6 research outputs found

    Dynamic lot size MIPs for multiple products and ELSPs with shortages, capacity and changeover limits

    Get PDF
    Scheduling multiple products with limited resources and varying demands remain a critical challenge for many industries. This work presents mixed integer programs (MIPs) that solve the Economic Lot Sizing Problem (ELSP) and other Dynamic Lot-Sizing (DLS) models with multiple items. DLS systems are classified, extended and formulated as MIPs. Especially, logical constraints are a key ingredient in succeeding in this endeavour. They were used to formulate the setup/changeover of items in the production line. Minimising the holding, shortage and setup costs is the primary objective for ELSPs. This is achieved by finding an optimal production schedule taking into account the limited manufacturing capacity. Case studies for a production plants are used to demonstrate the functionality of the MIPs. Optimal DLS and ELSP solutions are given for a set of test-instances. Insights into the runtime and solution quality are given.Comment: 14 pages, 6 figure

    Heurísticas Dinámicas para el DCC-ELSP

    Get PDF
    [ESP] En este artículo se presentan una serie de heurísticas para la resolución del problema del DCC-ELSP (Deliberated and Controlled Coproduction Economic Lot Scheduling Problem), es decir, Problema del Programación del Lote Económico con Coproducción Deliberada y Controlada. Señalar que existe coproducción cuando un proceso productivo da como resultado más de un producto de manera simultánea (Deuermeyer y Pierskalla, 1978). Si se conoce toda la información sobre los parámetros de producción (tiempos, costes, ratios de fabricación...) se dice que la coproducción es controlada. Si se puede decidir fabricar con coproducción o independientemente cada producto se dice que la coproducción es deliberada. Se diseñan cuatro heurísticas que van a considerar unos tiempos de ciclo para cada una de las opciones productivas que son dinámicos en el tiempo y que van a ser capaces de establecer planes de fabricación que indiquen en cada periodo productivo el producto o productos a fabricar, considerando la posibilidad de coproducción, y la cantidad prevista a fabricar. Las heurísticas se van a aplicar en un entorno multí-item mixto, en el que se considera la posible coproducción deliberada y controlada de productos en parejas de dos, y la producción de manera aislada de otros productos. Se va a evaluar si las heurísticas modelan adecuadamente el fenómeno de coproducción, para ello, se simularan a partir de unos experimentos de cuyos resultados se obtendrán conclusiones.El presente trabajo se ha desarrollado gracias a la ayuda DPI2010-18243 del MICINN con el título "Coordinación de operaciones en redes de suministro/demanda ajustadas, resilientes a la incertidumbre: modelos y algoritmos para la gestión de la incertidumbre y la complejidad", así como la beca doctoral VALi+d concedida por la Generalitat Valenciana a Julien Maheut (Ref. ACIF/2010)

