1,617 research outputs found

    Turbulence characteristics of the B\"{o}dewadt layer in a large enclosed rotor-stator system

    Get PDF
    A three-dimensional (3D) direct numerical simulation is combined with a laboratory study to describe the turbulent flow in an enclosed annular rotor-stator cavity characterized by a large aspect ratio G=(b-a)/h=18.32 and a small radius ratio a/b=0.152, where a and b are the inner and outer radii of the rotating disk and h is the interdisk spacing. The rotation rate Omega under consideration is equivalent to the rotational Reynolds number Re=Omegab2/nu=9.5 x 104, where nu is the kinematic viscosity of the fluid. This corresponds to a value at which an experiment carried out at the laboratory has shown that the stator boundary layer is turbulent, whereas the rotor boundary layer is still laminar. Comparisons of the 3D computed solution with velocity measurements have given good agreement for the mean and turbulent fields. The results enhance evidence of weak turbulence at this Reynolds number, by comparing the turbulence properties with available data in the literature. An approximately self-similar boundary layer behavior is observed along the stator side. The reduction of the structural parameter a1 under the typical value 0.15 and the variation in the wall-normal direction of the different characteristic angles show that this boundary layer is three-dimensional. A quadrant analysis of conditionally averaged velocities is performed to identify the contributions of different events (ejections and sweeps) on the Reynolds shear stress producing vortical structures. The asymmetries observed in the conditionally averaged quadrant analysis are dominated by Reynolds stress-producing events in this B\"{o}dewadt layer. Moreover, case 1 vortices (with a positive wall induced velocity) are found to be the major source of generation of special strong events, in agreement with the conclusions of Lygren and Andersson.Comment: 16 page

    Effect of Condensed Tannins in Sainfoin on \u3cem\u3ein Vitro\u3c/em\u3e Protein Solubility of Lucerne

    Get PDF
    Proteins of fresh legume forages such as lucerne are highly degraded in the rumen, resulting in their inefficient use by the animal. The condensed tannins (CT) present in some forages can improve the nutritional value of these forages and of associated feeds in the diet. Previous in vitro work (Waghorn & Shelton, 1997) showed that CT from Lotus corniculatus are able to bind with and precipitate protein from a ryegrass/clover pasture, but when these forages were fed to sheep, the CT effects on digestion and animal performance were weak. This revealed a need for a better understanding of the mechanism of CT interaction between feeds. The present work was designed to measure, in vitro, the effects of CT in sainfoin when mixed with fresh lucerne

    The Interconnections of the LHC Cryomagnets

    Get PDF
    The main components of the LHC, the next world-class facility in high-energy physics, are the twin-aperture high-field superconducting cryomagnets to be installed in the existing 26.7-km long tunnel. After installation and alignment, the cryomagnets have to be interconnected. The interconnections must ensure the continuity of several functions: vacuum enclosures, beam pipe image currents (RF contacts), cryogenic circuits, electrical power supply, and thermal insulation. In the machine, about 1700 interconnections between cryomagnets are necessary. The interconnections constitute a unique system that is nearly entirely assembled in the tunnel. For each of them, various operations must be done: TIG welding of cryogenic channels (~ 50 000 welds), induction soldering of main superconducting cables (~ 10 000 joints), ultrasonic welding of auxiliary superconducting cables (~ 20 000 welds), mechanical assembly of various elements, and installation of the multi-layer insulation (~ 200 000 m2). Defective junctions could be very difficult and expensive to detect and repair. Reproducible and reliable processes must be implemented together with a strict quality control. The interconnection activities are optimized taking into account several constraints: limited space availability, tight installation schedule, high level of quality, high reliability and economical aspects. In this paper, the functions to be fulfilled by the interconnections and the various technologies selected are presented. Quality control at different levels (component/ interconnect, subsystem, system) is also described. The interconnection assembly sequences are summarized. Finally, the validation of the interconnection procedures is presented, based in particular on the LHC prototype cell assembly (STRING2)

    Copper Heat Exchanger for the External Auxiliary Bus-Bars Routing Line in the LHC Insertion Regions

    Get PDF
    The corrector magnets and the main quadrupoles of the LHC dispersion suppressors are powered by a special superconducting line (called auxiliary bus-bars line N), external to the cold mass and housed in a 50 mm diameter stainless steel tube fixed to the cold mass. As the line is periodically connected to the cold mass, the same gaseous and liquid helium cools both the magnets and the line. The final sub-cooling process (from around 4.5 K down to 1.9 K) consists in the phase transformation from liquid to superfluid helium. Heat is extracted from the line through the magnets via their point of junction. In dispersion suppressor zones, approximately 40 m long, the sub-cooling of the line is slightly delayed with respect to the magnets. This might have an impact on the readiness of the accelerator for operation. In order to accelerate the process, a special heat exchanger has been designed. It is located in the middle of the dispersion suppressor portion of the line. Its main function consists in providing a local point of heat extraction, creating two additional lambda fronts that propagate in opposite directions towards the extremities of the line. Both the numerical model and the sub-cooling analysis are presented in the paper for different configurations of the line. The design, manufacturing and integration aspects of the heat exchanger are described

