12 research outputs found

    Development Of Scalable Production Concepts For The Cost-Efficient Assembly Of PEM Fuel Cell Systems For Mobile Applications

    Get PDF
    Polymer-Electrolyte-Membrane (PEM) fuel cell systems will contribute to enable climate-neutral mobility through the chemical reaction of hydrogen and oxygen. PEM fuel cells address applications which are hardly decarbonized by HV batteries. But apart from its advantages, such as short refueling times and higher energy densities related to batteries or locally emission-free operation compared to conventional drivetrains, the fuel cell technology still faces challenges that inhibit its wide market penetration. Especially the low production volumes result in costly manufacturing processes. The assembly of the fuel cell stack and balance-of-plant components to a system is predominantly of manufactory character. There is a consensus in the literature that scaling up the production is associated with cost reduction effects. But in order to increase the demand that justifies a growth in unit numbers, the costs per system have to be reduced. With regard to this so-called "hen-and-egg problem", a reduction of production costs for small output numbers is necessary, while already considering the future necessity to scale the production. This paper discusses the development of scalable production concepts for PEM fuel cell system assemblies. In addition to a modular production concept, the associated production scenarios are also considered. For a generic fuel cell system, a possible assembly sequence and assembly tasks are derived from the bill of materials. The assembly durations for the individual steps are then determined according to the Methods-Time-Measurement (MTM) methodology. This methodological approach is intended to provide an estimate for each process step in the assembly and can be transferred to other fuel cell systems. The paper shows how a bill of materials can be used to estimate the cycle time for a system, but also the cycle time for defined stations. In addition, by considering different scaling mechanisms, further improvements in the assembly process are shown, based on the results from the MTM analysis

    Response of a Lake Michigan coastal lake to anthropogenic catchment disturbance

    Full text link
    A paleolimnological investigation of post-European sediments in a Lake Michigan coastal lake was used to examine the response of Lower Herring Lake to anthropogenic impacts and its role as a processor of watershed inputs. We also compare the timing of this response with that of Lake Michigan to examine the role of marginal lakes as ‘early warning’ indicators of potential changes in the larger connected system and their role in buffering Lake Michigan against anthropogenic changes through biotic interactions and material trapping. Sediment geochemistry, siliceous microfossils and nutrient-related morphological changes in diatoms, identified three major trophic periods in the recent history of the lake. During deforestation and early settlement (pre-1845–1920), lake response to catchment disturbances results in localized increases in diatom abundances with minor changes in existing communities. In this early phase of disturbance, Lower Herring Lake acts as a sediment sink and a biological processor of nutrient inputs. During low-lake levels of the 1930s, the lake goes through a transitional period characterized by increased primary productivity and a major shift in diatom communities. Post-World War II (late 1940s–1989) anthropogenic disturbances push Lower Herring Lake to a new state and a permanent change in diatom community structure dominated by Cyclotella comensis . The dominance of planktonic summer diatom species associated with the deep chlorophyll maximum (DCM) is attributed to epilimnetic nutrient depletion. Declining Si:P ratios are inferred from increased sediment storage of biogenic silica and morphological changes in the silica content of Aulacoseira ambigua and Stephanodiscus niagarae . Beginning in the late 1940s, Lower Herring Lake functions as a biogeochemical processor of catchment inputs and a carbon, nutrient and silica sink. Microfossil response to increased nutrients and increased storage of biogenic silica in Lower Herring Lake and other regional embayments occur approximately 20–25 years earlier than in a nearby Lake Michigan site. Results from this study provide evidence for the role of marginal lakes and bays as nutrient buffering systems, delaying the impact of anthropogenic activities on the larger Lake Michigan system.Peer Reviewedhttp://deepblue.lib.umich.edu/bitstream/2027.42/43091/1/10933_2004_Article_1688.pd

    A prospective randomized comparison of the minimally invasive direct anterior and the transgluteal approach for primary total hip arthroplasty

    No full text
    Background: The presented prospective randomized controlled single-centre study compares the clinical outcome up to 12 months after total hip arthroplasty using a minimally invasive single-incision direct anterior (DAA) and a direct transgluteal lateral approach. Methods: A total of 123 arthroplasties were evaluated utilizing the Harris Hip Score (HHS), the extra short musculoskeletal functional assessment questionnaire (XSFMA), the Short Form 36 (SF-36) health survey, a Stepwatch™ Activity Monitor (SAM), and a timed 25 m foot walk (T25-FW). Postoperative x-ray images after THA were reviewed to determine inclination and stem positioning. Results: At final follow-up, the XSFMA functional index scores were 10.3 (anterior) and 15.08 (lateral) while the bother index summed up to a score of 15.8 (anterior) and 21.66 (lateral) respectively, thus only differing significantly for the functional index (p = 0.040 and p = 0.056). The SF-36 physical component score (PCS) was 47.49 (anterior) and 42.91 (lateral) while the mental component score (MCS) summed up to 55.0 (anterior) and 56.23 (lateral) with a significant difference evident for the PCS (p = 0.017; p = 0.714). Patients undergoing THA through a DAA undertook a mean of 6402 cycles per day while those who had undergone THA through a transgluteal approach undertook a mean of 5340 cycles per day (p = 0.012). Furthermore, the obtained outcome for the T25-FW with 18.4 s (anterior) and 19.75 s (lateral) and the maximum walking distance (5932 m and 5125 m) differed significantly (p = 0.046 and p = 0.045). The average HHS showed no significant difference equaling 92.4 points in the anterior group and 91.43 in the lateral group (p = 0.477). The radiographic analysis revealed an average cup inclination of 38.6° (anterior) and 40.28° (lateral) without signs of migration. Conclusion: In summary, our outcomes show that after 1 year THA through the direct anterior approach results in a higher patient activity compared to THA utilizing a transgluteal lateral approach while no differences regarding hip function are evident

    Art in Theory 1900-1990 : An Anthology of Changing Ideas

    No full text

    7. ANHANG

    No full text

    Literaturverzeichnis

    No full text

    Literatur

    No full text
    corecore