319 research outputs found

    Re-scheduling in railways: the rolling stock balancing problem

    Get PDF
    This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does not fit to the allocation before and after the planning period. The problem is then to correct these off-balances, leading to a modified schedule that can be implemented in practice.For practical usage of solution approaches for the RSBP, it is important to solve the problem quickly. Therefore, the focus is on heuristic approaches. In this paper, we describe two heuristics and compare them with each other on some (variants of) real-life instances of NS, the main Dutch passenger railway operator. Finally, to get some insight in the quality of the proposed heuristics, we also compare their outcomes with optimal solutions obtained by solving existing rolling stock circulation models.heuristics;railway planning;integer linear programming;rolling stock re-scheduling

    Scheduling preventive railway maintenance activities

    Get PDF
    A railway system needs a substantial amount of maintenance. To prevent unexpected breakdowns as much as possible, preventive maintenance is required. In this paper we discuss the Preventive Maintenance Scheduling Problem (PMSP), where (short) routine activities and (long) unique projects have to be scheduled in a certain period. To reduce costs and inconvenience for the travellers and operators, these activities have to be scheduled as much as possible together. We present a mathematical formulation for this problem and some greedy heuristics to solve it fast. Moreover, we compare the performance of these heuristics with the optimal solution using some randomly generated instances

    Repair of Failing Spirit Lake Outlet Tunnel at Mount St. Helens

    Get PDF
    The 18 May 1980 eruption of Mount St. Helens resulted in one of the largest debris avalanches recorded in history. The debris avalanche blocked the natural outlet of Spirit Lake. To prevent an uncontrolled and catastrophic lake break-out, the U.S. Army Corps of Engineers (USACE) constructed the Spirit Lake Outlet Tunnel from 1984 to 1985. Because Spirit Lake is located in the Mount St. Helens National Volcanic Monument, the project was transferred to the U.S. Forest Service (USFS) for ownership and management. During original tunnel construction, the most difficulty occurred within the 90-m-wide Julie and Kathy L. shear zone complex. In 1996, tunnel walls within this complex experienced significant convergence, which required major repair along a 30 m segment. During inspections in 2014 and 2015, a 10 m segment at the upstream end of the complex, which had experienced slow heave in the past, was observed to have experienced an increase in heave of approximately 0.6 m, which decreased the hydraulic capacity of the tunnel below acceptable limits. The USACE, in accordance with and with funding from the USFS, designed a repair based on the rib set-shotcrete support system that was used for the 1996 repair. In addition to removing and arresting the heave, the 2015 repair was sized to be compatible with a future potential rehabilitation involving stabilizing and re-grading the invert profile of the Julie and Kathy L. shear zone complex. The 2015 repair construction contract was awarded in September 2015 for $3 million

    Similarities and differences in the dolomitization history of two coeval Middle Triassic carbonate platforms, Balaton Highland, Hungary

    Get PDF
    Dolomitization of platform carbonates is commonly the result of multiphase processes. Documentation of the complex dolomitization history is difficult if completely dolomitized sections are studied. Two Middle Anisian sections representing two coeval carbonate platforms were investigated and compared in the present study. Both sections are made up of meter-scale peritidal–lagoonal cycles with significant pedogenic overprint. One of the sections contains non-dolomitized, partially dolomitized, and completely dolomitized intervals, whereas the other is completely dolomitized. Based on investigations of the partially dolomitized section, penecontemporaneous dolomite formation and/or very early post-depositional dolomitization were identified in various lithofacies types. In shallow subtidal facies, porphyrotopic dolomite was found preferentially in microbial micritic fabrics. Microbially induced dolomite precipitation and/or progressive replacement of carbonate sediments could be interpreted for stromatolites. Cryptocrystalline to very finely crystalline dolomite, probably of pedogenic origin, was encountered in paleosoil horizons. Fabric-destructive dolomite commonly found below these horizons was likely formed via reflux of evaporated seawater. As a result of the different paleogeographic settings of the two platforms, their shallow-burial conditions were significantly different. One of the studied sections was located at the basinward platform margin where pervasive fabric-retentive dolomitization took place in a shallow-burial setting, probably via thermal convection. In contrast, in the area of the other, smaller platform shallow-water carbonates were covered by basinal deposits, preventing fluid circulation and accordingly pervasive shallow-burial dolomitization. In the intermediate to deep burial zone, recrystallization of partially dolomitized limestone and occlusion of newly opened fractures and pores by coarsely crystalline dolomite took place