    Enfoques para la Resolución del Problema ELSP

    Full text link
    [ES] En este trabajo se pretende realizar una recopilación de los enfoques planteados en la literatura para la resolución del problema de Programación del Lote Económico, esto es, ELSP. Estos métodos son: Solución Independiente, Ciclo Común, Periodo Básico, Periodo Básico Extendido y Variación del Tamaño de Lote. Para cada una de las aproximaciones de solución se plantea a quien son atribuidas, el correspondiente modelo, así como una serie de referencias que lo han empleado.Este trabajo ha sido realizado gracias a la financiación de la Universidad Politécnica de Valencia, a través del proyecto PAID-05-09-4335 "Coordinación de flujos de materiales e información en sistemas distribuidos de producción".Vidal Carreras, PI. (2010). Enfoques para la Resolución del Problema ELSP. Working Papers on Operations Management. 1(2):31-43. doi:10.4995/wpom.v1i2.787SWORD314312Ballou, R. H. (2004). Logística: Administración de la cadena de suministro. Pearson Educación.Ben-Daya, M., & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51(7), 875-881. doi:10.1057/palgrave.jors.2600974Bomberger, E. E. (1966). A Dynamic Programming Approach to a Lot Size Scheduling Problem. Management Science, 12(11), 778-784. doi:10.1287/mnsc.12.11.778Brander, P.; Forsberg, R. (2004). Determination of safety stocks for cyclic schedules with stochastic demands. International Journal of Production Economics, Vol. In Press, Corrected Proof.Brander, P., Levén, E., & Segerstedt, A. (2005). Lot sizes in a capacity constrained facility—a simulation study of stationary stochastic demand. International Journal of Production Economics, 93-94, 375-386. doi:10.1016/j.ijpe.2004.06.034Carstensen, P. (1999). Das Economic Lot Scheduling Problem - Überblick und LP-basiertes Verfahren. OR Spectrum, 21(4), 429-460. doi:10.1007/s002910050097Chandrasekaran, C., Rajendran, C., Chetty, O. V. K., & Hanumanna, D. (2007). Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach. European J. of Industrial Engineering, 1(2), 152. doi:10.1504/ejie.2007.014107Davis, S. G. (1990). Scheduling Economic Lot Size Production Runs. Management Science, 36(8), 985-998. doi:10.1287/mnsc.36.8.985Delporte, C. M., & Thomas, L. J. (1977). Lot Sizing and Sequencing forNProducts on One Facility. Management Science, 23(10), 1070-1079. doi:10.1287/mnsc.23.10.1070Dobson, G. (1987). The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes. Operations Research, 35(5), 764-771. doi:10.1287/opre.35.5.764Doll, C. L., & Whybark, D. C. (1973). An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem. Management Science, 20(1), 50-55. doi:10.1287/mnsc.20.1.50Elmaghraby, S. E. (1978). The Economic Lot Scheduling Problem (ELSP): Review and Extensions. Management Science, 24(6), 587-598. doi:10.1287/mnsc.24.6.587Erlenkotter, D. (1990). Ford Whitman Harris and the Economic Order Quantity Model. Operations Research, 38(6), 937-946. doi:10.1287/opre.38.6.937Eynan, A. (2003). The Benefits of Flexible Production Rates in the Economic Lot Scheduling Problem. IIE Transactions, 35(11), 1057-1064. doi:10.1080/07408170304400Gallego, G. (1990). Scheduling the Production of Several Items with Random Demands in a Single Facility. Management Science, 36(12), 1579-1592. doi:10.1287/mnsc.36.12.1579Gallego, G., & Moon, I. (1992). The Effect of Externalizing Setups in the Economic Lot Scheduling Problem. Operations Research, 40(3), 614-619. doi:10.1287/opre.40.3.614Gallego, G., & Roundy, R. (1992). The economic lot scheduling problem with finite backorder costs. Naval Research Logistics, 39(5), 729-739. doi:10.1002/1520-6750(199208)39:53.0.co;2-nGALLEGO, G., & SHAW, D. X. (1997). Complexity of the ELSP with general cyclic schedules. IIE Transactions, 29(2), 109-113. doi:10.1080/07408179708966318GASCON, A., LEACHMAN, R. C., & LEFRANÇOIS, P. (1994). Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics. International Journal of Production Research, 32(3), 583-596. doi:10.1080/00207549408956954Giri, B. C., Moon, I., & Yun, W. Y. (2003). Scheduling economic lot sizes in deteriorating production systems. Naval Research Logistics, 50(6), 650-661. doi:10.1002/nav.10082Goyal, S. . (1997). Observation on the economic lot scheduling problem: Theory and practice. International Journal of Production Economics, 50(1), 61. doi:10.1016/s0925-5273(97)00025-xHaessler, R. W. (1979). An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem. A I I E Transactions, 11(4), 336-340. doi:10.1080/05695557908974480Haessler, R. W., & Hogue, S. L. (1976). Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem. Management Science, 22(8), 909-912. doi:10.1287/mnsc.22.8.909Hahm, J., & Yano, C. A. (1995). The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies. Transportation Science, 29(3), 222-241. doi:10.1287/trsc.29.3.222Hanssmann, F. (1962). Operations-Research in Production and Inventory Control. J. Wiley.Harris, F. W. (1913). How many parts to make an once. Factory, The Magazine of Management, Vol. 10, nº. 2, pp. 135-6-152.Hsu, W.-L. (1983). On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine. Management Science, 29(1), 93-105. doi:10.1287/mnsc.29.1.93HWANG, H., KIM, D. B., & KIM, Y. D. (1993). Multiproduct economic lot size models with investment costs for setup reduction and quality improvement. International Journal of Production Research, 31(3), 691-703. doi:10.1080/00207549308956751JONES, P. C., & INMAN, R. R. (1989). When Is The Economic Lot Scheduling Problem Easy? IIE Transactions, 21(1), 11-20. doi:10.1080/07408178908966202Khouja, M., Michalewicz, Z., & Wilmot, M. (1998). The use of genetic algorithms to solve the economic lot size scheduling problem. European Journal of Operational Research, 110(3), 509-524. doi:10.1016/s0377-2217(97)00270-1Khoury, B. N., Abboud, N. E., & Tannous, M. M. (2001). The common cycle approach to the ELSP problem with insufficient capacity. International Journal of Production Economics, 73(2), 189-199. doi:10.1016/s0925-5273(00)00175-4Larrañeta, J., & Onieva, L. (1988). The Economic Lot-Scheduling Problem: A Simple Approach. Journal of the Operational Research Society, 39(4), 373-379. doi:10.1057/jors.1988.65Leachman, R. C., & Gascon, A. (1988). A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands. Management Science, 34(3), 377-390. doi:10.1287/mnsc.34.3.377Madigan, J. G. (1968). Scheduling a Multi-Product Single Machine System for an Infinite Planning Period. Management Science, 14(11), 713-719. doi:10.1287/mnsc.14.11.713Maxwell, W. L. (1964). The scheduling of economic lot sizes. Naval Research Logistics Quarterly, 11(2), 89-124. doi:10.1002/nav.3800110202Moon, I., Giri, B. C., & Choi, K. (2002). Economic lot scheduling problem with imperfect production processes and setup times. Journal of the Operational Research Society, 53(6), 620-629. doi:10.1057/palgrave.jors.2601350Moon, I., Silver, E. A., & Choi, S. (2002). Hybrid genetic algorithm for the economic lot-scheduling problem. International Journal of Production Research, 40(4), 809-824. doi:10.1080/00207540110095222MOON, I., HAHM, J., & LEE, C. (1998). The effect of the stabilization period on the economic lot scheduling problem. IIE Transactions, 30(11), 1009-1017. doi:10.1080/07408179808966557Öner, S., & Bilgiç, T. (2008). Economic lot scheduling with uncontrolled co-production. European Journal of Operational Research, 188(3), 793-810. doi:10.1016/j.ejor.2007.05.016Schweitzer, P. J., & Silver, E. A. (1983). Technical Note—Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem. Operations Research, 31(2), 401-405. doi:10.1287/opre.31.2.401Segerstedt, A. (1999). Lot sizes in a capacity constrained facility with available initial inventories. International Journal of Production Economics, 59(1-3), 469-475. doi:10.1016/s0925-5273(98)00111-xSoman, C. A., Pieter van Donk, D., & Gaalman, G. (2006). Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand. International Journal of Production Economics, 104(2), 441-453. doi:10.1016/j.ijpe.2004.08.002Soman, C. A., van Donk, D. P., & Gaalman, G. (2004). Combined make-to-order and make-to-stock in a food production system. International Journal of Production Economics, 90(2), 223-235. doi:10.1016/s0925-5273(02)00376-6Soman, C. A., van Donk, D. P., & Gaalman, G. J. C. (2007). Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study. International Journal of Production Economics, 108(1-2), 191-199. doi:10.1016/j.ijpe.2006.12.042Stankard, M. F.; Gupta, S. K. (1969). A note on Bomberger's approach to lot size scheduling: Heuristic proposed. Management Science Series A-Theory, Vol. 15, nº. 7, pp. 449-452.Sun, H., Huang, H.-C., & Jaruphongsa, W. (2009). The economic lot scheduling problem under extended basic period and power-of-two policy. Optimization Letters, 4(2), 157-172. doi:10.1007/s11590-009-0154-5Tunasar, C.; Rajgopal, J. (1996). An evolutionary computation approach to the economic lot scheduling problem Deparment of Industrial Engineering, University of Pittsburgh, Pittsburgh.Vergin, R. C.; Lee, T. N. (1978). Scheduling Rules for Multiple Product Single Machine System with Stochastic Demand. Infor, Vol. 16, nº. 1, pp. 64-73.Wilson, R. H. (1934). A scientific routine for stock control. Harvard Business Review, Vol. 13, nº. 1, pp. 116-128.Yao, M. J. & Chang, Y. J. (2009). Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach, in Eighth International Conference on Information and Management Sciences, p. F224.Zipkin, P. H. (1991). Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem. Operations Research, 39(1), 56-63. doi:10.1287/opre.39.1.5

