1,494 research outputs found

    Resilience in Pre-Columbian Caribbean House-Building: Dialogue Between Archaeology and Humanitarian Shelter.

    Get PDF
    This paper responds to questions posed by archaeologists and engineers in the humanitarian sector about relationships between shelter, disasters and resilience. Enabled by an increase in horizontal excavations combined with high-resolution settlement data from excavations in the Dominican Republic, the paper presents a synthesis of Caribbean house data spanning a millennium (1400 BP- 450 BP). An analysis of architectural traits identify the house as an institution that constitutes and catalyses change in an emergent and resilient pathway. The "Caribbean architectural mode" emerged in a period of demographic expansion and cultural transition, was geographically widespread, different from earlier and mainland traditions and endured the hazards of island and coastal ecologies. We use archaeological analysis at the house level to consider the historical, ecological and regional dimensions of resilience in humanitarian action.Thank you to the Museo del Hombre Dominicano for collaboration on the site of El Cabo, to the Netherlands Organisation for Scientific Research and the Faculty of Archaeology, Leiden University for supporting the archaeological research. Kate Crawford’s post-doctoral post at the Department of Civil, Environmental and Geomatic Engineering at University College London was funded by the Engineering and Physical Sciences Research Council.This is the final version of the article. It first appeared from Springer via http://dx.doi.org/10.1007/s10745-015-9741-

    The Effects of Previous Error and Success in Alzheimer’s Disease and Mild Cognitive Impairment

    Get PDF
    This work investigated in Alzheimer’s disease dementia (AD), whether the probability of making an error on a task (or a correct response) was influenced by the outcome of the previous trials. We used the antisaccade task (AST) as a model task given the emerging consensus that it provides a promising sensitive and early biological test of cognitive impairment in AD. It can be employed equally well in healthy young and old adults, and in clinical populations. This study examined eye-movements in a sample of 202 participants (42 with dementia due to AD; 65 with mild cognitive impairment (MCI); 95 control participants). The findings revealed an overall increase in the frequency of AST errors in AD and MCI compared to the control group, as predicted. The errors on the current trial increased in proportion to the number of consecutive errors on the previous trials. Interestingly, the probability of errors was reduced on the trials that followed a previously corrected error, compared to the trials where the error remained uncorrected, revealing a level of adaptive control in participants with MCI or AD dementia. There was an earlier peak in the AST distribution of the saccadic reaction times for the inhibitory errors in comparison to the correct saccades. These findings revealed that the inhibitory errors of the past have a negative effect on the future performance of healthy adults as well as people with a neurodegenerative cognitive impairment

    Prophylactic G-CSF in patients with early-stage breast cancer: a health economic review

    Get PDF
    Although the use of prophylactic granulocyte colony-stimulating factor (G-CSF) in conjunction with myelosuppressive chemotherapy is supported by clinical research evidence and advocated by international clinical guidelines when the consequent risk of febrile neutropenia exceeds 20%, there remains doubt as to the cost-effectiveness of the practice. There are limited economic data, and the data that are available are not necessarily applicable to the management of breast cancer in a European setting. Much of the available evidence on G-CSF in the management of febrile neutropenia is partial, focusing primarily on direct costs to the health service – that is, those related to hospitalisation and drug treatment. A full assessment of the cost effectiveness of G-CSF prophylaxis needs to take account of both costs and outcomes, including mortality, quality of life and patient functioning. As febrile neutropenia has been shown to affect productivity, consideration should also be given to quantifying the indirect costs of neutropenia

    XM02 is superior to placebo and equivalent to Neupogen™ in reducing the duration of severe neutropenia and the incidence of febrile neutropenia in cycle 1 in breast cancer patients receiving docetaxel/doxorubicin chemotherapy

    Get PDF
    Abstract Background Recombinant granulocyte colony-stimulating factors (G-CSFs) such as Filgrastim are used to treat chemotherapy-induced neutropenia. We investigated a new G-CSF, XM02, and compared it to Neupogen™ after myelotoxic chemotherapy in breast cancer (BC) patients. Methods A total of 348 patients with BC receiving docetaxel/doxorubicin chemotherapy were randomised to treatment with daily injections (subcutaneous 5 μg/kg/day) for at least 5 days and a maximum of 14 days in each cycle of XM02 (n = 140), Neupogen™ (n = 136) or placebo (n = 72). The primary endpoint was the duration of severe neutropenia (DSN) in cycle 1. Results The mean DSN in cycle 1 was 1.1, 1.1, and 3.9 days in the XM02, Neupogen™, and placebo group, respectively. Superiority of XM02 over placebo and equivalence of XM02 with Neupogen™ could be demonstrated. Toxicities were similar between XM02 and Neupogen™. Conclusion XM02 was superior to placebo and equivalent to Neupogen™ in reducing DSN after myelotoxic chemotherapy. Trial Registration Current Controlled Trials ISRCTN02270769</p

