12 research outputs found

    Manufacturing and Tests of the European 1 MW, 170 GHz CW Gyrotron Prototype for ITER

    No full text
    An industrial 1 MW, 170 GHz continuous-wave (CW) gyrotron prototype has been manufactured in 2015 at Thales. The physical design is provided by the European GYrotron Consortium (EGYC) and is supported by the construction and the measurement of a modular short-pulse (SP) prototype. In this presentation, the latest experimental results are discussed, with respect to the previous results acquired for the modular SP prototype gyrotron

    Metrology techniques for the verification of the alignment of the EU gyrotron prototype for ITER

    Get PDF
    The EU gyrotron for the ITER Electron Cyclotron (EC) heating system has been developed in coordinated efforts of the EGYC Consortium, Thales ED (TED) and Fusion for Energy (F4E) and under the supervision of ITER Organization Central Team. After the successful verification of the design of the 1MW, 170 GHz hollow cylindrical cavity gyrotron operating at the nominal TE32,9 mode with a short pulse gyrotron prototype at KIT, an industrial CW gyrotron prototype was manufactured by TED and tested at ~0.8 MW output power and 180 s pulse duration, which is the limit of the HV power supply currently available at KIT. The experiments are being continued at SPC in 2018 to extend further the pulse duration, taking advantage of the existing CW full-power capabilities of the gyrotron test facility recently upgraded for the FALCON project. The gyrotron cavity interaction is very sensitive to the alignment of the internal mechanical parts of the gyrotron tube with the magnetic field generated by the superconducting magnet within a typical range of 0.2 – 0.5 mm. The control of the tolerances and deformations becomes therefore critical to achieving the target performances. With the EU gyrotron prototype it was possible to adjust the alignment of the gyrotron tube with respect to the magnetic field axis during the installation and commissioning phase. The actual shift and tilt movements were verified using advanced metrology methods such as photogrammetry. In this paper, the alignment control techniques and procedures will be discussed also in view of enhancing the reproducibility of gyrotron performance during series production

    Metrology techniques for the verification of the alignment of the EU gyrotron prototype for ITER

    No full text
    The EU gyrotron for the ITER Electron Cyclotron (EC) heating system has been developed in coordinated efforts of the EGYC Consortium, Thales ED (TED) and Fusion for Energy (F4E) and under the supervision of ITER Organization Central Team. After the successful verification of the design of the 1MW, 170 GHz hollow cylindrical cavity gyrotron operating at the nominal TE32,9 mode with a short pulse gyrotron prototype at KIT, an industrial CW gyrotron prototype was manufactured by TED and tested at similar to 0.8 MW output power and 180 s pulse duration, which is the limit of the HV power supply currently available at KIT. The experiments are being continued at SPC in 2018 to extend further the pulse duration, taking advantage of the existing CW full-power capabilities of the gyrotron test facility recently upgraded for the FALCON project. The gyrotron cavity interaction is very sensitive to the alignment of the internal mechanical parts of the gyrotron tube with the magnetic field generated by the superconducting magnet within a typical range of 0.2 - 0.5 mm. The control of the tolerances and deformations becomes therefore critical to achieving the target performances. With the EU gyrotron prototype it was possible to adjust the alignment of the gyrotron tube with respect to the magnetic field axis during the installation and commissioning phase. The actual shift and tilt movements were verified using advanced metrology methods such as photogrammetry. In this paper, the alignment control techniques and procedures will be discussed also in view of enhancing the reproducibility of gyrotron performance during series production