    Diseño y validación de un modelo de planeación y programación de la producción basado en sistemas multiproducto – multiempaque

    Get PDF
    La programación de múltiples referencias en los sistemas de manufactura apunta a la facilidad de la producción. En estos sistemas se implementan diferentes estrategias de producción por lotes, de acuerdo con el tipo de sistema. Sin embargo, se ignoran elementos importantes tales como los alistamientos y emisiones de dióxido de carbono por la utilización de energía. Adicionalmente, se tiene incertidumbre de la demanda, la cual influye en cómo se empaca. Por lo tanto, es necesario implementar estrategias de estandarización o flexibilidad para determinar el tamaño de empaque de producto terminado. Esta investigación presenta la formulación de dos modelos matemáticos que integran los problemas de programación de la producción y tamaño de empaque de producto terminado con base en dos estrategias: (1) minimización de costo de unidades perdidas y (2) minimización de costo de desembalaje. Ambos modelos están sujetos a restricciones de secuenciación, tiempos de inicio de procesamiento y empaque, tamaño de los sub–lotes de empaque, tiempo total disponible e inventario final por referencia. Se diseñó un algoritmo genético híbrido (AGH) para resolver cada uno de los modelos. Los resultados obtenidos mostraron que la calidad de las soluciones está afectada por los parámetros de búsqueda del AGH al resolver el modelo 1, mientras que para el modelo 2 no. El tiempo computacional aumenta al agregar referencias al resolver ambos modelos. Además, la segunda estrategia de empaque (modelo 2) entrega mejores resultados por la flexibilidad de abrir empaques de producto terminado.MaestríaMagister en Ingeniería Industria

    An investigation of production and transportation policies for multi-item and multi-stage production systems

    Get PDF
    Die vorliegende kumulative Dissertation besteht aus fünf Artikeln, einem Arbeitspapier und vier Artikeln, die in wissenschaftlichen Zeitschriften veröffentlicht wurden. Alle fünf Artikel beschäftigen sich mit der Losgrößenplanung, jedoch mit unterschiedlichen Schwerpunkten. Artikel 1 bis 4 untersuchen das Economic Lot Scheduling Problem (ELSP), während sich der fünfte Artikel mit einer Variante des Joint Economic Lot Size (JELS) Problems beschäftigt. Die Struktur dieser Dissertation trägt diesen beiden Forschungsrichtungen Rechnung und ordnet die ersten vier Artikel dem Teil A und den fünften Artikel dem Teil B zu
    corecore