1,687 research outputs found

    Life and Land (In Words and Pictures)

    Get PDF

    Wace and his Authorities

    Get PDF
    n/

    The Landing of Queen Isadella in 1326

    Get PDF
    n/

    Note on Magna Carta

    Get PDF
    n/

    CRICKET BOWLING: A TWO-SEGMENT LAGRANGIAN MODEL

    Get PDF
    In this study, a Lagrangian forward solution of the bowling arm in cricket is made using a two-segment rigid body model, coupled with projectile equations for the free flight of the ball. For given initial arm positions and constant joint torques, the equations are solved numerically to determine the ball speed and arm angle at release so that the ball can land on a predetermined position on the pitch. The model was driven with kinematic data from video obtained from an elite bowler. The model can be analysed in order to study the biomechanics of the bowling arm as well as to quantify the effects of changing input parameters on the trajectory and speed of the ball

    Patient choice at the point of GP referral: Department of Health

    Get PDF
    1 The Department of Health has a Public Service Agreement target to ensure that by the end of 2005 every hospital appointment in the National Health Service in England (the NHS) will be booked for the convenience of the patient, making it easier for patients and their General Practitioners (GPs) to choose the hospital and consultant that best meets their need. The Department aims to provide patients with the opportunity to choose between four to five healthcare providers for elective hospital treatment by December 2005. In consultation with their GP, patients should be able to choose, from a menu of NHS and independent sector healthcare providers, their preferred location for treatment. Patients should also be able to book the time and date of their initial outpatient appointment within 24 hours of the decision to refer the patient for treatment. This target will apply to around 9.4 million patients referred for hospital treatment by their GP each year, around four per cent of the total estimated 241 million GP consultations. 2 Choice at referral can contribute to a more patientfocused health service, bringing benefits to both patients and the NHS. But providing such a choice will not happen by accident. There are a number of dependencies and interactions with other policies that need to be managed. Information Technology (IT) systems need to be developed and modified and significant cultural, organisational and behavioural changes will need to be made by patients, NHS organisations and staff. 3 This report examines whether the Department is on track to deliver choice at the point of referral successfully by the target date of December 2005. Our work has found that: a Progress has been made towards delivering choice at referral through establishing the required organisational infrastructure, commissioning new IT systems and modifications to existing ones, and providing support for the NHS organisations that will deliver it. b The engagement of GPs is currently low and is a key risk which the Department must address to deliver choice successfully. The Department plans to address this risk through a campaign to inform and engage GPs during 2005 and it will need to monitor carefully the progress of this campaign. c Choice at referral will be delivered most efficiently and effectively through electronic booking (e-booking, also known as Choose and Book), in which the Electronic Booking Service, commissioned by the Department’s National Programme for IT (NPfIT), is linked to upgraded or new computer systems in hospitals and GPs’ surgeries. However, e-booking will not be universally available by December 2005. Until e-booking is fully adopted choice will have to be provided in other, less efficient, ways. d Parts of the NHS still have much to do if they are to deliver choice. A significant minority of Primary Care Trusts do not yet have adequate plans in place to manage the introduction of choice and some may struggle to manage the required new commissioning arrangements. 4 Our more detailed findings are as follows. Progress has been made towards delivering choice at referral 5 The Department believes that choice is affordable. Additional annual infrastructure and transaction costs are estimated to be £122 million – or 1.4 per cent of the current total expenditure on elective care. The main aim of introducing choice is to improve services for patients, but it should lead to increased efficiencies in primary and secondary care services worth an estimated £71 million, off-setting some of these costs. 6 It is essential that choice is supported by other elements of system reform including e-booking, payment by results, commissioning and appropriate capacity. Modelling exercises have shown that the system reforms should work in harmony with one another. Payment by results should enable the transfer of funding to follow the patient and there should be sufficient capacity across the system to enable choice to be effective. 7 Much of the organisational infrastructure that is required for choice is in place and there is clear accountability for the delivery of the programme. To strengthen detailed national programme management arrangements the Department created, on 22 December 2004, a new post of National Implementation Director for Choose and Book, with effect from 10 January 2005. The new Director will be responsible for overseeing the implementation of choice within the NHS whilst the National Programme for IT Group Programme Director for Choose and Book will continue to be responsible for Choose and Book technology development and deployment, patient access and Choose and Book contract management. 