8,631 research outputs found
Submodular Function Maximization for Group Elevator Scheduling
We propose a novel approach for group elevator scheduling by formulating it
as the maximization of submodular function under a matroid constraint. In
particular, we propose to model the total waiting time of passengers using a
quadratic Boolean function. The unary and pairwise terms in the function denote
the waiting time for single and pairwise allocation of passengers to elevators,
respectively. We show that this objective function is submodular. The matroid
constraints ensure that every passenger is allocated to exactly one elevator.
We use a greedy algorithm to maximize the submodular objective function, and
derive provable guarantees on the optimality of the solution. We tested our
algorithm using Elevate 8, a commercial-grade elevator simulator that allows
simulation with a wide range of elevator settings. We achieve significant
improvement over the existing algorithms.Comment: 10 pages; 2017 International Conference on Automated Planning and
Scheduling (ICAPS
Human-Machine Collaborative Optimization via Apprenticeship Scheduling
Coordinating agents to complete a set of tasks with intercoupled temporal and
resource constraints is computationally challenging, yet human domain experts
can solve these difficult scheduling problems using paradigms learned through
years of apprenticeship. A process for manually codifying this domain knowledge
within a computational framework is necessary to scale beyond the
``single-expert, single-trainee" apprenticeship model. However, human domain
experts often have difficulty describing their decision-making processes,
causing the codification of this knowledge to become laborious. We propose a
new approach for capturing domain-expert heuristics through a pairwise ranking
formulation. Our approach is model-free and does not require enumerating or
iterating through a large state space. We empirically demonstrate that this
approach accurately learns multifaceted heuristics on a synthetic data set
incorporating job-shop scheduling and vehicle routing problems, as well as on
two real-world data sets consisting of demonstrations of experts solving a
weapon-to-target assignment problem and a hospital resource allocation problem.
We also demonstrate that policies learned from human scheduling demonstration
via apprenticeship learning can substantially improve the efficiency of a
branch-and-bound search for an optimal schedule. We employ this human-machine
collaborative optimization technique on a variant of the weapon-to-target
assignment problem. We demonstrate that this technique generates solutions
substantially superior to those produced by human domain experts at a rate up
to 9.5 times faster than an optimization approach and can be applied to
optimally solve problems twice as complex as those solved by a human
demonstrator.Comment: Portions of this paper were published in the Proceedings of the
International Joint Conference on Artificial Intelligence (IJCAI) in 2016 and
in the Proceedings of Robotics: Science and Systems (RSS) in 2016. The paper
consists of 50 pages with 11 figures and 4 table
Weighted Constraints in Fuzzy Optimization
Many practical optimization problems are characterized by someflexibility in the problem constraints, where this flexibility canbe exploited for additional trade-off between improving theobjective function and satisfying the constraints. Especially indecision making, this type of flexibility could lead to workablesolutions, where the goals and the constraints specified bydifferent parties involved in the decision making are traded offagainst one another and satisfied to various degrees. Fuzzy setshave proven to be a suitable representation for modeling this typeof soft constraints. Conventionally, the fuzzy optimizationproblem in such a setting is defined as the simultaneoussatisfaction of the constraints and the goals. No additionaldistinction is assumed to exist amongst the constraints and thegoals. This report proposes an extension of this model forsatisfying the problem constraints and the goals, where preferencefor different constraints and goals can be specified by thedecision-maker. The difference in the preference for theconstraints is represented by a set of associated weight factors,which influence the nature of trade-off between improving theoptimization objectives and satisfying various constraints.Simultaneous weighted satisfaction of various criteria is modeledby using the recently proposed weighted extensions of(Archimedean) fuzzy t-norms. The weighted satisfaction of theproblem constraints and goals are demonstrated by using a simplefuzzy linear programming problem. The framework, however, is moregeneral, and it can also be applied to fuzzy mathematicalprogramming problems and multi-objective fuzzy optimization.wiskundige programmering;fuzzy sets;optimalisatie
airline revenue management
With the increasing interest in decision support systems and the continuous advance of computer science, revenue management is a discipline which has received a great deal of interest in recent years. Although revenue management has seen many new applications throughout the years, the main focus of research continues to be the airline industry. Ever since Littlewood (1972) first proposed a solution method for the airline revenue management problem, a variety of solution methods have been introduced. In this paper we will give an overview of the solution methods presented throughout the literature.revenue management;seat inventory control;OR techniques;mathematical programming