    Heating neutral beams for ITER: present status

    No full text
    The heating neutral beam (HNB) systems at ITER are designed to inject a total of 33 MW of either 1 MeV D0 or 870 keV H0 beams into the ITER plasma using two injectors with a possible addition of a third injector later to increase the injected power to ~50 MW. The injectors become radioactive due to the neutron flux from ITER and, in order to avoid the resulting complex remote maintenance, the design, choice of materials and the manufacturing process of each component of the injector is, wherever possible, such that they survive the life time of ITER. To ensure a smooth operational phase of neutral beams at ITER a neutral beam test facility (NBTF) is under construction at Consorzio RFX, Padova, (hereinafter referred to as RFX), which consists of 2 test beds, the 100 kV \u201cSPIDER\u201d, and a 1 MV \u201cMITICA\u201d facilities, which will be used to optimize the source operation for H and D beams. MITICA is essentially a full scale ITER prototype injector for the ITER beam parameters. The manufacturing and operation of the facility will allow validation of the operational space of the injectors and provide valuable information about the manufacturing processes applicable to HNB components. Operation of the two facilities is expected to begin in 2016 and 2019 respectively. Currently experiments on the ELISE facility with a half ITER sized RF beam source are underway. ITER relevant parameters for the H beams have almost been achieved. Efforts are underway to optimise the same with D beams. The experimental database from ELISE will be an important input for establishing the ITER relevant parameter space on the SPIDER source. This paper discusses the present status of the design and development of the injectors for ITER and the progress on the test facilities

    Progress in the ITER electron cyclotron heating and current drive system design

    No full text
    An electron cyclotron system is one of the four auxiliary plasma heating systems to be installed on the ITER tokamak. The ITER EC system consists of 24 gyrotrons with associated 12 high voltage power supplies, a set of evacuated transmission lines and two types of launchers. The whole system is designed to inject 20 MW of microwave power at 170 GHz into the plasma. The primary functions of the system include plasma start-up, central heating and current drive, and magneto-hydrodynamic instabilities control. The design takes present day technology and extends towards high power CW operation, which represents a large step forward as compared to the present state of the art. The ITER EC system will be a stepping stone to future EC systems for DEMO and beyond. The EC system is faced with significant challenges, which not only includes an advanced microwave system for plasma heating and current drive applications but also has to comply with stringent requirements associated with nuclear safety as ITER became the first fusion device licensed as basic nuclear installations as of 9 November 2012. Since conceptual design of the EC system established in 2007, the EC system has progressed to a preliminary design stage in 2012, and is now moving forward towards a final design. The majority of the subsystems have completed the detailed design and now advancing towards the final design completion. (C) 2014 Elsevier B.V. All rights reserved

    Status of the development of the EU 170 GHz/1 MW/CW gyrotron

    No full text
    The progress in the development of the European 170 GHz, 1 MW/CW gyrotron for electron cyclotron heating & current drive (ECH&CD) on ITER is reported. A continuous wave (CW) prototype is being manufactured by Thales Electron Devices (TED), France, while a short-pulse (SP) prototype gyrotron is in parallel under manufacture at Karlsruhe Institute of Technology (KIT), with the purpose of validating the design of the CW industrial prototype components. The fabrication of most of the sub-assemblies of the SP prototype has been completed. In a first step, an existing magnetron injection gun (MIG) available at KIT was used. Despite this non-ideal configuration, the experiments provided a validation of the design, substantiated by an excellent agreement with numerical simulations. The tube, operated without a depressed collector, is able to produce more than 1 MW of output power with efficiency in excess of 30%, as expected, and compatible with the ITER requirements. (C) 2015 Karlsruhe Institute of Technology. Published by Elsevier B.V. All rights reserved

    Status of the ITER Electron Cyclotron Heating and Current Drive System

    No full text
    The electron cyclotron (EC) heating and current drive (H&CD) system developed for the ITER is made of 12 sets of high-voltage power supplies feeding 24 gyrotrons connected through 24 transmission lines (TL), to five launchers, four located in upper ports and one at the equatorial level. Nearly all procurements are in-kind, following general ITER philosophy, and will come from Europe, India, Japan, Russia and the USA. The full system is designed to couple to the plasma 20 MW among the 24 MW generated power, at the frequency of 170 GHz, for various physics applications such as plasma start-up, central H&CD and magnetohydrodynamic (MHD) activity control. The design takes present day technology and extends toward high-power continuous operation, which represents a large step forward as compared to the present state of the art. The ITER EC system will be a stepping stone to future EC systems for DEMO and beyond. The development of the EC system is facing significant challenges, which includes not only an advanced microwave system but also compliance with stringent requirements associated with nuclear safety as ITER became the first fusion device licensed as basic nuclear installations as of 9 November 2012. Since the conceptual design of the EC system was established in 2007, the EC system has progressed to a preliminary design stage in 2012 and is now moving forward toward a final design