8 The Department has provided different types of support to the NHS – for example, ten pilot schemes have been run to test the policy in practice. It has set up a system for periodically measuring progress and used this to establish the position at the end of October 2004, creating a baseline against which to monitor future progress. 9 Research has identified what information patients will want to base their choices on, and the Department is seeking to provide this. While it is unlikely that full information will be available for December 2005, the majority of those aspects identified by patients as being the most important, such as waiting times and basic access information, will be in place. The Department plans to increase the information available over time. The key risk to the delivery of choice is the engagement of GPs 10 Choice cannot be delivered without support from GPs but our survey of GPs found that around half of GPs know very little about it and 61 per cent feel either very negative or a little negative. GPs’ concerns include practice capacity, workload, consultation length and fears that existing health inequalities will be exacerbated. The Department has deliberately held back its main effort to inform and engage GPs about choice until it has had a working e-booking system to show GPs, but it intends to mount a campaign to inform and engage GPs during 2005. Until e-booking is fully adopted choice will be supported by other mechanisms 11 The Department has commissioned Atos Origin to develop a national system for e-booking, which will be linked to upgraded or new Patient Administration Systems in hospitals and IT systems in GPs’ surgeries to provide an overall service known as e-booking. The National Programme for IT has planned the roll out of e-booking on an incremental basis to minimise risk, and to link it by the end of 2005 to some 60 to 70 per cent of hospital systems and GP practices. 12 E-booking is the most effective and efficient way of delivering the Department’s plans for choice, and alternative booking mechanisms offer poorer value for money. Atos Origin has delivered a functioning system and the first booking using e-booking was made in July 2004. However the roll-out of e-booking has been slower than planned and at the end of December 2004 only 63 bookings had been made. Problems have included the reluctance of users to work with an unreliable end-to-end system, limited progress in linking to GP and hospital systems, and the limited number of GPs willing to use the system. 13 The Department believes that new releases of software have addressed the reliability of the whole end-to-end system and that having a fully operational system will encourage GPs to engage with e-booking. The roll-out of changes to hospital systems to allow them to link to e-booking is gathering pace and four types of GP systems can now link to e-booking, although the largest supplier has not yet agreed an implementation plan. A combined team of Departmental and NHS personnel are working with the three main existing GP system suppliers to agree a national deployment schedule. This work should be completed by February 2005, along with a nationally negotiated commercial arrangement. The Department is also developing and trialling contingency plans against further delays, as well as alternatives to the fully integrated Choose and Book solution. Parts of the NHS still have much to do 14 Programme management arrangements in the NHS are incomplete. While most Primary Care Trusts expect to be able to deliver the choice target, there is variability in their overall performance. As many as a quarter of Primary Care Trusts currently forecast that they will not deliver the choice targets. In addition, some Primary Care Trusts may struggle to manage the new commissioning arrangements and two-thirds have yet to commission the required number of providers. The department is developing a framework of support to assist trusts to overcome these obstacles. 15 The Department needs urgently to address the low level of GP support for their plans for implementing choice at referral, and should: I Press on urgently with its plans for informing GPs about the implementation of choice at referral and its impact on GPs and patients. II Monitor the views of GPs, for example by a regular survey, repeating key questions from our own survey, to assess the rate of progress being achieved towards the level of support needed to meet its target of full implementation by December 2005. III Consider whether further action is needed to secure the required level of GP support, once GPs are fully informed on what choice at referral involves. 16 The Department should also: IV Complete its planned benefits realisation plan for choice at referral by the summer of 2005, along with a monitoring mechanism and quantified targets. V Keep under regular and close review the progress of its planned implementation of choice through implementing e-booking and consider the scope for accelerating the roll-out of e-booking to make it available everywhere by December 2005. VI If it becomes clear that it is not possible to deliver e-booking everywhere by December 2005, the Department should: a monitor closely the development of the interim solutions to ensure that they meet their delivery dates; and b ensure that the implementation of interim solutions does not detract from the priority of bringing in fully integrated e-booking systems as soon as possible. VII Establish an evaluation framework for Primary Care Trust commissioning to assist Strategic Health Authorities in assessing the capacity and skills of Primary Care Trusts in this area and securing improvements in capacity and skills where necessary