    Guidelines for the deployment and implementation of manufacturing scheduling systems

    Full text link
    It has frequently been stated that there exists a gap between production scheduling theory and practice. In order to put theoretical findings into practice, advances in scheduling models and solution procedures should be embedded into a piece of software - a scheduling system - in companies. This results in a process that entails (1) determining its functional features, and (2) adopting a successful strategy for its development and deployment. In this paper we address the latter question and review the related literature in order to identify descriptions and recommendations of the main aspects to be taken into account when developing such systems. These issues are then discussed and classified, resulting in a set of guidelines that can help practitioners during the process of developing and deploying a scheduling system. In addition, identification of these issues can provide some insights to drive theoretical scheduling research towards those topics more in demand by practitioners, and thus help to close the aforementioned gap.Framiñan Torres, JM.; Ruiz García, R. (2012). Guidelines for the deployment and implementation of manufacturing scheduling systems. International Journal of Production Research. 50(7):1799-1812. doi:10.1080/00207543.2011.564670S17991812507Baek, D. H. (1999). A visualized human-computer interactive approach to job shop scheduling. International Journal of Computer Integrated Manufacturing, 12(1), 75-83. doi:10.1080/095119299130489Comesaña Benavides, J. A., & Carlos Prado, J. (2002). Creating an expert system for detailed scheduling. International Journal of Operations & Production Management, 22(7), 806-819. doi:10.1108/01443570210433562Bensana, E. 1986. An expert-system approach to industrial job-shop scheduling. In: Proceedings of the 1986 IEEE international conference on robotics and automation. 1986. Vol. 3, pp.1645–1650.Berglund, M., & Karltun, J. (2007). Human, technological and organizational aspects influencing the production scheduling process. International Journal of Production Economics, 110(1-2), 160-174. doi:10.1016/j.ijpe.2007.02.024Besbes, W., Teghem, J., & Loukil, T. (2010). Scheduling hybrid flow shop problem with non-fixed availability constraints. European J. of Industrial Engineering, 4(4), 413. doi:10.1504/ejie.2010.035652Bhattacharyya, S., & Koehler, G. J. (1998). Learning by Objectives for Adaptive Shop-Floor Scheduling. Decision Sciences, 29(2), 347-375. doi:10.1111/j.1540-5915.1998.tb01580.xBitran, G. R., & Tirupati, D. (1988). OR Practice—Development and Implementation of a Scheduling System for a Wafer Fabrication Facility. Operations Research, 36(3), 377-395. doi:10.1287/opre.36.3.377Buxey, G. (1989). Production scheduling: Practice and theory. European Journal of Operational Research, 39(1), 17-31. doi:10.1016/0377-2217(89)90349-4Chen, J.-F. (2004). Unrelated parallel machine scheduling with secondary resource constraints. The International Journal of Advanced Manufacturing Technology, 26(3), 285-292. doi:10.1007/s00170-003-1622-1Collinot, A., Le Pape, C., & Pinoteau, G. (1988). SONIA: A knowledge-based scheduling system. Artificial Intelligence in Engineering, 3(2), 86-94. doi:10.1016/0954-1810(88)90024-6Cowling, P. (2003). A flexible decision support system for steel hot rolling mill scheduling. Computers & Industrial Engineering, 45(2), 307-321. doi:10.1016/s0360-8352(03)00038-xDudek, R. A., Panwalkar, S. S., & Smith, M. L. (1992). The Lessons of Flowshop Scheduling Research. Operations Research, 40(1), 7-13. doi:10.1287/opre.40.1.7Dumond, E. J. (2005). Understanding and using the capabilities of finite scheduling. Industrial Management & Data Systems, 105(4), 506-526. doi:10.1108/02635570510592398Fox, M. S., & Smith, S. F. (1984). ISIS?a knowledge-based system for factory scheduling. Expert Systems, 1(1), 25-49. doi:10.1111/j.1468-0394.1984.tb00424.xFraminan, J. M., & Ruiz, R. (2010). Architecture of manufacturing scheduling systems: Literature review and an integrated proposal. European Journal of Operational Research, 205(2), 237-246. doi:10.1016/j.ejor.2009.09.026Freed, T., Doerr, K. H., & Chang, T. (2007). In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations. International Journal of Production Research, 45(21), 5075-5093. doi:10.1080/00207540600818351Gao, C and Tang, L. 2008. A decision support system for color-coating line in steel industry. In: Proceedings of the IEEE international conference on automation and logistics, ICAL 2008. 