76 research outputs found

    The LHC Beam Loss Monitoring System's Surface Building Installation

    Get PDF
    The strategy for machine protection and quench prevention of the Large Hadron Collider (LHC) at the European Organisation for Nuclear Research (CERN) is mainly based on the Beam Loss Monitoring (BLM) system. At each turn, there will be several thousands of data to record and process in order to decide if the beams should be permitted to continue circulating or their safe extraction is necessary. The BLM system can be sub-divided geographically to the tunnel and the surface building installations. In this paper the surface installation is explored, focusing not only to the parts used for the processing of the BLM data and the generation of the beam abort triggers, but also to the interconnections made with various other systems in order to provide the needed functionality

    An FPGA Based Implementation for Real-Time Processing of the LHC Beam Loss Monitoring System's Data

    Get PDF
    The strategy for machine protection and quench prevention of the Large Hadron Collider (LHC) at the European Organisation for Nuclear Research (CERN) is mainly based on the Beam Loss Monitoring (BLM) system. At each turn, there will be several thousands of data to record and process in order to decide if the beams should be permitted to continue circulating or their safe extraction is necessary to be triggered. The processing involves a proper analysis of the loss pattern in time and for the decision the energy of the beam needs to be accounted. This complexity needs to be minimized by all means to maximize the reliability of the BLM system and allow a feasible implementation. In this paper, a field programmable gate array (FPGA) based implementation is explored for the real-time processing of the LHC BLM data. It gives emphasis on the highly efficient Successive Running Sums (SRS) technique used that allows many and long integration periods to be maintained for each detector's data with relatively small length shift registers that can be built around the embedded memory blocks

    Single Gain Radiation Tolerant LHC Beam Loss Acquisition Card

    Get PDF
    The beam loss monitoring system is one of the most critical elements for the protection of the LHC. It must prevent the super conducting magnets from quenches and the machine components from damages, caused by beam losses. Ionization chambers and secondary emission based detectors are used at several locations around the ring. The sensors are producing a signal current, which is related to the losses. This current will be measured by a tunnel card, which acquires, digitizes and transmits the data via an optical link to the surface electronic. The usage of the system, for protection and tuning of the LHC and the scale of the LHC, imposed exceptional specifications of the dynamic range and radiation tolerance. The input dynamic allows measurements between 10pA and 1mA and its protected to high pulse of 1.5kV and its corresponding current. To cover this range, a current to frequency converter in combination with an ADC is used. The integrator output voltage is measured with an ADC to improve the resolution. The radiation tolerance required the adaption of conceptional design and a stringent selection of the components

    Functional and Linearity test system for the LHC Beam Loss Monitoring data acquisition card

    Get PDF
    In the frame of the design and development of the beam loss monitoring (BLM) system for the Large Hadron Collider (LHC) a flexible test system has been developed to qualify and verify during design and production the BLM LHC data acquisition card. It permits to test completely the functionalities of the board as well as realizing analog input signal generation to the acquisition card. The system utilize two optical receivers, a Field Programmable Gate Array (FPGA), eights flexible current sources and a Universal Serial Bus (USB) to link it to a PC where a software written in LabWindows/CVI© (National Instruments) runs. It includes an important part of the measurement processing developed for the BLM in the future LHC accelerator. It is called Beam Loss Electronic Current to Frequency Tester (BLECFT)

    The LHC beam loss monitoring system's data acquisition card

    Get PDF
    The beam loss monitoring (BLM) system [1] of the LHC is one of the most critical elements for the protection of the LHC. It must prevent the super conducting magnets from quenches and the machine components from damages, caused by beam losses. Ionization chambers and secondary emission based beam loss detectors are used on several locations around the ring. The sensors are producing a signal current, which is related to the losses. This current will be measured by a tunnel electronic, which acquires, digitizes and transmits the data via an optical link to the surface electronic. The so called threshold comparator (TC) [2] collects, analyzes and compares the data with threshold table. It also gives a dump signal through the combiner card to the beam inter lock system (BIC). The usage of the system, for protection and tuning of the LHC and the scale of the LHC, imposed exceptional specification of the dynamic range and radiation tolerance. The input current dynamic range should allow measurements between 10pA and 1mA and it should also be protected to very high pulse of 1.5kV and its corresponding current. To cover this range, a current to frequency converter (CFC) is used in the tunnel card, which produces an output frequency of 0.05Hz at 10pA, and 5MHz at 1mA. In addition to the output frequency, the integrator output voltage is measured with a 12bit ADC to improve the resolution. The location of the CFC card next to the detector imposes the placement of the card in the LHC tunnel, exposing the card to radiation. The radiation tolerance was defined by assuming a 20 year operation period corresponding to 400Gy. A mixture of radiation tolerant Asics from the microelectronic group at CERN, and standard component was chosen to cope with these requirements

