    04231 Abstracts Collection -- Scheduling in Computer and Manufacturing Systems

    Get PDF
    During 31.05.-04.06.04, the Dagstuhl Seminar 04231 "Scheduling in Computer and Manufacturing Systems" was held in the International Conference and Research Center (IBFI), Schloss Dagstuhl. During the seminar, several participants presented their current research, and ongoing work and open problems were discussed. Abstracts of the presentations given during the seminar as well as abstracts of seminar results and ideas are put together in this paper. The first section describes the seminar topics and goals in general. Links to extended abstracts or full papers are provided, if available

    Solution Methods for a Scheduling Problem with Incompatibility and Precedence Constraints

    Get PDF
    Consider a project which consists in a set of operations to be performed, assuming the processing time of each operation is at most one time period. In this project, precedence and incompatibility constraints between operations have to be satisfied. The goal is to assign a time period to each operation while minimizing the duration of the whole project and while taking into account all the constraints. Based on the mixed graph coloring model and on an efficient and quick tabu search algorithm for the usual graph coloring problem, we propose a tabu search algorithm as well as a variable neighborhood search heuristic for the considered scheduling problem. We formulate an integer linear program (useful for the CPLEX solver) as well as a greedy procedure for comparison considerations. Numerical results are reported on instances with up to 500 operations

    Open Shop Scheduling with Synchronization

    Get PDF
    In this paper, we study open shop scheduling problems with synchronization. This model has the same features as the classical open shop model, where each of the n jobs has to be processed by each of the m machines in an arbitrary order. Unlike the classical model, jobs are processed in synchronous cycles, which means that the m operations of the same cycle start at the same time. Within one cycle, machines which process operations with smaller processing times have to wait until the longest operation of the cycle is finished before the next cycle can start. Thus, the length of a cycle is equal to the maximum processing time of its operations. In this paper, we continue the line of research started by Weiß et al. (Discrete Appl Math 211:183–203, 2016). We establish new structural results for the two-machine problem with the makespan objective and use them to formulate an easier solution algorithm. Other versions of the problem, with the total completion time objective and those which involve due dates or deadlines, turn out to be NP-hard in the strong sense, even for m=2 machines. We also show that relaxed models, in which cycles are allowed to contain less than m jobs, have the same complexity status

    A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

    Get PDF
    AbstractThis research focuses on a scheduling problem with multiple unavailability periods and distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness of jobs. In order to optimize the problem exactly a mathematical model is proposed. However due to computational difficulties for large instances of the considered problem a modified variable neighborhood search (VNS) is developed. In basic VNS, the searching process to achieve to global optimum or near global optimum solution is totally random, and it is known as one of the weaknesses of this algorithm. To tackle this weakness, a VNS algorithm is combined with a knowledge module. In the proposed VNS, knowledge module extracts the knowledge of good solution and save them in memory and feed it back to the algorithm during the search process. Computational results show that the proposed algorithm is efficient and effective

    Genetic Algorithm for Teaching Distribution based on Lecturers’ Expertise

    Get PDF
    The teaching distribution for lecturers based on their expertise is very important in the teaching and learning process. Lecturers who teach a course that is in accordance with their interests and abilities will make it easier for them to deliver material in class. In addition, students will also be easier to accept the material presented. However, in reality, the teaching distribution is often not in accordance with the expertise of the lecturer so that the lecturers are not optimal in providing material to their students. This problem can be solved using optimization methods such as the genetic algorithm. This study offers a solution for teaching distribution that focuses on the interest of each lecturer by considering the order of priorities. The optimal parameters of the test results are crossover rate (cr) = 0.6, mutation rate (mr) = 0.4, number of generations = 40, and population size = 15. Genetic algorithm is proven to be able to produce teaching distribution solutions with a relatively high fitness value at 4903.3

    A general Framework for Utilizing Metaheuristic Optimization for Sustainable Unrelated Parallel Machine Scheduling: A concise overview

    Full text link
    Sustainable development has emerged as a global priority, and industries are increasingly striving to align their operations with sustainable practices. Parallel machine scheduling (PMS) is a critical aspect of production planning that directly impacts resource utilization and operational efficiency. In this paper, we investigate the application of metaheuristic optimization algorithms to address the unrelated parallel machine scheduling problem (UPMSP) through the lens of sustainable development goals (SDGs). The primary objective of this study is to explore how metaheuristic optimization algorithms can contribute to achieving sustainable development goals in the context of UPMSP. We examine a range of metaheuristic algorithms, including genetic algorithms, particle swarm optimization, ant colony optimization, and more, and assess their effectiveness in optimizing the scheduling problem. The algorithms are evaluated based on their ability to improve resource utilization, minimize energy consumption, reduce environmental impact, and promote socially responsible production practices. To conduct a comprehensive analysis, we consider UPMSP instances that incorporate sustainability-related constraints and objectives