Cryogenic and vacuum sectorisation of the LHC arcs

Abstract

Following the recommendation of the LHC TC of June 20th, 1995 to introduce a separate cryogenic distribution line (QRL), which opened the possibility to have a finer cryogenic and vacuum sectorisation of the LHC machine than the original 8 arcs scheme, a working group was set up to study the implications: technical feasibility, advantages and drawbacks as well as cost of such a sectorisation (DG/DI/LE/dl, 26 July 1995). This report presents the conclusions of the Working Group. In the LHC Conceptual Design Report, ref. CERN/AC/95-05 (LHC), 20 October 1995, the so-called "Yellow Book", a complete cryostat arc (~ 2.9 km) would have to be warmed up in order to replace a defective cryomagnet. Even by coupling the two large refrigerators feeding adjacent arcs at even points to speed up the warm-up and cool down of one arc, the minimum down-time of the machine needed to replace a cryomagnet would be more than a full month (and even 52 days with only one cryoplant). Cryogenic and vacuum sectorisation of an arc into smaller sectors is technically feasible and would allow to reduce the down-times considerably (by one to three weeks with four sectors of 750 m in length, with respectively two or one cryoplants). In addition, sectorisation of the arcs may permit a more flexible quality control and commissioning of the main machine systems, including cold testing of small magnet strings. Sectorisation, described in detail in the following paragraphs, consists essentially of installing several additional cryogenic and vacuum valves as well as some insulation vacuum barriers. Additional cryogenic valves are needed in the return lines of the circuits feeding each half-cell in order to complete the isolation of the cryoline QRL from the machine, allowing intervention (i.e. venting to atmospheric pressure) on machine sectors without affecting the rest of an arc. Secondly, and for the same purpose, special vacuum and cryogenic valves must be installed, at the boundaries of machine sectors, for the circuits not passing through the cryoline QRL. Finally, some additional vacuum barriers must be installed around the magnet cold masses to divide the insulation vacuum of the magnet cryostats into independent sub-sectors, permitting to keep under insulating vacuum the cryogenically floating cold masses, while a sector (or part of it) is warmed up and opened to atmosphere. A reasonable scenario of sectorisation, namely with four 650-750 m long sectors per arc, and each consisting of 3 or 4 insulation vacuum sub-sectors with two to four half-cells, would represent an additional total cost of about 6.6 MCHF for the machine. It is estimated that this capital investment would be paid off by time savings in less than three long unscheduled interventions such as the change of a cryomagnet

    Similar works