44 research outputs found

    A new set of magnetic septa in the CERN PS complex

    Get PDF
    Over the last few years the CERN PS Complex has been upgraded to fulfill the requirements of two major projects : (i) - producing and transferring lead ions to the SPS for high energy physics experiments and (ii) raising the PSB to PS transfer energy from 1 to 1.4 GeV to generate the high brightness beam for the LHC. To cope with the tight demands imposed by these upgrades, ten magnetic septa, operating under vacuum in the PSB and the PS have been redesigned and progressively replaced. The new devices are bakeable, better suited to high vacuum operation and with higher performance. This paper reports the main characteristics and technological advantages of these magnets together with their present performance

    Consolidation project of the electrostatic septa in the CERN PS ring

    Get PDF
    After almost two decades of reliable service, the electrostatic septa of the CERN PS complex need to be upgraded. This is to fulfil the increased requirements on vacuum performance and the need to reduce the time spent on maintenance interventions. Two electrostatic septa are used in the PS ring: septum 23 is used for a resonant slow extraction, while septum 31 is used for the so-called 'continuous transfer' (CT) 5-turn extraction. This paper describes the experience gained with these septa over the years. We report the main characteristics and technological advantages of the new septum 23 together with its present performance

    The Septa for LEIR Extraction and PS Injection

    Get PDF
    The Low Energy Ion Ring (LEIR) is part of the CERN LHC injector chain for ions. The LEIR extraction uses a pulsed magnetic septum, clamped around a metallic vacuum chamber. Apart from separating the ultra high vacuum in the LEIR ring from the less good vacuum in the transfer line to the PS this chamber also serves as magnetic screen and retains the septum conductor in place. The PS ion injection septum consists of a pulsed laminated magnet under vacuum, featuring a single-turn water cooled coil and a remote positioning system. The design, the construction and the commissioning of both septa are described

    The CERN PS multi-turn extraction based on beam splittting in stable islands of transverse phase space: Design Report

    Get PDF
    Since 2001 considerable effort has been devoted to the study of a possible replacement of the continuous-transfer extraction mode from the PS to the SPS. Such an approach, called Multi-Turn Extraction (MTE), is based on capture of the beam inside stable islands of transverse phase space, generated by sextupoles and octupoles, thanks to a properly chosen tune variation. Both numerical simulations and measurements with beam were performed to understand the properties of this new extraction mode. The experimental study was completed at the end of 2004 and by the end of 2005 a scheme to implement this novel approach in the PS machine was defined and its performance assessed. This design report presents the outcome of the studies undertaken both in terms of technical issues as well as of resources necessary to implement the proposed scheme

    CTF3 Design Report: Preliminary Phase

    Get PDF
    The design of CLIC is based on a two-beam scheme, where the short pulses of high power 30 GHz RF are extracted from a drive beam running parallel to the main beam. The 3rd generation CLIC Test Facility (CTF3) will demonstrate the generation of the drive beam with the appropriate time structure, the extraction of 30 GHz RF power from this beam, as well as acceleration of a probe beam with 30 GHz RF cavities. The project makes maximum use of existing equipment and infrastructure of the LPI complex, which became available after the closure of LEP. In the first stage of the project, the "Preliminary Phase", the existing LIL linac and the EPA ring, both modified to suit the new requirements, are used to investigate the technique of frequency multiplication by means of interleaving bunches from subsequent trains. This report describes the design of this phase

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF
    The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+ee^+e^- collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years

    Remote positioning system bt smv 20