304 research outputs found

    The strategic integration of agile and lean supply

    Get PDF
    Lean supply is closely associated with enabling flow and the elimination of wasteful variation within the supply chain. However, lean operations depend on level scheduling and the growing need to accommodate variety and demand uncertainty has resulted in the emergence of the concept of agility. This paper explores the role of inventory and capacity in accommodating such variation and identifies how TRIZ separation principles and TOC tools may be combined in the integrated development of responsive and efficient supply chains. A detailed apparel industry case study is used to illustrate the application of these concepts and tools

    Quality management in heavy duty manufacturing industry: TQM vs. Six Sigma

    Get PDF
    ‘Is TQM a management fad?’ This question has been extensively documented in the quality management literature; and will be tackled in this research though a critical literature review on the area. ‘TQM versus Six-Sigma’ debate, which has also been a fundamental challenge in this research filed, is addressed by a thematic and chronological review on the peer papers. To evaluate this challenge in practice, a primary research in heavy duty machinery production industry have been conducted using a case-study on, J C Bamford Excavators Ltd (JCB), the largest European construction machinery producer. The result highlights that TQM is a natural foundation to build up Six-Sigma upon; and not surprisingly the quality yield in a TQM approach complemented by Six-sigma is far higher and more stable than when TQM with no Six-Sigma focus is being put in place; thus presenting the overall finding that TQM and Six Sigma are compliments, not substitutes. The study will be concluded with an overview on quality management approaches in the heavy duty manufacturing industry to highlight the way forward for the industry

    The routinisation of management controls in software.

    Get PDF
    Author's post-print version. Final version published by Springer; available online at http://link.springer.com/Our paper aims to explore management control as complex and intertwining process over time, rather than the (mainstream) fixation on rational, optimising tools for ensuring business success. We set out to contribute towards our understanding of why and how particular management controls evolve over time as they do. We discuss how the management control routines of one organisation emerged and reproduced (through software), and moved towards a situation of becoming accepted and generally unquestioned across much of the industry. The creativity and championing of one particular person was found to be especially important in this unfolding change process. Our case study illuminates how management control (software) routines can be an important carrier of organisational knowledge, both as an engine for continuity but also potentially as a catalyst for change. We capture this process by means of exploring the ‘life-story’ of a piece of software that is adopted in the corrugated container industry