Mathematical models for planning support
In this paper we describe how computer systems can provide planners with active planning support, when these planners are carrying out their daily planning activities. This means that computer systems actively participate in the planning process by automatically generating plans or partial plans. Active planning support by computer systems requires the application of mathematical models and solution techniques. In this paper we describe the modeling process in general terms, as well as several modeling and solution techniques. We also present some background information on computational complexity theory, since most practical planning problems are hard to solve. We also describe how several objective functions can be handled, since it is rare that solutions can be evaluated by just one single objective. Furthermore, we give an introduction into the use of mathematical modeling systems, which are useful tools in a modeling context, especially during the development phases of a mathematical model. We finish the paper with a real life example related to the planning process of the rolling stock circulation of a railway operator.optimization;mathematical models;modeling process;planning support;Planning
Optimal management of bio-based energy supply chains under parametric uncertainty through a data-driven decision-support framework
This paper addresses the optimal management of a multi-objective bio-based energy supply chain network subjected to multiple sources of uncertainty. The complexity to obtain an optimal solution using traditional uncertainty management methods dramatically increases with the number of uncertain factors considered. Such a complexity produces that, if tractable, the problem is solved after a large computational effort. Therefore, in this work a data-driven decision-making framework is proposed to address this issue. Such a framework exploits machine learning techniques to efficiently approximate the optimal management decisions considering a set of uncertain parameters that continuously influence the process behavior as an input. A design of computer experiments technique is used in order to combine these parameters and produce a matrix of representative information. These data are used to optimize the deterministic multi-objective bio-based energy network problem through conventional optimization methods, leading to a detailed (but elementary) map of the optimal management decisions based on the uncertain parameters. Afterwards, the detailed data-driven relations are described/identified using an Ordinary Kriging meta-model. The result exhibits a very high accuracy of the parametric meta-models for predicting the optimal decision variables in comparison with the traditional stochastic approach. Besides, and more importantly, a dramatic reduction of the computational effort required to obtain these optimal values in response to the change of the uncertain parameters is achieved. Thus the use of the proposed data-driven decision tool promotes a time-effective optimal decision making, which represents a step forward to use data-driven strategy in large-scale/complex industrial problems.Peer ReviewedPostprint (published version
Recommended from our members
State-of-the-art on research and applications of machine learning in the building life cycle
Fueled by big data, powerful and affordable computing resources, and advanced algorithms, machine learning has been explored and applied to buildings research for the past decades and has demonstrated its potential to enhance building performance. This study systematically surveyed how machine learning has been applied at different stages of building life cycle. By conducting a literature search on the Web of Knowledge platform, we found 9579 papers in this field and selected 153 papers for an in-depth review. The number of published papers is increasing year by year, with a focus on building design, operation, and control. However, no study was found using machine learning in building commissioning. There are successful pilot studies on fault detection and diagnosis of HVAC equipment and systems, load prediction, energy baseline estimate, load shape clustering, occupancy prediction, and learning occupant behaviors and energy use patterns. None of the existing studies were adopted broadly by the building industry, due to common challenges including (1) lack of large scale labeled data to train and validate the model, (2) lack of model transferability, which limits a model trained with one data-rich building to be used in another building with limited data, (3) lack of strong justification of costs and benefits of deploying machine learning, and (4) the performance might not be reliable and robust for the stated goals, as the method might work for some buildings but could not be generalized to others. Findings from the study can inform future machine learning research to improve occupant comfort, energy efficiency, demand flexibility, and resilience of buildings, as well as to inspire young researchers in the field to explore multidisciplinary approaches that integrate building science, computing science, data science, and social science
- âŠ