    Scheduling of Early Quantum Tasks

    Get PDF
    An Early Quantum Task (EQT) is a Quantum EDF task that has shrunk its first period into one quantum time slot. Its purpose is to be executed as soon as possible, without causing deadline overflow of other tasks. We will derive the conditions under which an EQT can be admitted and can have an immediate start. The advantage of scheduling EQTs is shown by its use in a buffered multi-media server. The EQT is associated with a multimedia stream and it will use its first invocation to fill the buffer, such that a client can start receiving data immediately

    The Lazy Bureaucrat Scheduling Problem

    Full text link
    We introduce a new class of scheduling problems in which the optimization is performed by the worker (single ``machine'') who performs the tasks. A typical worker's objective is to minimize the amount of work he does (he is ``lazy''), or more generally, to schedule as inefficiently (in some sense) as possible. The worker is subject to the constraint that he must be busy when there is work that he can do; we make this notion precise both in the preemptive and nonpreemptive settings. The resulting class of ``perverse'' scheduling problems, which we denote ``Lazy Bureaucrat Problems,'' gives rise to a rich set of new questions that explore the distinction between maximization and minimization in computing optimal schedules.Comment: 19 pages, 2 figures, Latex. To appear, Information and Computatio

    On the periodic behavior of real-time schedulers on identical multiprocessor platforms

    Full text link
    This paper is proposing a general periodicity result concerning any deterministic and memoryless scheduling algorithm (including non-work-conserving algorithms), for any context, on identical multiprocessor platforms. By context we mean the hardware architecture (uniprocessor, multicore), as well as task constraints like critical sections, precedence constraints, self-suspension, etc. Since the result is based only on the releases and deadlines, it is independent from any other parameter. Note that we do not claim that the given interval is minimal, but it is an upper bound for any cycle of any feasible schedule provided by any deterministic and memoryless scheduler

    Scheduling Algorithms for Procrastinators

    Full text link
    This paper presents scheduling algorithms for procrastinators, where the speed that a procrastinator executes a job increases as the due date approaches. We give optimal off-line scheduling policies for linearly increasing speed functions. We then explain the computational/numerical issues involved in implementing this policy. We next explore the online setting, showing that there exist adversaries that force any online scheduling policy to miss due dates. This impossibility result motivates the problem of minimizing the maximum interval stretch of any job; the interval stretch of a job is the job's flow time divided by the job's due date minus release time. We show that several common scheduling strategies, including the "hit-the-highest-nail" strategy beloved by procrastinators, have arbitrarily large maximum interval stretch. Then we give the "thrashing" scheduling policy and show that it is a \Theta(1) approximation algorithm for the maximum interval stretch.Comment: 12 pages, 3 figure

    Throughput Maximization in the Speed-Scaling Setting

    Get PDF
    We are given a set of nn jobs and a single processor that can vary its speed dynamically. Each job JjJ_j is characterized by its processing requirement (work) pjp_j, its release date rjr_j and its deadline djd_j. We are also given a budget of energy EE and we study the scheduling problem of maximizing the throughput (i.e. the number of jobs which are completed on time). We propose a dynamic programming algorithm that solves the preemptive case of the problem, i.e. when the execution of the jobs may be interrupted and resumed later, in pseudo-polynomial time. Our algorithm can be adapted for solving the weighted version of the problem where every job is associated with a weight wjw_j and the objective is the maximization of the sum of the weights of the jobs that are completed on time. Moreover, we provide a strongly polynomial time algorithm to solve the non-preemptive unweighed case when the jobs have the same processing requirements. For the weighted case, our algorithm can be adapted for solving the non-preemptive version of the problem in pseudo-polynomial time.Comment: submitted to SODA 201

    Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput

    Full text link
    We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We provide an O(n^4)-time algorithm for this problem, improving the previous bound of O(n^{10}) by Baptiste.Comment: gained one author and lost one degree in the complexit