    Determining Contingencies in the Management of Construction Projects

    Full text link
    [EN] This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers to meet project objectives but rarely share these buffers with the owner, unless the owner is an internal client.Ortiz-González, JI.; Pellicer, E.; Molenaar, KR. (2019). Determining Contingencies in the Management of Construction Projects. Project Management Journal. 50(2):226-242. https://doi.org/10.1177/8756972819827389S226242502Adafin, J., Wilkinson, S., Rotimi, J. O. B., & Odeyinka, H. (2014). Accuracy in Design Stage Cost Estimating through Risk-contingency Analysis: A Theoretical Exploration. Construction Research Congress 2014. doi:10.1061/9780784413517.151Ballard, G., & Howell, G. (1998). Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, 124(1), 11-17. doi:10.1061/(asce)0733-9364(1998)124:1(11)Barraza, G. A. (2011). Probabilistic Estimation and Allocation of Project Time Contingency. Journal of Construction Engineering and Management, 137(4), 259-265. doi:10.1061/(asce)co.1943-7862.0000280Blomquist, T., Hällgren, M., Nilsson, A., & Söderholm, A. (2010). Project-as-Practice: In Search of Project Management Research that Matters. Project Management Journal, 41(1), 5-16. doi:10.1002/pmj.20141Chan, E. H., & Au, M. C. (2009). Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders. Journal of Construction Engineering and Management, 135(3), 135-145. doi:10.1061/(asce)0733-9364(2009)135:3(135)De la Cruz, M. P., del Caño, A., & de la Cruz, E. (2006). Downside Risks in Construction Projects Developed by the Civil Service: The Case of Spain. Journal of Construction Engineering and Management, 132(8), 844-852. doi:10.1061/(asce)0733-9364(2006)132:8(844)Ford, D. N. (2002). Achieving Multiple Project Objectives through Contingency Management. Journal of Construction Engineering and Management, 128(1), 30-39. doi:10.1061/(asce)0733-9364(2002)128:1(30)González, V., Alarcón, L. F., & Molenaar, K. (2009). Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects. Automation in Construction, 18(2), 95-108. doi:10.1016/j.autcon.2008.05.005Guest, G., Bunce, A., & Johnson, L. (2006). How Many Interviews Are Enough? Field Methods, 18(1), 59-82. doi:10.1177/1525822x05279903Günhan, S., & Arditi, D. (2007). Budgeting Owner’s Construction Contingency. Journal of Construction Engineering and Management, 133(7), 492-497. doi:10.1061/(asce)0733-9364(2007)133:7(492)Hällgren, M., & Wilson, T. L. (2008). The nature and management of crises in construction projects: Projects-as-practice observations. International Journal of Project Management, 26(8), 830-838. doi:10.1016/j.ijproman.2007.10.005Harbuck R. H. (2004). Competitive bidding for highway construction projects (pp. ES91–ES94). Morgantown, WV: AACE International Transactions.HORMAN, M., & KENLEY, R. (1998). Process Dynamics: Identifying a Strategy for the Deployment of Buffers in Building Projects. International Journal of Logistics Research and Applications, 1(3), 221-237. doi:10.1080/13675569808962049Horman, M. J., & Thomas, H. R. (2005). Role of Inventory Buffers in Construction Labor Performance. Journal of Construction Engineering and Management, 131(7), 834-843. doi:10.1061/(asce)0733-9364(2005)131:7(834)Howell, G., Laufer, A., & Ballard, G. (1993). Interaction between Subcycles: One Key to Improved Methods. Journal of Construction Engineering and Management, 119(4), 714-728. doi:10.1061/(asce)0733-9364(1993)119:4(714)Howell, G., Laufer, A., & Ballard, G. (1993). Uncertainty and project objectives. Project Appraisal, 8(1), 37-43. doi:10.1080/02688867.1993.9726884Idrus, A., Fadhil Nuruddin, M., & Rohman, M. A. (2011). Development of project cost contingency estimation model using risk analysis and fuzzy expert system. Expert Systems with Applications, 38(3), 1501-1508. doi:10.1016/j.eswa.2010.07.061Laryea, S., & Hughes, W. (2011). Risk and Price in the Bidding Process of Contractors. Journal of Construction Engineering and Management, 137(4), 248-258. doi:10.1061/(asce)co.1943-7862.0000293Leach, L. (2003). Schedule and Cost Buffer Sizing: How to Account for the Bias between Project Performance and Your Model. Project Management Journal, 34(2), 34-47. doi:10.1177/875697280303400205Lee, S., Peña-Mora, F., & Park, M. (2006). Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects. Journal of Construction Engineering and Management, 132(5), 452-464. doi:10.1061/(asce)0733-9364(2006)132:5(452)Oviedo-Haito, R. J., Jiménez, J., Cardoso, F. F., & Pellicer, E. (2014). Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(3), 04013056. doi:10.1061/(asce)co.1943-7862.0000811Pellicer, E., Sanz, M. A., Esmaeili, B., & Molenaar, K. R. (2016). Exploration of Team Integration in Spanish Multifamily Residential Building Construction. Journal of Management in Engineering, 32(5), 05016012. doi:10.1061/(asce)me.1943-5479.0000438Pellicer, E., & Victory, R. (2006). IMPLEMENTATION OF PROJECT MANAGEMENT PRINCIPLES IN SPANISH RESIDENTIAL DEVELOPMENTS. International Journal of Strategic Property Management, 10(4), 233-248. doi:10.3846/1648715x.2006.9637555Rooke, J., Seymour, D., & Fellows, R. (2004). Planning for claims: an ethnography of industry culture. Construction Management and Economics, 22(6), 655-662. doi:10.1080/014461904200026324Slauson N. P. (2005). The effectiveness of the construction contract (pp. PM121–PM127). Morgantown, WV: AACE International Transactions.Tah, J. H. M., Thorpe, A., & McCaffer, R. (1993). Contractor project risks contingency allocation using linguistic approximation. Computing Systems in Engineering, 4(2-3), 281-293. doi:10.1016/0956-0521(93)90052-xTaylor, J. E., Dossick, C. S., & Garvin, M. (2011). Meeting the Burden of Proof with Case-Study Research. Journal of Construction Engineering and Management, 137(4), 303-311. doi:10.1061/(asce)co.1943-7862.0000283Thal, A. E., Cook, J. J., & White, E. D. (2010). Estimation of Cost Contingency for Air Force Construction Projects. Journal of Construction Engineering and Management, 136(11), 1181-1188. doi:10.1061/(asce)co.1943-7862.0000227Thamhain, H. (2013). Managing Risks in Complex Projects. Project Management Journal, 44(2), 20-35. doi:10.1002/pmj.21325Yeo, K. T. (1990). Risks, Classification of Estimates, and Contingency Management. Journal of Management in Engineering, 6(4), 458-470. doi:10.1061/(asce)9742-597x(1990)6:4(458

    Assembly line performance and modeling

    Get PDF
    Automobile sector forms the backbone of manufacturing sector. Vehicle assembly line is important section in automobile plant where repetitive tasks are performed one after another at different workstations. In this thesis, a methodology is proposed to reduce cycle time and time loss due to important factors like equipment failure, shortage of inventory, absenteeism, set-up, material handling, rejection and fatigue to improve output within given cost constraints. Various relationships between these factors, corresponding cost and output are established by scientific approach. This methodology is validated in three different vehicle assembly plants. Proposed methodology may help practitioners to optimize the assembly line using lean techniques
    corecore