2008. pp.1463–1468.Grant, T. J. (1986). Lessons for O.R. from A.I.: A Scheduling Case Study. Journal of the Operational Research Society, 37(1), 41-57. doi:10.1057/jors.1986.7Graves, S. C. (1981). A Review of Production Scheduling. Operations Research, 29(4), 646-675. doi:10.1287/opre.29.4.646HALSALL, D. N., MUHLEMANN, A. P., & PRICE, D. H. R. (1994). A review of production planning and scheduling in smaller manufacturing companies in the UK. Production Planning & Control, 5(5), 485-493. doi:10.1080/09537289408919520Higgins, P. G. (1996). Interaction in hybrid intelligent scheduling. International Journal of Human Factors in Manufacturing, 6(3), 185-203. doi:10.1002/(sici)1522-7111(199622)6:33.0.co;2-6Kanet, J. J., & Adelsberger, H. H. (1987). Expert systems in production scheduling. European Journal of Operational Research, 29(1), 51-59. doi:10.1016/0377-2217(87)90192-5Kathawala, Y., & Allen, W. R. (1993). Expert Systems and Job Shop Scheduling. International Journal of Operations & Production Management, 13(2), 23-35. doi:10.1108/01443579310025286Kerr, R. M. (1992). Expert systems in production scheduling: Lessons from a failed implementation. Journal of Systems and Software, 19(2), 123-130. doi:10.1016/0164-1212(92)90063-pKnolmayer, G., Mertens, P., & Zeier, A. (2002). Supply Chain Management Based on SAP Systems. doi:10.1007/978-3-540-24816-3Leachman, R. C., Benson, R. F., Liu, C., & Raar, D. J. (1996). IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation—Semiconductor Sector. Interfaces, 26(1), 6-37. doi:10.1287/inte.26.1.6MACCARTHY, B. L., & LIU, J. (1993). Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59-79. doi:10.1080/00207549308956713McKay, K. N., & Black, G. W. (2007). The evolution of a production planning system: A 10-year case study. Computers in Industry, 58(8-9), 756-771. doi:10.1016/j.compind.2007.02.002McKay, K. N., Safayeni, F. R., & Buzacott, J. A. (1988). Job-Shop Scheduling Theory: What Is Relevant? Interfaces, 18(4), 84-90. doi:10.1287/inte.18.4.84McKay, K. N., Morton, T. E., Ramnath, P., & Wang, J. (2000). ?Aversion dynamics? scheduling when the system changes. Journal of Scheduling, 3(2), 71-88. doi:10.1002/(sici)1099-1425(200003/04)3:23.0.co;2-0MCKAY, K., PINEDO, M., & WEBSTER, S. (2009). PRACTICE-FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS*. Production and Operations Management, 11(2), 249-258. doi:10.1111/j.1937-5956.2002.tb00494.xMissbauer, H., Hauber, W., & Stadler, W. (2009). A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry. International Journal of Production Research, 47(15), 4147-4172. doi:10.1080/00207540801950136Numao, M and Morishita, S. 1989. A scheduling environment for steel-making processes. In: Proceedings of the 5th conference on artificial intelligence applications. 1989. pp.279–286.Olhager, J., & Rapp, B. (1995). Operations Research Techniques in Manufacturing Planning and Control Systems. International Transactions in Operational Research, 2(1), 29-43. doi:10.1111/j.1475-3995.1995.tb00003.xPerez-Gonzalez, P., & Framinan, J. M. (2009). Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics. Computers & Operations Research, 36(10), 2866-2876. doi:10.1016/j.cor.2008.12.018Pinedo, M., & Yen, B. P.-C. (1997). Annals of Operations Research, 70, 359-378. doi:10.1023/a:1018986524234Portougal, V., & Robb, D. J. (2000). Production Scheduling Theory: Just Where Is It Applicable? Interfaces, 30(6), 64-76. doi:10.1287/inte.30.6.64.11623Reisman, A., Kumar, A., & Motwani, J. (1997). Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994. IEEE Transactions on Engineering Management, 44(3), 316-329. doi:10.1109/17.618173Steffen, MS. 1986. A survey of artificial intelligence-based scheduling systems. In: Proceedings of the fall industrial engineering conference. 1986.Storer, R. H., Wu, S. D., & Vaccari, R. (1992). New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling. Management Science, 38(10), 1495-1509. doi:10.1287/mnsc.38.10.1495Tang, L., & Wang, G. (2008). Decision support system for the batching problems of steelmaking and continuous-casting production. Omega, 36(6), 976-991. doi:10.1016/j.omega.2007.11.002T’kindt, V., Billaut, J.-C., Bouquard, J.-L., Lenté, C., Martineau, P., Néron, E., … Tacquard, C. (2005). The e-OCEA project: towards an Internet decision system for scheduling problems. Decision Support Systems, 40(2), 329-337. doi:10.1016/j.dss.2004.04.001Wiers, VCS. 1997. Human–computer interaction in production scheduling: Analysis and design of decision support systems for production scheduling tasks. Ph.D. Thesis, Technische Universiteit Eindhoven, NetherlandsWiers, V. C. S. (2002). A case study on the integration of APS and ERP in a steel processing plant. Production Planning & Control, 13(6), 552-560. doi:10.1080/09537280210160321Wiers, V. C. S., & Van Der Schaaf, T. W. (1997). A framework for decision support in production scheduling tasks. Production Planning & Control, 8(6), 533-544. doi:10.1080/095372897234876Zhang, L., Krishnamurthy, A., Malmborg, C. J., & Heragu, S. S. (2009). Variance-based approximations of transaction waiting times in autonomous vehicle storage and retrieval systems. European J. of Industrial Engineering, 3(2), 146. doi:10.1504/ejie.2009.02360

