scoring Model, Analytic Herarchy Process (AHP), Analytic Network Process (ANP), Utility Model, Out Ranking Method, Technique for Others Reference by Similarity to Ideal Solution (TOPSIS) and others. The MCDM application in relation to the analysis of priorities for dam construction has been widely developed. So it can be concluded that MCDM can be to determine the decision of dam constructing in general. Otherwise there are still some models in the MCDM family that have not been used so it needs to be done studies or related research. From the literature search results, there is no specific research to discuss ANP method for determining priority of dam construction, so this dissertation research will discuss in detail about ANP method for that purpose. The research is carried out by inventorying all the dam development criteria in the longlist, and together with the expert determining the criteria that have a strong influence on the determination of dam construction in Indonesia, and the finding is to develop an appropriate ANP method to determine the dam construction in Indonesia. This research determines 2 (two) main criteria for dam construction namely technical and non technical criteria. Technical criteria are the dominant criteria by having 5 (five) sub-criteria below: geology, topography, effectiveness of implementation, hydrology and environment. Nontechnical criteria have 2 (two) sub-criteria below: economic and social. Each sub-criterion has sub sub-criteria below until there are 27 sub sub-criteria. The most dominant sub-criteria are the geological sub-criteria, which affects up to 32.17%. And the lowest is the economic sub-criteria of 9.45%. The ANP method can be used as a method for prioritizing dams by involving experts as an assessment of the relationships of each criterion, sub-criteria, and sub-criteria. This research also raises a new path, among others, need to examine other criteria outside the observed object such as: politics, culture, or other technical criteria and need to develop model calibration methods and validation. Keywords: ANP, Dam, Decision making, MCDM, and Multy-criteria

    MINIMALISASI TIMBULAN SAMPAH DOMESTIK DI KECAMATAN SEMARANG TIMUR

    Get PDF
    Pengelolaan sampah merupakan permasalahan yang sering diabaikan pengelolaannya dibandingkan dengan kegiatan penangananan penataan kota yang lain. Kota Semarang sebagai ibukota Jawa Tengah yang terbagi dalam 11 wilayah kecamatan dengan jumlah penduduk sebesar 1.489.495 tahun 2012 dengan produksi sampah sekitar 4.500 m3/hari perlu segera dicarikan solusi pengelolaan sampahnya. Keterbatasan lahan TPA, kurangnya sarana dan prasarana juga dana sering menjadi alasan. Pola pengelolaan yang kurang serius akan berdampak timbulnya permasalahan di kemudian hari. Khusus di wilayah Kecamatan Semarang Timur yang mempunyai luas wilayah 7,70 Ha, dengan jumlah penduduk pada tahun 2010 sebesar 80.433 jiwa (BPPS,Profil Kota Semarang 2011,) tingkat kepadatan 10,415 jiwa/Km2. Wilayah ini sering mengalami banjir akibat luapan sungai Banger maka diadakan pembangunan polder dengan perlengkapan pompa penyedot kapasitas besar guna mengalihkan genangan air dalam polder ke laut/sungai. Masalah lain adalah besarnya timbunan sampah domestik yang cukup besar yaitu 236.016 m3/hari dengan tingkat pelayanan sampah sebesar 60,5 %. Kondisi prasarana dan biaya operasional menyebabkan penurunan kwalitas layanan sampah di wilayah ini. Untuk itu perlu perbaikan pengelolaan sampah yang berada di Tempat Penimbunan Sementara (TPS) harus segera dilakukan. Tujuannya agar timbunan sampah tidak mencemari/ mengotori aliran sungai akibat terbawa air banjir serta untuk mengurangi pencemaran lingkungan wilayah sekitar. Adapun cara menanggulangi pencemaran lingkungan akibat limbah domestik memerlukan penanganan khusus. Berbagai cara sudah dilakukan dan yang sudah dilaksanakan di wilayah ini salah satunya metode 3R (Reduce, Reuse dan recycle). Kenyataannya timbunan masih cukup banyak hampir di semua tempat pembuangan akhir (TPS) kelurahan. Cara 3R tersebut adalah dengan langkah memisahkan sampah jenis organik yang dapat diuraikan oleh mikro organisme (biodegradable) diolah menjadi kompos dan sampah yang tidak dapat diuraikan oleh mikroorganisme (non biodegradable) di daur ulang ataupun diolah menjadi barang bentuk lain yang memiliki nilai jual. Penelitian ini dilakukan untuk memberikan alternatip sistem pengelolaan sampah dengan teknik optimasi pengelolaan sampah terhadap residu akhir buangan. Caranya dengan mengolah sampah sisa yang tidak terkelola di TPS digiling menjadi serbuk (partikel kecil) untuk memperkecil fisik sampah. Selanjutnya kandungan udara dalam partikel sampah tersebut dihilangkan dengan cara memadatkan partikel sampah agar pengurangan volumenya lebih optimal. Dengan cara ini sampah sisa tidak memerlukan tempat yang luas baik saat ditimbun di TPS maupun saat diangkut ke TPA. Dari hasil analisa penelitian didapatkan beberapa parameter yang dapat dipakai sebagai dasar usulan optimasi pengelolaan sampah di wilayah ini antara lain : nilai koefisien korelasi prediktor analisa regresi, ( R2) =88,8 % untuk tingkat pertumbuhan penduduk dan (R2) = 88,7 % untuk tingkat pertumbuhan PDRB menunjukan hubungan yang sangat kuat terhadap timbulan sampah,hasil analisa regresi berganda dengan koefisien X1= pertumbuhan penduduk dan X2 = pertumbuhan PDRB diperoleh hasil nilai produk timbulan sampah Y = 3,8161 E+17 + 1,26231722.X1 – 1,11714E+15..X2 . Nilai koefisien pertumbuhan penduduk lebih berpengaruh terhadap timbulan sampah maka yang di optimasi untuk dibatasi adalah laju pertumbuhan penduduk setempat atau pemberdayaan masyarakat setempat untuk peduli kebersihan lingkungan sangat diutamakan. Pemadatan dengan cara ke 6 optimasi diperoleh pengurangan volume residu sampah hingga 88 % lebih yaitu dengan cara dipilah, dicacah dan dipadatkan dengan alat hidrolik (kompaktor). Nilai B/C kelayakan ekonomi = 1,05 artinya manfaat optimasi lebih besar dari nilai biaya langsung yang dikeluarkan, dipertimbangkan lebih menguntungkan. Hasil analisa penjualan sampah dipilah dengan optimasi didapat Rp.206.173.759,-/hari pada tahun 2011 artinya nilai penjualan per tahun dapat mencapai ± Rp.75.-miliar bisa untuk subsidi biaya Operasional & Pemeliharaan. Jika digunakan dasar analisa Rate Of return antara Benefits – Cost didapatkan hasil impas atau sama dengan nol (0) maka dengan dasar analisis ini teknik optimasi bisa dipertimbangkan juga
    • …
    corecore