153 research outputs found

    Environmental baseline monitoring - Vale of Pickering: Phase I - final report (2015/16)

    Get PDF
    This report presents the collated results from the BGS-led project Science-based environmental baseline monitoring associated with shale gas development in the Vale of Pickering (including supplementary air quality monitoring in Lancashire). The project has been funded by a grant awarded by DECC for the period August 2015 – 31st March 2016. It complements (and extends to air quality) an on-going project, funded by BGS and the other project partners, in which similar activities are being carried out in the Fylde area of Lancashire. The project has initiated a wide-ranging environmental baseline monitoring programme that includes water quality (groundwater and surface water), seismicity, ground motion, atmospheric composition (greenhouse gases and air quality), soil gas and radon in air (indoors and outdoors). The motivation behind the project(s) was to establish independent monitoring in the area around the proposed shale gas hydraulic fracturing sites in the Vale of Pickering, North Yorkshire (Third Energy) and in Lancashire (Cuadrilla) before any shale gas operations take place. As part of the project, instrumentation has been deployed to measure, in real-time or near real-time, a range of environmental variables (water quality, seismicity, atmospheric composition). These data are being displayed on the project’s web site (www.bgs.ac.uk/Valeofpickering). Additional survey, sampling and monitoring has also been carried out through a co-ordinated programme of fieldwork and laboratory analysis, which has included installation of new monitoring infrastructure, to allow compilation of one of the most comprehensive environmental datasets in the UK. It is generally recognised that at least 12 months of baseline data are required. The duration of the grant award (7 months) has meant that this has not yet been possible. However there are already some very important findings emerging from the limited datasets which need be taken in to account when developing future monitoring strategy, policy and regulation. The information is not only relevant to the Vale of Pickering and Lancashire but will be more widely applicable in the UK and internationally. Although shale gas operations in other parts of the world are well-established there is a paucity of good baseline data and effective guidance on monitoring. It is hoped that the monitoring project will continue to allow at least 12 months of data for each of the work packages to be compiled and analysed. It will also allow the experience gained and the scientifically-robust findings to be used to develop and establish effective environmental monitoring strategies for shale gas and similar industrial activities

    The effect of storage temperature and duration on the microbial quality of bulk tank milk

    Get PDF
    peer-reviewedThe dairy industry in Ireland is currently undergoing a period of expansion and, as a result, it is anticipated that milk may be stored in bulk tanks on-farm for periods greater than 48 h. The objective of this study was to investigate the effects of storage temperature and duration on microbial quality of bulk tank milk when fresh milk is added to the bulk tank twice daily. Bulk tank milk stored at 3 temperatures was sampled at 24-h intervals during storage periods of 0 to 96 h. Bulk tank milk samples were analyzed for total bacterial count (TBC), psychrotrophic bacterial count (PBC), laboratory pasteurization count (LPC), psychrotrophic-thermoduric bacterial count (PBC-LPC), proteolytic bacterial count, lipolytic bacterial count, presumptive Bacillus cereus, sulfite-reducing Clostridia (SRC), and SCC. The bulk tank milk temperature was set at each of 3 temperatures (2°C, 4°C, and 6°C) in each of 3 tanks on 2 occasions during two 6-wk periods. Period 1 was undertaken in August and September, when all cows were in mid lactation, and period 2 was undertaken in October and November, when all cows were in late lactation. None of the bulk tank bacterial counts except the proteolytic count were affected by lactation period. The proteolytic bacterial count was greater in period 2 than in period 1. The TBC and PBC of milk stored at 6°C increased as storage duration increased. The TBC did not increase with increasing storage duration when milk was stored at 2°C or 4°C but the PBC of milk stored at 4°C increased significantly between 0 and 96 h. The numbers of proteolytic and lipolytic bacteria, LPC, or PBC-LPC in bulk tank milk were not affected by temperature or duration of storage. Presumptive B. cereus were detected in 10% of all bulk tank milk samples taken over the two 6-wk periods, with similar proportions observed in both. In bulk tank milk samples, a greater incidence of SRC was observed in period 2 (20%) compared with period 1 (3%). Milk produced on-farm with minimal bacterial contamination can be successfully stored at 2°C and 4°C for up to 96h with little effect on its microbial quality