    Associations between fruit and vegetable intake, leisure-time physical activity, sitting time and self-rated health among older adults : cross-sectional data from the WELL study

    Get PDF
    BackgroundLifestyle behaviours, such as healthy diet, physical activity and sedentary behaviour, are key elements of healthy ageing and important modifiable risk factors in the prevention of chronic diseases. Little is known about the relationship between these behaviours in older adults. The purpose of this study was to explore the relationship between fruit and vegetable (F&amp;V) intake, leisure-time physical activity (LTPA) and sitting time (ST), and their association with self-rated health in older adults.MethodsThis cross-sectional study comprised 3,644 older adults (48% men) aged 55-65 years, who participated in the Wellbeing, Eating and Exercise for a Long Life (&quot;WELL&quot;) study. Respondents completed a postal survey about their health and their eating and physical activity behaviours in 2010 (38% response rate). Spearman\u27s coefficient (rho) was used to evaluate the relationship between F&amp;V intake, LTPA and ST. Their individual and shared associations with self-rated health were examined using ordinal logistic regression models, stratified by sex and adjusted for confounders (BMI, smoking, long-term illness and socio-demographic characteristics).ResultsThe correlations between F&amp;V intake, LTPA and ST were low. F&amp;V intake and LTPA were positively associated with self-rated health. Each additional serving of F&amp;V or MET-hour of LTPA were associated with approximately 10% higher likelihood of reporting health as good or better among women and men. The association between ST and self-rated health was not significant in the multivariate analysis. A significant interaction was found (ST*F&amp;V intake). The effect of F&amp;V intake on self-rated health increased with increasing ST in women, whereas the effect decreased with increasing ST in men.ConclusionThis study contributes to the scarce literature related to lifestyle behaviours and their association with health indicators among older adults. The findings suggest that a modest increase in F&amp;V intake, or LTPA could have a marked effect on the health of older adults. Further research is needed to fully understand the correlates and determinants of lifestyle behaviours, particularly sitting time, in this age group

    Electrophysiological Properties of Motor Neurons in a Mouse Model of Severe Spinal Muscular Atrophy: In Vitro versus In Vivo Development

