12 research outputs found

    Are Australian pre-service physical education teachers prepared to teach inclusive physical education?

    Get PDF
    Abstract: Australian pre-service physical education (PE) teachers must be prepared for the reality of teaching in inclusive classrooms. Past studies have indicated that the amount of academic preparedness can affect pre-service PE teachers’ intentions to successfully teach in inclusive settings. The current study measured these intentions in a sample of pre-service PE teachers from two different universities. This modified survey required participants to respond to two separate scenarios: one teaching inclusive PE to a student with attention deficit hyperactivity disorder, and one to a student with autism. All participants completed an adapted PE unit with an embedded practicum of different lengths. Findings indicated that pre-service teachers’ who experienced the larger adapted PE practicum had more favourable intentions towards teaching students with both disabilities compared to the other cohort. Implications of this research to improve Australian PE teacher training are discussed and recommendations are made

    Are Australian pre-service physical education teachers prepared to teach inclusive physical education?

    Get PDF
    Australian pre-service physical education (PE) teachers must be prepared for the reality of teaching in inclusive classrooms. Past studies have indicated that the amount of academic preparedness can affect pre-service PE teachers' intentions to successfully teach in inclusive settings. The current study measured these intentions in a sample of pre-service PE teachers from two different universities. This modified survey required participants to respond to two separate scenarios: one teaching inclusive PE to a student with attention deficit hyperactivity disorder, and one to a student with autism. All participants completed an adapted PE unit with an embedded practicum of different lengths. Findings indicated that pre-service teachers' who experienced the larger adapted PE practicum had more favourable intentions towards teaching students with both disabilities compared to the other cohort. Implications of this research to improve Australian PE teacher training are discussed and recommendations are made

    The Science Performance of JWST as Characterized in Commissioning

    Full text link
    This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.Comment: 5th version as accepted to PASP; 31 pages, 18 figures; https://iopscience.iop.org/article/10.1088/1538-3873/acb29

    The James Webb Space Telescope Mission

    Full text link
    Twenty-six years ago a small committee report, building on earlier studies, expounded a compelling and poetic vision for the future of astronomy, calling for an infrared-optimized space telescope with an aperture of at least 4m4m. With the support of their governments in the US, Europe, and Canada, 20,000 people realized that vision as the 6.5m6.5m James Webb Space Telescope. A generation of astronomers will celebrate their accomplishments for the life of the mission, potentially as long as 20 years, and beyond. This report and the scientific discoveries that follow are extended thank-you notes to the 20,000 team members. The telescope is working perfectly, with much better image quality than expected. In this and accompanying papers, we give a brief history, describe the observatory, outline its objectives and current observing program, and discuss the inventions and people who made it possible. We cite detailed reports on the design and the measured performance on orbit.Comment: Accepted by PASP for the special issue on The James Webb Space Telescope Overview, 29 pages, 4 figure

    Perioperative Acetaminophen and Dexmedetomidine Eliminate Post-Operative Opioid Requirement following Pediatric Tonsillectomy

    No full text
    Administration of post-operative opioids following pediatric tonsillectomy can elicit respiratory events in this patient population that often arise as central and obstructive sleep apnea. The primary objective of this study was to determine whether a perioperative combination of dexmedetomidine and acetaminophen could eliminate post-operative (in recovery and at home) opioid requirements. Following IRB approval and a waiver for informed consent, the medical records of 681 patients who underwent tonsillectomy between 1 January 2013 and 31 December 2018 were evaluated. Between 1 January 2013 and 31 December 2015, all patients received a fentanyl-sevoflurane-based anesthetic, without acetaminophen or dexmedetomidine, and received opioids in recovery and for discharge home. On 1 January 2016, an institution-wide practice change replaced this protocol with a multimodal perioperative regimen of acetaminophen (intravenous or enteral) and dexmedetomidine and eliminated post-operative opioids. This is the first time that the effect of an acetaminophen and dexmedetomidine combination on the perioperative and home opioid requirement has been reported. Primarily, we compared the need for rescue opioids in the post-anesthesia care period and after discharge. The multi-modal protocol eliminated the need for post-tonsillectomy opioid administration. Dexmedetomidine in combination with acetaminophen eliminated the need for post-operative opioids in the recovery period

    A map of human genome variation from population-scale sequencing

    Get PDF
    The 1000 Genomes Project aims to provide a deep characterization of human genome sequence variation as a foundation for investigating the relationship between genotype and phenotype. Here we present results of the pilot phase of the project, designed to develop and compare different strategies for genome-wide sequencing with high-throughput platforms. We undertook three projects: low-coverage whole-genome sequencing of 179 individuals from four populations; high-coverage sequencing of two mother-father-child trios; and exon-targeted sequencing of 697 individuals from seven populations. We describe the location, allele frequency and local haplotype structure of approximately 15 million single nucleotide polymorphisms, 1 million short insertions and deletions, and 20,000 structural variants, most of which were previously undescribed. We show that, because we have catalogued the vast majority of common variation, over 95% of the currently accessible variants found in any individual are present in this data set. On average, each person is found to carry approximately 250 to 300 loss-of-function variants in annotated genes and 50 to 100 variants previously implicated in inherited disorders. We demonstrate how these results can be used to inform association and functional studies. From the two trios, we directly estimate the rate of de novo germline base substitution mutations to be approximately 10−8 per base pair per generation. We explore the data with regard to signatures of natural selection, and identify a marked reduction of genetic variation in the neighbourhood of genes, due to selection at linked sites. These methods and public data will support the next phase of human genetic researc

    Characterization of JWST science performance from commissioning: National Aeronautics and Space Administration European Space Agency Canadian Space Agency

    No full text

    Characterization of JWST science performance from commissioning: National Aeronautics and Space Administration European Space Agency Canadian Space Agency

    No full text
    corecore