    Environmental Baseline Monitoring Project. Phase II, final report

    Get PDF
    This report is submitted in compliance with the conditions set out in the grant awarded to the British Geological Survey (BGS), for the period April 2016 – March 2017, to support the jointly-funded project "Science-based environmental baseline monitoring". It presents the results of monitoring and/or measurement and preliminary interpretation of these data to characterise the baseline environmental conditions in the Vale of Pickering, North Yorkshire and for air quality, the Fylde in Lancashire ahead of any shale gas development. The two areas where the monitoring is taking place have seen, during the project, planning applications approved for the exploration for shale gas and hydraulic fracturing. It is widely recognised that there is a need for good environmental baseline data and establishment of effective monitoring protocols ahead of any shale gas/oil development. This monitoring will enable future changes that may occur as a result of industrial activity to be identified and differentiated from other natural and man-made changes that are influencing the baseline. Continued monitoring will then enable any deviations from the baseline, should they occur, to be identified and investigated independently to determine the possible causes, sources and significance to the environment and public health. The absence of such data in the United States has undermined public confidence, led to major controversy and inability to identify and effectively deal with impact/contamination where it has occurred. A key aim of this work is to avoid a similar situation and the independent monitoring being carried out as part of this project provides an opportunity to develop robust environmental baseline for the two study areas and monitoring procedures, and share experience that is applicable to the wider UK situation. This work is internationally unique and comprises an inter-disciplinary researcher-led programme that is developing, testing and implementing monitoring methodologies to enable future environmental changes to be detected at a local scale (individual site) as well as across a wider area, e.g. ‘shale gas play’ where cumulative impacts may be significant. The monitoring includes: water quality (groundwater and surface water), seismicity, ground motion, soil gas, atmospheric composition (greenhouse gases and air quality) and radon in air. Recent scientific and other commissioned studies have highlighted that credible and transparent monitoring is key to gaining public acceptance and providing the evidence base to demonstrate the industry’s impact on the environment and importantly on public health. As a result, BGS and its partners initiated in early 2015, a co-ordinated programme of environmental monitoring in Lancashire that was then extended to the Vale of Pickering in North Yorkshire after the Secretary of State for Energy and Climate Change (BEIS) awarded a grant to the British Geological Survey (BGS). The current duration of the grant award is to 31st March 2018. It has so far enabled baseline environmental monitoring for a period of more than 12 months. With hydraulic fracturing of shale gas likely to take place during late 2017/early 2018, the current funding will allow the environmental monitoring to continue during the transition from baseline to monitoring during shale gas operations. This report presents the monitoring results to April 2017 and a preliminary interpretation. A full interpretation is not presented in this report as monitoring is continuing and it is expected that there will be at least six months of additional baseline data before hydraulic fracturing takes place. This represents up to 50% more data for some components of the montoring, and when included in the analysis will significantly improve the characterisation and interpretation of the baseline. In addition to this report, the BGS web site contains further information on the project, near real-time data for some components of the monitoring and links to other projects outputs, e.g. reports and videos (www.bgs.ac.uk/research/groundwater/shaleGas/monitoring/home.html)

    Shapes of the 192,190^{192,190}Pb ground states from beta decay studies using the total absorption technique

    Full text link
    The beta decay of 192,190^{192,190}Pb has been studied using the total absorption technique at the ISOLDE(CERN) facility. The beta-decay strength deduced from the measurements, combined with QRPA theoretical calculations, allow us to infer that the ground states of the 192,190^{192,190}Pb isotopes are spherical. These results represent the first application of the shape determination method using the total absorption technique for heavy nuclei and in a region where there is considerable interest in nuclear shapes and shape effects

    Recommendations for environmental baseline monitoring in areas of shale gas development

    Get PDF
    Environmental monitoring plays a key role in risk assessment and management of industrial operations where there is the potential for the release of contaminants to the environment (i.e. air and water) or for structural damage (i.e. seismicity). The shale-gas industry is one such industry. It is also new to the UK and so specific environmental regulation and other controls have been introduced only recently. Associated with this is a need to carry out monitoring to demonstrate that the management measures to minimise the risk to the environment are being effective. While much of the monitoring required is common to other industries and potentially polluting activities, there are a number of requirements specific to shale gas and to what is a new and undeveloped industry. This report presents recommendations for environmental monitoring associated with shale-gas activities and in particular the monitoring required to inform risk assessment and establish the pre-existing environmental conditions at a site and surrounding area. This baseline monitoring is essential to provide robust data and criteria for detecting any future adverse environmental changes caused by the shale-gas operations. Monitoring is therefore required throughout the lifecycle of a shale gas operation. During this lifecycle, the objectives of the monitoring will change, from baseline characterisation to operational and post-operational monitoring. Monitoring requirements will also change. This report focusses on good practice in baseline monitoring and places it in the context of the longer-term environmental monitoring programme, recognising the need to transition from the baseline condition and to establish criteria for detecting any changes within the regulatory framework. The core suite of environmental monitoring activities currently required to support regulatory compliance, i.e. meet environmental and other permit conditions, encompasses monitoring of seismicity, water quality (groundwater and surface water) and air quality. Recommendations for each of these are included in this report. Additionally, recommendations for a number of other types of environmental monitoring are included – radon in air, soil gas and ground motion (subsidence/uplift). These are not associated directly with regulatory compliance but can provide information to support interpretation of statutory monitoring results. They are also considered important for public reassurance. Health impacts arising from radon and damage caused by ground motion are both issues of public concern in relation to shale gas