    TWO NEW PLOCENE SPECIES OF CYCLOSTEPHANOS (BACILLARIOPHYCEAE) WITH COMMENTS ON THE CLASSIFICATION OF THE FRESHWATER THALASSIOSIRACEAE 1

    Full text link
    Two new species of the diatom genus Cyclostephanos Round are described from Pliocene fossil deposits in western North America. Cyclostephanos undatus is distinguished from other Cyclostephanos species by its tangentially undulate valve face; Cyclostephanos fenestratus is distinguished by its extremely shallow alveoli. This paper records previously unreported morphological detail of Cyclostephanos and speculates that structure of the punctum, labiate process and strutted process may enhance diagnosis of the freshwater genera of the Thalassiosiraceae Lebour emend. Hasle. Cyclostephanos undatus is similar to several Cyclotella species, but its external costae are raised and its alveolar morphology is similar to that of Cyclostephanos dubius (Fricke) Round. Cyclostephanos fenestratus is similar in external view to Stephanodiscus Ehrenb. However, the two species described here have flat cribra covering the mantle puncta and the labiate processes appear to lack external tubes, whereas Stephanodiscus species have domed mantle cribra and external tubes.Peer Reviewedhttp://deepblue.lib.umich.edu/bitstream/2027.42/65645/1/j.1529-8817.1986.tb04154.x.pd

    Electroluminescence from single nanowires by tunnel injection: an experimental study

    Get PDF
    We present a hybrid light-emitting diode structure composed of an n-type gallium nitride nanowire on a p-type silicon substrate in which current is injected along the length of the nanowire. The device emits ultraviolet light under both bias polarities. Tunnel-injection of holes from the p-type substrate (under forward bias) and from the metal (under reverse bias) through thin native oxide barriers consistently explains the observed electroluminescence behaviour. This work shows that the standard p-n junction model is generally not applicable to this kind of device structure.Comment: 6 pages, 6 figure

    Institutions versus market forces: Explaining the employment insecurity of European individuals during (the beginning of) the financial crisis

    Get PDF
    In reaction to the recent financial crisis, the European Commission re-stated its view that the balance between flexibility and security is the key to success for the future of the European social economy, as well as its belief in the power of institutional arrangements it deems necessary for this balance. However, do powerful institutions actually counter market forces where flexicurity is concerned? In this paper we address this question by analysing the impact of institutional configurations and market factors on perceived employment insecurity among workers in Europe. We use the 4th wave of the European Social Survey for 2008/2009, which covers 22 countries, and implement a multi-level approach where contextual effects are taken into account and individuals are considered to be embedded within a country. We find that policies that secure one’s income and employability skills, such as passive and active labour market policies, are more important for providing employment security for individuals than institutions that secure one’s current job, such as employment protection. Of the economic and labour market factors, general market conditions (measured as employment rate average) and the strength of the financial crisis (measured as gross domestic product growth rate from 2008 to 2009) are both similarly influential in explaining cross-national variance in the employment insecurity perception of individuals. More generally, and most interestingly, we find that institutional factors lose their significance when market factors are taken into account. Thus, it seems that differences in economic and labour market conditions between countries better explain why workers feel insecure about their employment, than the differences in employment and income policies. Although this result could be influenced by the time period under investigation, which is characterized by a financial crisis, results from previous studies using data from different periods suggest that it is not period-specific
    • …
    corecore