185 research outputs found

    Parallel-machine scheduling with simple linear deterioration to minimize total completion time

    Get PDF
    2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Scheduling linear deteriorating jobs with an availability constraint on a single machine

    Get PDF
    2006-2007 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    A common framework and taxonomy for multicriteria scheduling problems with Interfering and competing Jobs: Multi-agent scheduling problems

    Get PDF
    Most classical scheduling research assumes that the objectives sought are common to all jobs to be scheduled. However, many real-life applications can be modeled by considering different sets of jobs, each one with its own objective(s), and an increasing number of papers addressing these problems has appeared over the last few years. Since so far the area lacks a uni ed view, the studied problems have received different names (such as interfering jobs, multi-agent scheduling, mixed-criteria, etc), some authors do not seem to be aware of important contributions in related problems, and solution procedures are often developed without taking into account existing ones. Therefore, the topic is in need of a common framework that allows for a systematic recollection of existing contributions, as well as a clear de nition of the main research avenues. In this paper we review multicriteria scheduling problems involving two or more sets of jobs and propose an uni ed framework providing a common de nition, name and notation for these problems. Moreover, we systematically review and classify the existing contributions in terms of the complexity of the problems and the proposed solution procedures, discuss the main advances, and point out future research lines in the topic

    Single-Machine Scheduling with Aging Effects and Optional Maintenance Activity Considerations

    Get PDF
    This paper explores a single-machine scheduling with aging effects and the problem regarding optional maintenance activity assignment. The jobs’ processing time is assumed to follow a power position-dependent aging model. The optional maintenance activity refers to the situation in which the maintenance activity can be scheduled immediately after processing of any job has been completed except for the last job and the duration of maintenance activity can be of any value from zero to a fixed time interval. A recovery function is proposed to reflect the efficiency of the machine or worker which is improved. The objective of this study is to decide whether and when to implement the maintenance activity into the job sequence, how long the duration of maintenance activity is, and how to schedule so as to minimize the makespan. Once the duration of maintenance activity is known, we introduce an efficient solution for this problem. In addition, when the maintenance activity is completely performed, we showed that the optimal policy is to schedule the maintenance activity in the middle of the task sequence and optimally solved it by lower order algorithm. Finally, we extend the problem to the case of multiple maintenance activities which are completely performed. Hence, the problem is regarded as polynomial time solvable

    A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

    Get PDF
    AbstractThis research focuses on a scheduling problem with multiple unavailability periods and distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness of jobs. In order to optimize the problem exactly a mathematical model is proposed. However due to computational difficulties for large instances of the considered problem a modified variable neighborhood search (VNS) is developed. In basic VNS, the searching process to achieve to global optimum or near global optimum solution is totally random, and it is known as one of the weaknesses of this algorithm. To tackle this weakness, a VNS algorithm is combined with a knowledge module. In the proposed VNS, knowledge module extracts the knowledge of good solution and save them in memory and feed it back to the algorithm during the search process. Computational results show that the proposed algorithm is efficient and effective

    Optimization of job shop scheduling with material handling by automated guided vehicle

    Get PDF
    Job Shop Scheduling with Material Handling has attracted increasing attention in both industry and academia, especially with the inception of Industry 4.0 and smart manufacturing. A smart manufacturing system calls for efficient and effective production planning. On a typical modern shop floor, jobs of various types follow certain processing routes through machines or work centers, and automated guided vehicles (AGVs) are utilized to handle the jobs. In this research, the optimization of a shop floor with AGV is carried out, and we also consider the planning scenario under variable processing time of jobs. The goal is to minimize the shop floor production makespan or other specific criteria correlated with makespan, by scheduling the operations of job processing and routing the AGVs. This dissertation includes three research studies that will constitute my doctoral work. In the first study, we discuss a simplified case in which the scheduling problem is reformulated into a vehicle dispatching (assignment) problem. A few AGV dispatching strategies are proposed based on the deterministic optimization of network assignment problems. The AGV dispatching strategies take future transportation requests into consideration and optimally configure transportation resources such that material handling can be more efficient than those adopting classic AGV assignment rules in which only the current request is considered. The strategies are demonstrated and validated with a case study based on a shop floor in literature and compared to classic AGV assignment rules. The results show that AGV dispatching with adoption of the proposed strategy has better performance on some specific criterions like minimizing job waiting time. In the second study, an efficient heuristic algorithm for classic Job Shop Scheduling with Material Handling is proposed. Typically, the job shop scheduling problem and material handling problem are studied separately due to the complexity of both problems. However, considering these two types of decisions in the same model offers benefits since the decisions are related to each other. In this research, we aim to study the scheduling of job operations together with the AGV routing/scheduling, and a formulation as well as solution techniques are proposed. The proposed heuristic algorithm starts from an optimal job shop scheduling solution without limiting the size of AGV fleet, and iteratively reduces the number of available vehicles until the fleet size is equal to the original requirements. The computational experiments suggest that compared to existing solution techniques in literature, the proposed algorithm can achieve comparable solution quality on makespan with much higher computational efficiency. In the third study, we take the variability of processing time into consideration in optimizing job shop scheduling with material handling. Variability caused by random effects and deterioration is discussed, and a series of models are developed to accommodate random and deteriorating processing time respectively. With random processing time, the model is formulated as a Stochastic Programming Job Shop Scheduling with Material Handling model, and with deteriorating processing time the model can be nonlinear under specific deteriorating functions. Based on a widely adopted dataset in existing literature, the stochastic programming model were solved with Pyomo, and models with deterioration were linearized and solved with CPLEX. By considering variable processing time, the JSSMH models can better adapt to real production scenarios

    Common due date early

    Get PDF
    Ankara : The Department of Industrial Engineering and the Graduate School of Engineering and Science of Bilkent University, 2013.Thesis (Master's) -- Bilkent University, 2013.Includes bibliographical references leaves 91-96.This study considers a scheduling problem with position-dependent deteriorating jobs and a maintenance activity in a single machine. Even in the absence of maintenance activity and deterioration problem is NP-hard. A solution comprises the following: (i) positions of jobs, (ii) the position of the maintenance activity, (iii) starting time of the first job in the schedule. After the maintenance activity, machine will revert to its initial condition and deterioration will start anew. The objective is to minimize the total weighted earliness and tardiness costs. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. Polynomial (O(n log n)) time solutions are provided for some special cases. No polynomial solution exists for instances with tight due-dates. We propose a mixed integer programming model and efficient algorithms for the cases where mathematical formulation is not efficient in terms of computational time requirements. Computational results show that the proposed algorithms perform well in terms of both solution quality and computation time.Şirvan, FatmaM.S

    Order Acceptance and Scheduling: A Taxonomy and Review

    Get PDF
    Over the past 20 years, the topic of order acceptance has attracted considerable attention from those who study scheduling and those who practice it. In a firm that strives to align its functions so that profit is maximized, the coordination of capacity with demand may require that business sometimes be turned away. In particular, there is a trade-off between the revenue brought in by a particular order, and all of its associated costs of processing. The present study focuses on the body of research that approaches this trade-off by considering two decisions: which orders to accept for processing, and how to schedule them. This paper presents a taxonomy and a review of this literature, catalogs its contributions and suggests opportunities for future research in this area
    corecore