    Preliminary assessment of the environmental baseline in the Fylde, Lancashire

    Get PDF
    This report presents the collated preliminary results from the British Geological Survey (BGS) led project Science-based environmental baseline monitoring associated with shale gas development in the Fylde, Lancashire. The project has been funded by a combination of BGS National Capability funding, in-kind contributions from project partners and a grant awarded by the Department of Business Energy and Investment Strategy (BEIS). It complements an on-going project, in which similar activities are being carried out, in the Vale of Pickering, North Yorkshire. Further information on the projects can be found on the BGS website: www.bgs.ac.uk. The project has initiated a wide-ranging environmental baseline monitoring programme that includes water quality (groundwater and surface water), seismicity, ground motion, atmospheric composition (greenhouse gases and air quality), soil gas and radon in air (indoors and outdoors). The motivation behind the project(s) was to establish independent monitoring in the area around the proposed shale gas hydraulic fracturing sites in the Fylde, Lancashire (Cuadrilla Resources Ltd) before any shale gas operations take place. As part of the project, instrumentation has been deployed to measure, in real-time or near real-time, a range of environmental variables (water quality, seismicity, atmospheric composition). These data are being displayed on the project’s web site (www.bgs.ac.uk/lancashire). Additional survey, sampling and monitoring has also been carried out through a co-ordinated programme of fieldwork and laboratory analysis, which has included installation of new monitoring infrastructure, to allow compilation of one of the most comprehensive environmental datasets in the UK. The monitoring programme is continuing. However, there are already some very important findings emerging from the limited datasets which should be taken into account when developing future monitoring strategy, policy and regulation. The information is not only relevant to Lancashire but will be applicable more widely in the UK and internationally. Although shale gas operations in other parts of the world are well-established, there is a paucity of good baseline data and effective guidance on monitoring. The project will also allow the experience gained, and the scientifically-robust findings to be used, to develop and establish effective environmental monitoring strategies for shale gas and similar industrial activities

    Hepatic abnormalities in patients with chronic granulomatous disease

    Get PDF
    Chronic granulomatous disease (CGD) is a rare congenital disorder characterized by repeated bacterial and fungal infections. Aside from a high incidence of liver abscess, little is known about hepatic involvement in CGD. The aim of this study was to describe the spectrum of liver abnormalities seen in CGD. The charts of 194 patients with CGD followed at the NIH were reviewed, with a focus on liver abnormalities. Liver enzyme elevations occurred on at least one occasion in 73% of patients during a mean of 8.9 years of follow-up. ALT elevations were generally transient. Although transient alkaline phosphatase (ALP) elevations were also common, persistent ALP elevations lasting up to 17.6 years were seen in 25% of patients. Liver abscess occurred in 35% of patients. Drug-induced hepatotoxicity was documented in 15% of patients but likely occurred more frequently. Hepatomegaly was found in 34% and splenomegaly in 56% of patients. Liver histology showed granulomata in 75% and lobular hepatitis in 90% of specimens. Venopathy of the portal vein was common (80%) and associated with splenomegaly. Venopathy of the central vein was also common (63%) and was associated with the number of abscess episodes. Nodular regenerative hyperplasia (NRH) was seen in 9 patients, including 6 of 12 autopsy specimens. CONCLUSION: Liver enzyme abnormalities occur frequently in patients with CGD. In addition to liver abscesses and granulomata, drug hepatotoxicity is likely underappreciated. Vascular lesions such as venopathy and--to a lesser extent--NRH are common. The cause and clinical consequences of venopathy await prospective evaluation

