438 research outputs found
NASA Langley Research Center Systems Analysis & Concepts Directorate Participation in the Exploration Systems Architecture Study
The NASA Langley Research Center (LaRC) Systems Analysis & Concepts Directorate (SACD) began studying human exploration missions beyond low Earth orbit (LEO) in the year 1999. This included participation in NASA s Decadal Planning Team (DPT), the NASA Exploration Team (NExT), Space Architect studies and Revolutionary Aerospace Systems Concepts (RASC) architecture studies that were used in formulating the new Vision for Space Exploration. In May of 2005, NASA initiated the Exploration Systems Architecture Study (ESAS). The primary outputs of the ESAS activity were concepts and functional requirements for the Crewed Exploration Vehicle (CEV), its supporting launch vehicle infrastructure and identification of supporting technology requirements and investments. An exploration systems analysis capability has evolved to support these functions in the past and continues to evolve to support anticipated future needs. SACD had significant roles in supporting the ESAS study team. SACD personnel performed the liaison function between the ESAS team and the Shuttle/Station Configuration Options Team (S/SCOT), an agency-wide team charged with using the Space Shuttle to complete the International Space Station (ISS) by the end of Fiscal Year (FY) 2010. The most significant of the identified issues involved the ability of the Space Shuttle system to achieve the desired number of flights in the proposed time frame. SACD with support from the Kennedy Space Center performed analysis showing that, without significant investments in improving the shuttle processing flow, that there was almost no possibility of completing the 28-flight sequence by the end of 2010. SACD performed numerous Lunar Surface Access Module (LSAM) trades to define top level element requirements and establish architecture propellant needs. Configuration trades were conducted to determine the impact of varying degrees of segmentation of the living capabilities of the combined descent stage, ascent stage, and other elements. The technology assessment process was developed and implemented by SACD as the ESAS architecture was refined. SACD implemented a rigorous and objective process which included (a) establishing architectural functional needs, (b) collection, synthesis and mapping of technology data, and (c) performing an objective decision analysis resulting in technology development investment recommendations. The investment recommendation provided budget, schedule, and center/program allocations to develop required technologies for the exploration architecture, as well as the identification of other investment opportunities to maximize performance and flexibility while minimizing cost and risk. A summary of the trades performed and methods utilized by SACD for the Exploration Systems Mission Directorate (ESAS) activity is presented along with how SACD is currently supporting the implementation of the Vision for Space Exploration
Preliminary design of a new high intensity injection system for GANIL.
http://accelconf.web.cern.ch/AccelConf/c89/papers/f6-12.pdfInternational audienc
Vigna Unguiculata as Source of Angiotensin-I Converting Enzyme Inhibitory and Antioxidant Peptides
First Observation of Self-Amplified Spontaneous Emission in a Free-Electron Laser at 109 nm Wavelength
We present the first observation of Self-Amplified Spontaneous Emission
(SASE) in a free-electron laser (FEL) in the Vacuum Ultraviolet regime at 109
nm wavelength (11 eV). The observed free-electron laser gain (approx. 3000) and
the radiation characteristics, such as dependency on bunch charge, angular
distribution, spectral width and intensity fluctuations all corroborate the
existing models for SASE FELs.Comment: 6 pages including 6 figures; e-mail: [email protected]
Antihypertensive and Antioxidant Effects of Functional Foods Containing Chia (Salvia hispanica) Protein Hydrolysates
Conceptual design of the SPL II: A high-power superconducting linac at CERN
An analysis of the revised physics needs and recent progress in the technology of superconducting RF cavities have led to major changes in the speci cation and in the design for a Superconducting Proton Linac (SPL) at CERN. Compared with the rst conceptual design report (CERN 2000012) the beam energy is almost doubled (3.5 GeV instead of 2.2 GeV), while the length of the linac is reduced by 40% and the repetition rate is reduced to 50 Hz. The basic beam power is at a level of 45MW and the approach chosen offers enough margins for upgrades. With this high beam power, the SPL can be the proton driver for an ISOL-type radioactive ion beam facility of the next generation (`EURISOL'), and for a neutrino facility based on superbeam C beta-beam or on muon decay in a storage ring (`neutrino factory'). The SPL can also replace the Linac2 and PS Booster in the low-energy part of the CERN proton accelerator complex, improving signi cantly the beam performance in terms of brightness and intensity for the bene t of all users including the LHC and its luminosity upgrade. Decommissioned LEP klystrons and RF equipment are used to provide RF power at a frequency of 352.2 MHz in the lowenergy part of the accelerator. Beyond 90 MeV, the RF frequency is doubled to take advantage of more compact normal-conducting accelerating structures up to an energy of 180 MeV. From there, state-ofthe- art, high-gradient, bulk-niobium superconducting cavities accelerate the beam up to its nal energy of 3.5 GeV. The overall design approach is presented, together with the progress that has been achieved since the publication of the rst conceptual design report
Performance gap and nZEB compliance of monitored Passivhaus in Northern Ireland, the Republic of Ireland and Italy
The SPL (II) at CERN, a Superconducting 3.5 GeV H- Linac
A revision of the physics needs and recent progress in the technology of superconducting (SC) RF cavities have triggered major changes in the design of a SC H-linac at CERN. With up to 5MW beam power, the SPL can be the proton driver for a next generation ISOL-type radioactive beam facility (âEURISOLâ) and/or supply protons to a neutrino () facility (conventional superbeam + beta-beam or -factory). Furthermore the SPL can replace Linac2 and the PS booster (PSB), improving significantly the beam performance in terms of brightness, intensity, and reliability for the benefit of all proton users at CERN, including LHC and its luminosity upgrade. Compared with the first conceptual design, the beam energy is almost doubled (3.5GeV instead of 2.2 GeV) while the length is reduced by 40%. At a repetition rate of 50 Hz, the linac reuses decommissioned 352.2MHz RF equipment from LEP in the low-energy part. Beyond 90MeV the RF frequency is doubled, and from 180MeV onwards high-gradient SC bulkniobium cavities accelerate the beam to its final energy of 3.5GeV. This paper presents the overall design approach, together with the technical progress since the first conceptual design in 2000
Efficacy of different doses and time intervals of oral vitamin D supplementation with or without calcium in elderly nursing home residents: reply to comment by Vieth
- …