    Through-thickness superconducting and normal-state transport properties revealed by thinning of thick film ex situ YBa2Cu3O7-x coated conductors

    Full text link
    A rapid decrease in the critical current density (Jc) of YBa2Cu3O7-x (YBCO) films with increasing film thickness has been observed for multiple YBCO growth processes. While such behavior is predicted from 2D collective pinning models under certain assumptions, empirical observations of the thickness dependence of Jc are believed to be largely processing dependent at present. To investigate this behavior in ex situ YBCO films, 2.0 and 2.9 um thick YBCO films on ion beam assisted deposition (IBAD) - yttria stabilized zirconia (YSZ) substrates were thinned and repeatedly measured for rho(T) and Jc(H). The 2.9 um film exhibited a constant Jc(77K,SF) through thickness of ~1 MA/cm2 while the 2.0 um film exhibited an increase in Jc(77K,SF) as it was thinned. Neither film offered evidence of significant dead layers, suggesting that further increases in critical current can be obtained by growing thicker YBCO layers.Comment: To appear in Applied Physics Letter

    Spatially Resolved Mapping of Local Polarization Dynamics in an Ergodic Phase of Ferroelectric Relaxor

    Full text link
    Spatial variability of polarization relaxation kinetics in relaxor ferroelectric 0.9Pb(Mg1/3Nb2/3)O3-0.1PbTiO3 is studied using time-resolved Piezoresponse Force Microscopy. Local relaxation attributed to the reorientation of polar nanoregions is shown to follow stretched exponential dependence, exp(-(t/tau)^beta), with beta~~0.4, much larger than the macroscopic value determined from dielectric spectra (beta~~0.09). The spatial inhomogeneity of relaxation time distributions with the presence of 100-200 nm "fast" and "slow" regions is observed. The results are analyzed to map the Vogel-Fulcher temperatures on the nanoscale.Comment: 23 pages, 4 figures, supplementary materials attached; to be submitted to Phys. Rev. Let

    Re-scheduling in railways: the rolling stock balancing problem

    Get PDF
    This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does not fit to the allocation before and after the planning period. The problem is then to correct these off-balances, leading to a modified schedule that can be implemented in practice. For practical usage of solution approaches for the RSBP, it is important to solve the problem quickly. Therefore, the focus is on heuristic approaches. In this paper, we describe two heuristics and compare them with each other on some (variants of) real-life instances of NS, the main Dutch passenger railway operator. Finally, to get some insight in the quality of the proposed heuristics, we also compare their outcomes with optimal solutions obtained by solving existing rolling stock circulation models

    Optical and structural properties of ZnO films deposited on GaAs by pulsed laser deposition

    Get PDF
    doi:10.1063/1.373643ZnO films were synthesized on GaAs substrates at different growth conditions by pulse laser deposition. High-purity (99.999%) oxygen was used as the ambient gas. The pressure of the ambient oxygen gas for ZnO film growth was varied from 20 to 50 mTorr, and the growth temperature from 300 to 450 °C. ZnO films showed very strong bound exciton peaks located between 3.37 and 3.35 eV. The full width at half maximum of the bound exciton peak is less than 5 meV. These results indicate ZnO films on GaAs substrates can be used for optical devices such as light-emitting diodes. The other significant properties of textured ZnO films on GaAs substrates are described.This work was supported in part by University of Missouri Research Board under Grant No. RB95-061, the U.S. Army Research Office ~Research Triangle Park, N.C.! under Grant No. DAAH04-94-G-0305, and the Office of Naval Research-Electronics Division, Contract No. N00014-99-1-0288
    corecore