    The Interconnections of the LHC Cryomagnets at CERN: Strategy Applied and First Results of the Industrialization Process

    Get PDF
    The final interconnections of the LHC superconducting magnets in the underground tunnel are performed by a contractor on a result-oriented basis. A consortium of firms was awarded the contract after competitive tendering based on a technical and commercial specification. The implementation of the specific technologies and tooling developed and qualified by CERN has required an important effort to transfer the know-how and implement the follow-up of the contractor. This paper summarizes the start-up phase and the difficulties encountered. The organization and management tools put in place during the ramping-up phase are presented. In addition to contractual adaptations of the workforce, several configuration changes to the workflows were necessary to reach production rates compatible with the overall schedule and with the different constraints: availability of magnets, co-activities with magnets transport and alignment, handling of non-conformities, etc. Also the QA procedures underwent many changes to reach the high level of quality mandatory to ensure the LHC performance. The specificities of this worksite are underlined and first figures of merit of the learning process are presented

    Multiwavelength optical observations of chromospherically active binary systems - II. EZ Pegasi

    Get PDF
    The star EZ Peg, long ago classified as cataclysmic variable, has been shown to be a chromospherically active binary system of the RS CVn-type. In this paper we have analysed, using the spectral subtraction technique, simultaneous spectroscopic observations of the Hα, HÎČ, Na I D_1 and D_2, He I D_3, Mg I b triplet, Ca II H & K, and Ca II infrared triplet lines. We have found that the hot component is the active star of the system, showing strong emission in the Hα, Ca Ir H & K, HΔ, and Ca II IRT lines, and a strong filling-in of the HÎČ line, however the Na I D_1 and D_2 and Mg I b triplet lines do not present filled-in. The He I D_3 could present a total filling-in due to microflaring. The observed variations (in different epochs and with the orbital phase) of the different activity indicators, formed at different height in the chromosphere, are correlated. Very broad wings have been found in the subtracted profiles of Hα and Ca II IRT λ8498 and λ8662 lines. These profiles are well matched using a two-component Gaussian fit (narrow and broad) and the broad component could be interpreted as arising from microflaring. The higher luminosity class of the hot component, that our spectra seem to indicate, could explain why the hot component is the active star of the system

    Cryogenic and vacuum sectorisation of the LHC arcs

    Get PDF
    Following the recommendation of the LHC TC of June 20th, 1995 to introduce a separate cryogenic distribution line (QRL), which opened the possibility to have a finer cryogenic and vacuum sectorisation of the LHC machine than the original 8 arcs scheme, a working group was set up to study the implications: technical feasibility, advantages and drawbacks as well as cost of such a sectorisation (DG/DI/LE/dl, 26 July 1995). This report presents the conclusions of the Working Group. In the LHC Conceptual Design Report, ref. CERN/AC/95-05 (LHC), 20 October 1995, the so-called "Yellow Book", a complete cryostat arc (~ 2.9 km) would have to be warmed up in order to replace a defective cryomagnet. Even by coupling the two large refrigerators feeding adjacent arcs at even points to speed up the warm-up and cool down of one arc, the minimum down-time of the machine needed to replace a cryomagnet would be more than a full month (and even 52 days with only one cryoplant). Cryogenic and vacuum sectorisation of an arc into smaller sectors is technically feasible and would allow to reduce the down-times considerably (by one to three weeks with four sectors of 750 m in length, with respectively two or one cryoplants). In addition, sectorisation of the arcs may permit a more flexible quality control and commissioning of the main machine systems, including cold testing of small magnet strings. Sectorisation, described in detail in the following paragraphs, consists essentially of installing several additional cryogenic and vacuum valves as well as some insulation vacuum barriers. Additional cryogenic valves are needed in the return lines of the circuits feeding each half-cell in order to complete the isolation of the cryoline QRL from the machine, allowing intervention (i.e. venting to atmospheric pressure) on machine sectors without affecting the rest of an arc. Secondly, and for the same purpose, special vacuum and cryogenic valves must be installed, at the boundaries of machine sectors, for the circuits not passing through the cryoline QRL. Finally, some additional vacuum barriers must be installed around the magnet cold masses to divide the insulation vacuum of the magnet cryostats into independent sub-sectors, permitting to keep under insulating vacuum the cryogenically floating cold masses, while a sector (or part of it) is warmed up and opened to atmosphere. A reasonable scenario of sectorisation, namely with four 650-750 m long sectors per arc, and each consisting of 3 or 4 insulation vacuum sub-sectors with two to four half-cells, would represent an additional total cost of about 6.6 MCHF for the machine. It is estimated that this capital investment would be paid off by time savings in less than three long unscheduled interventions such as the change of a cryomagnet
    • 

    corecore