    Resource-constrained project scheduling.

    Get PDF
    Abstract: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types. The objective of this paper is to provide a survey of what we believe are important recent in the area . Our main focus will be on the recent progress made in and the encouraging computational experience gained with the use of optimal solution procedures for the basic resource-constrained project scheduling problem (RCPSP) and important extensions. The RCPSP involves the scheduling of a project its duration subject to zero-lag finish-start precedence constraints of the PERT/CPM type and constant availability constraints on the required set of renewable resources. We discuss recent striking advances in dealing with this problem using a new depth-first branch-and-bound procedure, elaborating on the effective and efficient branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive a set of conclusions from the research on optimal solution procedures for the basis RCPSP and subsequently illustrate how effective and efficient branching rules and several of the strong dominance and bounding arguments can be extended to a rich and realistic variety of related problems. The preemptive resource-constrained project scheduling problem (PRCPSP) relaxes the nonpreemption condition of the RCPSP, thus allowing activities to be interrupted at integer points in time and resumed later without additional penalty cost. The generalized resource-constrained project scheduling (GRCPSP) extends the RCPSP to the case of precedence diagramming type of precedence constraints (minimal finish-start, start-start, start-finish, finish-finish precedence relations), activity ready times, deadlines and variable resource availability's. The resource-constrained project scheduling problem with generalized precedence relations (RCPSP-GPR) allows for start-start, finish-start and finish-finish constraints with minimal and maximal time lags. The MAX-NPV problem aims at scheduling project activities in order to maximize the net present value of the project in the absence of resource constraints. The resource-constrained project scheduling problem with discounted cash flows (RCPSP-DC) aims at the same non-regular objective in the presence of resource constraints. The resource availability cost problem (RACP) aims at determining the cheapest resource availability amounts for which a feasible solution exists that does not violate the project deadline. In the discrete time/cost trade-off problem (DTCTP) the duration of an activity is a discrete, non-increasing function of the amount of a single nonrenewable resource committed to it. In the discrete time/resource trade-off problem (DTRTP) the duration of an activity is a discrete, non-increasing function of the amount of a single renewable resource. Each activity must then be scheduled in one of its possible execution modes. In addition to time/resource trade-offs, the multi-mode project scheduling problem (MRCPSP) allows for resource/resource trade-offs and constraints on renewable, nonrenewable and doubly-constrained resources. We report on recent computational results and end with overall conclusions and suggestions for future research.Scheduling; Optimal;

    Scheduling Jobs in Flowshops with the Introduction of Additional Machines in the Future

    Get PDF
    This is the author's peer-reviewed final manuscript, as accepted by the publisher. The published article is copyrighted by Elsevier and can be found at: http://www.journals.elsevier.com/expert-systems-with-applications/.The problem of scheduling jobs to minimize total weighted tardiness in flowshops,\ud with the possibility of evolving into hybrid flowshops in the future, is investigated in\ud this paper. As this research is guided by a real problem in industry, the flowshop\ud considered has considerable flexibility, which stimulated the development of an\ud innovative methodology for this research. Each stage of the flowshop currently has\ud one or several identical machines. However, the manufacturing company is planning\ud to introduce additional machines with different capabilities in different stages in the\ud near future. Thus, the algorithm proposed and developed for the problem is not only\ud capable of solving the current flow line configuration but also the potential new\ud configurations that may result in the future. A meta-heuristic search algorithm based\ud on Tabu search is developed to solve this NP-hard, industry-guided problem. Six\ud different initial solution finding mechanisms are proposed. A carefully planned\ud nested split-plot design is performed to test the significance of different factors and\ud their impact on the performance of the different algorithms. To the best of our\ud knowledge, this research is the first of its kind that attempts to solve an industry-guided\ud problem with the concern for future developments

    Creation of the selection list for the Experiment Scheduling Program (ESP)

    Get PDF
    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures

    Quantitative Methods For Select Problems In Facility Location And Facility Logistics

    Get PDF
    This dissertation presented three logistics problems. The first problem is a parallel machine scheduling problems that considers multiple unique characteristics including release dates, due dates, limited machine availability and job splitting. The objective of is to minimize the total amount of time required to complete work. A mixed integer programming model is presented and a heuristic is developed for solving the problem. The second problem extends the first parallel scheduling problem to include two additional practical considerations. The first is a setup time that occurs when warehouse staff change from one type of task to another. The second is a fixed time window for employee breaks. A simulated annealing (SA) heuristic is developed for its solution. The last problem studied in this dissertation is a new facility location problem variant with application in disaster relief with both verified data and unverified user-generated data are available for consideration during decision making. A total of three decision strategies that can be used by an emergency manager faced with a POD location decision for which both verified and unverified data are available are proposed: Consider Only Verified, Consider All and Consider Minimax Regret. The strategies differ according to how the uncertain user-generated data is incorporated in the planning process. A computational study to compare the performance of the three decision strategies across a range of plausible disaster scenarios is presented

    Evaluating the Robustness of Resource Allocations Obtained through Performance Modeling with Stochastic Process Algebra

    Get PDF
    Recent developments in the field of parallel and distributed computing has led to a proliferation of solving large and computationally intensive mathematical, science, or engineering problems, that consist of several parallelizable parts and several non-parallelizable (sequential) parts. In a parallel and distributed computing environment, the performance goal is to optimize the execution of parallelizable parts of an application on concurrent processors. This requires efficient application scheduling and resource allocation for mapping applications to a set of suitable parallel processors such that the overall performance goal is achieved. However, such computational environments are often prone to unpredictable variations in application (problem and algorithm) and system characteristics. Therefore, a robustness study is required to guarantee a desired level of performance. Given an initial workload, a mapping of applications to resources is considered to be robust if that mapping optimizes execution performance and guarantees a desired level of performance in the presence of unpredictable perturbations at runtime. In this research, a stochastic process algebra, Performance Evaluation Process Algebra (PEPA), is used for obtaining resource allocations via a numerical analysis of performance modeling of the parallel execution of applications on parallel computing resources. The PEPA performance model is translated into an underlying mathematical Markov chain model for obtaining performance measures. Further, a robustness analysis of the allocation techniques is performed for finding a robustmapping from a set of initial mapping schemes. The numerical analysis of the performance models have confirmed similarity with the simulation results of earlier research available in existing literature. When compared to direct experiments and simulations, numerical models and the corresponding analyses are easier to reproduce, do not incur any setup or installation costs, do not impose any prerequisites for learning a simulation framework, and are not limited by the complexity of the underlying infrastructure or simulation libraries

    Rehearsal Scheduling Problem

    Get PDF
    Scheduling is a common task that plays a crucial role in many industries such as manufacturing or servicing. In a competitive environment, effective scheduling is one of the key factors to reduce cost and increase productivity. Therefore, scheduling problems have been studied by many researchers over the past thirty years. Rehearsal scheduling problem (RSP) is similar to the popular resource-constrained project scheduling problem (RCPSP); however, it does not have activity precedence constraints and the resources’ availabilities are not fixed during processing time. RSP can be used to schedule rehearsal in theatre industry or to schedule group scheduling when each member has different sets of available time. In this report, three different approaches are proposed to solve RSP including Constraint Programming, Integer Programming, and Schedule Generation Schemes
    • …