    LHC Beam Loss Detector Design: Simulations and Measurements

    Get PDF
    The Beam Loss Monitoring (BLM) system is integrated in the active equipment protection system of the LHC. It determines the number of particles lost from the primary hadron beam by measuring the radiation field of the shower particles outside of the vacuum chamber. The LHC BLM system will use ionization chambers as its standard detectors but in the areas where very high dose rates are expected, the Secondary Emission Monitor (SEM) chambers will be additionally employed because of their high linearity, low sensitivity and fast response.The sensitivity of the SEM was modeled in Geant4 via the Photo-Absorption Ionization module together with custom parameterization of the very low energy secondary electron production. The prototypes were calibrated by proton beams. For the calibration of the BLM system the signal response of the ionization chamber is simulated in Geant4 for all relevant particle types and energies (keV to TeV range). The results are validated by comparing the simulations to measurements using protons, neutrons, photons and mixed radiation fields at various energies and intensities

    Operational Experience with a LHC Collimator Prototype in the CERN SPS

    Get PDF
    A full-scale prototype of the Large Hadron Collider (LHC) collimator was installed in 2004 in the CERN Super Proton Synchrotron (SPS) and has been extensively used for beam tests, for control tests and also LHC simulation benchmarking during four years of operation. This operational experience has been extremely valuable in view of the final LHC implementation as well as for estimating the LHC operational scenarios, most notably to establish procedures for the beam-based alignment of the collimators with respect to the circulating beam. These studies were made possible by installing in the SPS a first prototype of the LHC beam loss monitoring system. The operational experience gained at the SPS and the lessons learnt for the LHC operation are presented

    The LHC Beam Loss Measurement System

    Get PDF
    An unprecedented amount of energy will be stored in the circulating beams of LHC. The loss of even a very small fraction of a beam may induce a quench in the superconducting magnets or cause physical damage to machine components. A fast (one turn) loss of 3 . 10-9 and a constant loss of 3 . 10-12 times the nominal beam intensity can quench a dipole magnet. A fast loss of 3 . 10-6 times nominal beam intensity can damage a magnet. The stored energy in the LHC beam is a factor of 200 (or more) higher than in existing hadron machines with superconducting magnets (HERA, TEVATRON, RHIC), while the quench levels of the LHC magnets are a factor of about 5 to 20 lower than the quench levels of these machines. To comply with these requirements the detectors, ionisation chambers and secondary emission monitors are designed very reliable with a large operational range. Several stages of the acquisition chain are doubled and frequent functionality tests are automatically executed. The failure probabilities of single components were identified and optimised. First measurements show the large dynamic range of the system

    METHODOLOGY, CHARACTERISATION AND RESULTS FROM THE PROTOTYPE BEAM LOSS MONITORING ASIC AT CERN

    Get PDF
    The characterisation of novel beam loss monitoring front-end converters, based on radiation-hardened application-specific integrated circuits (ASIC), is undergoing at CERN. An effective performance analysis of the newly developed ASICs plays a key role in their candidacy for the future installation in the HL-LHC complex. This work introduces the latest test-bed architecture, used to characterise such a device, together with the variety of audits involved. Special focus is given on the verification methodology of data acquisition and measurements, in order to allow a detailed study of the conversion capabilities, the evaluation of the device resolution and the linearity response. Finally, the first results of post-irradiation measurements are also reported

    The LHC Injection Tests

    Get PDF
    A series of LHC injection tests was performed in August and September 2008. The first saw beam injected into sector 23; the second into sectors 78 and 23; the third into sectors 78-67 and sectors 23-34-45. The fourth, into sectors 23-34-45, was performed the evening before the extended injection test on the 10th September which saw both beams brought around the full circumference of the LHC. The tests enabled the testing and debugging of a number of critical control and hardware systems; testing and validation of instrumentation with beam for the first time; deployment, and validation of a number of measurement procedures. Beam based measurements revealed a number of machine configuration issues that were rapidly resolved. The tests were undoubtedly an essential precursor to the successful start of LHC beam commissioning. This paper provides an outline of preparation for the tests, the machine configuration and summarizes the measurements made and individual system performance
    • …
    corecore