854 research outputs found

    Stochastic single machine scheduling problem as a multi-stage dynamic random decision process

    Get PDF
    In this work, we study a stochastic single machine scheduling problem in which the features of learning effect on processing times, sequence-dependent setup times, and machine configuration selection are considered simultaneously. More precisely, the machine works under a set of configurations and requires stochastic sequence-dependent setup times to switch from one configuration to another. Also, the stochastic processing time of a job is a function of its position and the machine configuration. The objective is to find the sequence of jobs and choose a configuration to process each job to minimize the makespan. We first show that the proposed problem can be formulated through two-stage and multi-stage Stochastic Programming models, which are challenging from the computational point of view. Then, by looking at the problem as a multi-stage dynamic random decision process, a new deterministic approximation-based formulation is developed. The method first derives a mixed-integer non-linear model based on the concept of accessibility to all possible and available alternatives at each stage of the decision-making process. Then, to efficiently solve the problem, a new accessibility measure is defined to convert the model into the search of a shortest path throughout the stages. Extensive computational experiments are carried out on various sets of instances. We discuss and compare the results found by the resolution of plain stochastic models with those obtained by the deterministic approximation approach. Our approximation shows excellent performances both in terms of solution accuracy and computational time

    A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

    Get PDF
    AbstractThis research focuses on a scheduling problem with multiple unavailability periods and distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness of jobs. In order to optimize the problem exactly a mathematical model is proposed. However due to computational difficulties for large instances of the considered problem a modified variable neighborhood search (VNS) is developed. In basic VNS, the searching process to achieve to global optimum or near global optimum solution is totally random, and it is known as one of the weaknesses of this algorithm. To tackle this weakness, a VNS algorithm is combined with a knowledge module. In the proposed VNS, knowledge module extracts the knowledge of good solution and save them in memory and feed it back to the algorithm during the search process. Computational results show that the proposed algorithm is efficient and effective

    Scheduling Problems with Learning and Ageing Effects: A Survey

    Get PDF
    In recent years, many papers concerning scheduling problems with simultaneous learning and ageing effects were published. In this paper, the state of the art of research concerning these problems is presented. In order to facilitate understanding this subject, the scheduling problems where these effects occur separately, are firstly explained. Then, the papers devoted to scheduling problems combining the effects of learning and ageing are discussed. Particular attention was paid on practical applications of the considered scheduling problems. After thorough analysis it turned out that both scheduling problems with learning effect, and with ageing effect, as well as, in particular, the problems with models merging learning and ageing effects do not have any reasonable real-life applications. This is because the learning and ageing effects are in general long time horizon phenomena observed in repetitive systems and scheduling theory concerns either with repetitive short-horizon planning problems or single long-horizon projects. Therefore, there is no sense to continue research considering these scheduling problems from practical (computer engineering, automatic control, technical and economical) point of view, unless such reasonable real-life example appears

    Makespan minimizing on multiple travel salesman problem with a learning effect of visiting time

    Get PDF
    -The multiple traveling salesman problem (MTSP) involves the assignment and sequencing procedure simultaneously. The assignment of a set of nodes to each visitors and determining the sequence of visiting of nodes for each visitor. Since specific range of process is needed to be carried out in nodes in commercial environment, several factors associated with routing problem are required to be taken into account. This research considers visitors’ skill and category of customers which can affect visiting time of visitors in nodes. With regard to learning-by-doing, visiting time in nodes can be reduced. And different class of customers which are determined based on their potential purchasing of power specifies that required time for nodes can be vary. So, a novel optimization model is presented to formulate MTSP, which attempts to ascertain the optimum routes for salesmen by minimizing the makespan to ensure the balance of workload of visitors. Since this problem is an NP-hard problem, for overcoming the restriction of exact methods for solving practical large-scale instances within acceptable computational times. So, Artificial Immune System (AIS) and the Firefly (FA) metaheuristic algorithm are implemented in this paper and algorithms parameters are calibrated by applying Taguchi technique. The solution methodology is assessed by an array of numerical examples and the overall performances of these metaheuristic methods are evaluated by analyzing their results with the optimum solutions to suggested problems. The results of statistical analysis by considering 95% confidence interval for calculating average relative percentage of deviation (ARPD) reveal that the solutions of proposed AIS algorithm has less variation and Its’ confidence interval of closer than to zero with no overlapping with that of FA. Although both proposed meta-heuristics are effective and efficient in solving small-scale problems, in medium and large scales problems, AIS had a better performance in a shorter average time. Finally, the applicability of the suggested pattern is implemented in a case study in a specific company, namely Kalleh