    Get PDF
    We examined the electrophysiological activity of motor neurons from the mouse model of severe spinal muscular atrophy (SMA) using two different methods: whole cell patch clamp of neurons cultured from day 13 embryos; and multi-electrode recording of ventral horns in spinal cord slices from pups on post-natal days 5 and 6. We used the MED64 multi-electrode array to record electrophysiological activity from motor neurons in slices from the lumbar spinal cord of SMA pups and their unaffected littermates. Recording simultaneously from up to 32 sites across the ventral horn, we observed a significant decrease in the number of active neurons in 5–6 day-old SMA pups compared to littermates. Ventral horn activity in control pups is significantly activated by serotonin and depressed by GABA, while these agents had much less effect on SMA slices. In contrast to the large differences observed in spinal cord, neurons cultured from SMA embryos for up to 21 days showed no significant differences in electrophysiological activity compared to littermates. No differences were observed in membrane potential, frequency of spiking and synaptic activity in cells from SMA embryos compared to controls. In addition, we observed no difference in cell survival between cells from SMA embryos and their unaffected littermates. Our results represent the first report on the electrophysiology of SMN-deficient motor neurons, and suggest that motor neuron development in vitro follows a different path than in vivo development, a path in which loss of SMN expression has little effect on motor neuron function and survival

    Psychological and physical correlates of musculoskeletal symptoms in male professional divers and offshore workers

    Get PDF
    Background: Underwater divers are more likely to complain of musculoskeletal symptoms than a control population. Accordingly, we conducted a study to determine whether musculoskeletal symptoms reflected observable physical disorder, to ascertain the relationship between symptoms and measures of mood, memory and executive function and to assess any need for future screening. Methods: A 10% random sample of responders to a prior postal health questionnaire was examined (151 divers, 120 non-diving offshore workers). Participants underwent physical examination and a neuropsychological test battery for memory and executive function. Participants also completed the Hospital Anxiety and Depression Scale for anxiety (HADSa) and depression (HADSd), and questionnaires for physical health-related quality of life (SF36 PCS), mental health-related quality of life (SF36 MCS), memory (Cognitive Failures Questionnaire (CFQ), Prospective and Retrospective Memory Questionnaire (PRMQ)), executive function (dysexecutive syndrome questionnaire (DEX)), musculoskeletal symptoms (MSS) and general unrelated symptom reporting. Results: Of participants with moderate/severe musculoskeletal symptoms, 52% had physical signs, and of participants with no symptoms, 73% had no physical signs. There was no difference in the prevalence of signs or symptoms between groups. Musculoskeletal symptoms were associated with lower SF36 PCS for both groups. In divers, musculoskeletal symptoms were associated with higher general unrelated symptom reporting and poorer scoring for HADSa, PRMQ, CFQ and DEX with scores remaining within the normative range. A positive physical examination was associated with general unrelated symptom reporting in divers. There were no differences in neuropsychological test scores attributable to either group or musculoskeletal symptoms. Conclusions: Musculoskeletal symptoms were associated with physical signs, but this was not a strong effect. Reporting of musculoskeletal symptoms by the divers studied was also associated with a tendency to report symptoms generally or somatisation, and caution should be exercised regarding their interpretation as an indication of physical disease or their use for health screening

    Staging quality is related to the survival of women with endometrial cancer: a Scottish population based study.Deficient surgical staging and omission of adjuvant radiotherapy is associated with poorer survival of women diagnosed with endometrial cancer in Scotland during 1996 and 1997

    Get PDF
    The association between treatment variation and survival of women with endometrial cancer was investigated. A retrospective cohort based upon the complete Scottish population registered on in-patient and day-case hospital discharge data (Scottish Morbidity Record-1) and cancer registration (Scottish Morbidity Record-6) coded C54 and C55 in ICD10, between 1st January 1996 to 31st December 1997 were analysed. Seven hundred and three patients who underwent surgical treatment out of 781 patients that were diagnosed with endometrial cancer in Scotland during 1996 and 1997. The overall quality of surgical staging was poor. The quality of staging was related to both the year that the surgeon passed the Member of the Royal College of Obstetricians and Gynaecologists examination and also to ‘specialist’ status but was not related to surgeon caseload. Two clinically important prognostic factors were found to be associated with survival; whether the International Federation of Obstetrics and Gynaecology stage was documented, RHR=2.0 (95% CI=1.3 to 3.1) and also to the use of adjuvant radiotherapy, RHR=2.2 (95% CI=1.5 to 3.5). The associations with survival were strongest in patients with advanced disease, International Federation of Obstetrics and Gynaecology stages 1C through to stage 3. Deficiencies in staging and variations in the use of adjuvant radiotherapy represent a possible source of avoidable mortality in patients with endometrial cancer. Consequently, there should be a greater emphasis on improving the overall quality of surgical staging in endometrial cancer
    corecore