    The Science of Sungrazers, Sunskirters, and Other Near-Sun Comets

    Get PDF
    This review addresses our current understanding of comets that venture close to the Sun, and are hence exposed to much more extreme conditions than comets that are typically studied from Earth. The extreme solar heating and plasma environments that these objects encounter change many aspects of their behaviour, thus yielding valuable information on both the comets themselves that complements other data we have on primitive solar system bodies, as well as on the near-solar environment which they traverse. We propose clear definitions for these comets: We use the term near-Sun comets to encompass all objects that pass sunward of the perihelion distance of planet Mercury (0.307 AU). Sunskirters are defined as objects that pass within 33 solar radii of the Sun’s centre, equal to half of Mercury’s perihelion distance, and the commonly-used phrase sungrazers to be objects that reach perihelion within 3.45 solar radii, i.e. the fluid Roche limit. Finally, comets with orbits that intersect the solar photosphere are termed sundivers. We summarize past studies of these objects, as well as the instruments and facilities used to study them, including space-based platforms that have led to a recent revolution in the quantity and quality of relevant observations. Relevant comet populations are described, including the Kreutz, Marsden, Kracht, and Meyer groups, near-Sun asteroids, and a brief discussion of their origins. The importance of light curves and the clues they provide on cometary composition are emphasized, together with what information has been gleaned about nucleus parameters, including the sizes and masses of objects and their families, and their tensile strengths. The physical processes occurring at these objects are considered in some detail, including the disruption of nuclei, sublimation, and ionisation, and we consider the mass, momentum, and energy loss of comets in the corona and those that venture to lower altitudes. The different components of comae and tails are described, including dust, neutral and ionised gases, their chemical reactions, and their contributions to the near-Sun environment. Comet-solar wind interactions are discussed, including the use of comets as probes of solar wind and coronal conditions in their vicinities. We address the relevance of work on comets near the Sun to similar objects orbiting other stars, and conclude with a discussion of future directions for the field and the planned ground- and space-based facilities that will allow us to address those science topics

    Beyond the Womb and the Tomb: Identity, (Dis)embodiment and the Life Course

    Get PDF
    Grounded in the authors’ theoretical and ethnographic work on pregnancy and social life after death, this article explores the ways in which the body is involved in processes of identification. With a focus on the embodied nature of social identity, the article nonetheless problematizes a model of the life course that begins at the moments of birth and ends at death. Instead, it offers a more extended temporal perspective and examines other ways in which identity may be claimed, for example, via material objects and practices which evoke the body as imagined or remembered. By documenting pre-birth and post-mortem identity-making of this kind, it demonstrates how the unborn and the dead may come into social existence. In addition, a cultural privileging of both the body and visuality is shown to shore up the capacity of material objects and practices to shape social identities in a highly selective fashion. The article therefore proposes that models of the life course need to accommodate the meanings of pre-birth and post-mortem materialities and so incorporate a conceptualization of social identity as contested, relational and inevitably incomplete

    Environmental monitoring : phase 4 final report (April 2018 - March 2019)

    Get PDF
    This report describes the results of activities carried out as part of the Environmental Monitoring Project (EMP) led by the British Geological Survey (BGS) in areas around two shale gas sites in England – Kirby Misperton (Vale of Pickering, North Yorkshire) and Preston New Road (Fylde, Lancashire). It focuses on the monitoring undertaken during the period April 2018–March 2019 but also considers this in the context of earlier monitoring results that have been covered in reports for earlier phases of the project (Phases I–IV) 2 . The EMP project is a multi-partner project involving BGS together with Public Health England (PHE), University of Birmingham, University of Bristol, University of Manchester, Royal Holloway University of London (RHUL) and University of York. The work has been enabled by funding from a combination of the BGS National Capability programme, a grant awarded by the UK Government’s Department for Business Energy & Industrial Strategy (BEIS) and additional benefit-in-kind contributions from all partners. The project comprises the comprehensive monitoring of different environment compartments and properties at and around the two shale-gas sites. The component parts of the EMP are all of significance when considering environmental and human health risks associated with shale gas development. Included are seismicity, ground motion, water (groundwater and surface water), soil gas, greenhouse gases, air quality, and radon. The monitoring started before hydraulic fracturing had taken place at the two locations, and so the results obtained before the initiation of operations at the shale-gas sites represent baseline conditions. It is important to characterise adequately the baseline conditions so that any future changes caused by shale gas operations, including hydraulic fracturing, can be identified. This is also the case for any other new activities that may impact those compartments of the environment being monitored as part of the project. In the period October 2018–December 2018, an initial phase of hydraulic fracturing took place at the Preston New Road (PNR) shale-gas site (shale gas well PNR1-z) in Lancashire. This was followed by a period of flow testing of the well to assess its performance (to end of January 2019). The project team continued monitoring during these various activities and several environmental effects were observed. These are summarised below and described in more detail within the report. The initiation of operations at the shale-gas site signified the end of baseline monitoring. At the Kirby Misperton site (KMA), approval has not yet been granted for hydraulic fracturing of the shale gas well (KM8), and so no associated operations have taken place during the period covered by this report. The effects on air quality arising from the mobilisation of equipment in anticipation of hydraulic fracturing operations starting was reported in the Phase III report, and in a recently published paper3 . Following demobilisation of the equipment and its removal from the site, conditions returned to baseline and the on-going monitoring (reported in this report) is effectively a continuation of baseline monitoring
    • …
    corecore