    Modeling Industrial Lot Sizing Problems: A Review

    Get PDF
    In this paper we give an overview of recent developments in the field of modeling single-level dynamic lot sizing problems. The focus of this paper is on the modeling various industrial extensions and not on the solution approaches. The timeliness of such a review stems from the growing industry need to solve more realistic and comprehensive production planning problems. First, several different basic lot sizing problems are defined. Many extensions of these problems have been proposed and the research basically expands in two opposite directions. The first line of research focuses on modeling the operational aspects in more detail. The discussion is organized around five aspects: the set ups, the characteristics of the production process, the inventory, demand side and rolling horizon. The second direction is towards more tactical and strategic models in which the lot sizing problem is a core substructure, such as integrated production-distribution planning or supplier selection. Recent advances in both directions are discussed. Finally, we give some concluding remarks and point out interesting areas for future research

    Due-Window Assignment and Scheduling with Multiple Rate-Modifying Activities under the Effects of Deterioration and Learning

    Get PDF
    This paper discusses due-window assignment and scheduling with multiple rate-modifying activities. Multiple types of rate-modifying activities are allowed to perform on a single machine. The learning effect and job deterioration are also integrated concurrently into the problem which makes the problem more realistic. The objective is to find jointly the optimal location to perform multiple rate-modifying activities, the optimal job sequence, and the optimal location and size of the due window to minimize the total earliness, tardiness, and due-window-related costs. We propose polynomial time algorithms for all the cases of the problem under study

    Single-Machine Scheduling with Learning Effects and Maintenance: A Methodological Note on Some Polynomial-Time Solvable Cases

    Get PDF
    This work addresses four single-machine scheduling problems (SMSPs) with learning effects and variable maintenance activity. The processing times of the jobs are simultaneously determined by a decreasing function of their corresponding scheduled positions and the sum of the processing times of the already processed jobs. Maintenance activity must start before a deadline and its duration increases with the starting time of the maintenance activity. This work proposes a polynomial-time algorithm for optimally solving two SMSPs to minimize the total completion time and the total tardiness with a common due date

    Application of Optimization in Production, Logistics, Inventory, Supply Chain Management and Block Chain

    Get PDF
    The evolution of industrial development since the 18th century is now experiencing the fourth industrial revolution. The effect of the development has propagated into almost every sector of the industry. From inventory to the circular economy, the effectiveness of technology has been fruitful for industry. The recent trends in research, with new ideas and methodologies, are included in this book. Several new ideas and business strategies are developed in the area of the supply chain management, logistics, optimization, and forecasting for the improvement of the economy of the society and the environment. The proposed technologies and ideas are either novel or help modify several other new ideas. Different real life problems with different dimensions are discussed in the book so that readers may connect with the recent issues in society and industry. The collection of the articles provides a glimpse into the new research trends in technology, business, and the environment

    Integrated Production and Distribution planning of perishable goods

    Get PDF
    Tese de doutoramento. Programa Doutoral em Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 201

    A new hybrid meta-heuristic algorithm for solving single machine scheduling problems

    Get PDF
    A dissertation submitted in partial ful lment of the degree of Master of Science in Engineering (Electrical) (50/50) in the Faculty of Engineering and the Built Environment Department of Electrical and Information Engineering May 2017Numerous applications in a wide variety of elds has resulted in a rich history of research into optimisation for scheduling. Although it is a fundamental form of the problem, the single machine scheduling problem with two or more objectives is known to be NP-hard. For this reason we consider the single machine problem a good test bed for solution algorithms. While there is a plethora of research into various aspects of scheduling problems, little has been done in evaluating the performance of the Simulated Annealing algorithm for the fundamental problem, or using it in combination with other techniques. Speci cally, this has not been done for minimising total weighted earliness and tardiness, which is the optimisation objective of this work. If we consider a mere ten jobs for scheduling, this results in over 3.6 million possible solution schedules. It is thus of de nite practical necessity to reduce the search space in order to nd an optimal or acceptable suboptimal solution in a shorter time, especially when scaling up the problem size. This is of particular importance in the application area of packet scheduling in wireless communications networks where the tolerance for computational delays is very low. The main contribution of this work is to investigate the hypothesis that inserting a step of pre-sampling by Markov Chain Monte Carlo methods before running the Simulated Annealing algorithm on the pruned search space can result in overall reduced running times. The search space is divided into a number of sections and Metropolis-Hastings Markov Chain Monte Carlo is performed over the sections in order to reduce the search space for Simulated Annealing by a factor of 20 to 100. Trade-o s are found between the run time and number of sections of the pre-sampling algorithm, and the run time of Simulated Annealing for minimising the percentage deviation of the nal result from the optimal solution cost. Algorithm performance is determined both by computational complexity and the quality of the solution (i.e. the percentage deviation from the optimal). We nd that the running time can be reduced by a factor of 4.5 to ensure a 2% deviation from the optimal, as compared to the basic Simulated Annealing algorithm on the full search space. More importantly, we are able to reduce the complexity of nding the optimal from O(n:n!) for a complete search to O(nNS) for Simulated Annealing to O(n(NMr +NS)+m) for the input variables n jobs, NS SA iterations, NM Metropolis- Hastings iterations, r inner samples and m sections.MT 201
    corecore