2,118 research outputs found

    Using real-time information to reschedule jobs in a flowshop with variable processing times

    Get PDF
    Versión revisada. Embargo 36 mesesIn a time where detailed, instantaneous and accurate information on shop-floor status is becoming available in many manufacturing companies due to Information Technologies initiatives such as Smart Factory or Industry 4.0, a question arises regarding when and how this data can be used to improve scheduling decisions. While it is acknowledged that a continuous rescheduling based on the updated information may be beneficial as it serves to adapt the schedule to unplanned events, this rather general intuition has not been supported by a thorough experimentation, particularly for multi-stage manufacturing systems where such continuous rescheduling may introduce a high degree of nervousness in the system and deteriorates its performance. In order to study this research problem, in this paper we investigate how real-time information on the completion times of the jobs in a flowshop with variable processing times can be used to reschedule the jobs. In an exhaustive computational experience, we show that rescheduling policies pay off as long as the variability of the processing times is not very high, and only if the initially generated schedule is of good quality. Furthermore, we propose several rescheduling policies to improve the performance of continuous rescheduling while greatly reducing the frequency of rescheduling. One of these policies, based on the concept of critical path of a flowshop, outperforms the rest of policies for a wide range of scenarios.Ministerio de Ciencia e Innovación DPI2016-80750-

    A simheuristic algorithm for solving an integrated resource allocation and scheduling problem

    Get PDF
    Modern companies have to face challenging configuration issues in their manufacturing chains. One of these challenges is related to the integrated allocation and scheduling of resources such as machines, workers, energy, etc. These integrated optimization problems are difficult to solve, but they can be even more challenging when real-life uncertainty is considered. In this paper, we study an integrated allocation and scheduling optimization problem with stochastic processing times. A simheuristic algorithm is proposed in order to effectively solve this integrated and stochastic problem. Our approach relies on the hybridization of simulation with a metaheuristic to deal with the stochastic version of the allocation-scheduling problem. A series of numerical experiments contribute to illustrate the efficiency of our methodology as well as their potential applications in real-life enterprise settings

    Design and Analysis of an Estimation of Distribution Approximation Algorithm for Single Machine Scheduling in Uncertain Environments

    Full text link
    In the current work we introduce a novel estimation of distribution algorithm to tackle a hard combinatorial optimization problem, namely the single-machine scheduling problem, with uncertain delivery times. The majority of the existing research coping with optimization problems in uncertain environment aims at finding a single sufficiently robust solution so that random noise and unpredictable circumstances would have the least possible detrimental effect on the quality of the solution. The measures of robustness are usually based on various kinds of empirically designed averaging techniques. In contrast to the previous work, our algorithm aims at finding a collection of robust schedules that allow for a more informative decision making. The notion of robustness is measured quantitatively in terms of the classical mathematical notion of a norm on a vector space. We provide a theoretical insight into the relationship between the properties of the probability distribution over the uncertain delivery times and the robustness quality of the schedules produced by the algorithm after a polynomial runtime in terms of approximation ratios

    A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty

    Get PDF
    [EN] Stochastic, as well as fuzzy uncertainty, can be found in most real-world systems. Considering both types of uncertainties simultaneously makes optimization problems incredibly challenging. In this paper, we analyze the permutation flow shop problem (PFSP) with both stochastic and fuzzy processing times. The main goal is to find the solution (permutation of jobs) that minimizes the expected makespan. However, due to the existence of uncertainty, other characteristics of the solution are also taken into account. In particular, we illustrate how survival analysis can be employed to enrich the probabilistic information given to decision-makers. To solve the aforementioned optimization problem, we extend the concept of a simheuristic framework so it can also include fuzzy elements. Hence, both stochastic and fuzzy uncertainty are simultaneously incorporated in the PFSP. In order to test our approach, classical PFSP instances have been adapted and extended, so that processing times become either stochastic or fuzzy. The experimental results show the effectiveness of the proposed approach when compared with more traditional ones.This work has been partially supported by the Spanish Ministry of Science (PID2019111100RB-C21/AEI/10.13039/501100011033), as well as by the Barcelona Council and the "la Caixa" Foundation under the framework of the Barcelona Science Plan 2020-2023 (grant 21S09355-001).Castaneda, J.; Martín, XA.; Ammouriova, M.; Panadero, J.; Juan-Pérez, ÁA. (2022). A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty. Mathematics. 10(10):1-17. https://doi.org/10.3390/math10101760117101

    BALANCING TRADE-OFFS IN ONE-STAGE PRODUCTION WITH PROCESSING TIME UNCERTAINTY

    Get PDF
    Stochastic production scheduling faces three challenges, first the inconsistencies among key performance indicators (KPIs), second the trade-offs between the expected return and the risk for a portfolio of KPIs, and third the uncertainty in processing times. Based on two inconsistent KPIs of total completion time (TCT) and variance of completion times (VCT), we propose our trade-off balancing (ToB) heuristic for one-stage production scheduling. Through comprehensive case studies, we show that our ToB heuristic with preference =0.0:0.1:1.0 efficiently and effectively addresses the three challenges. Moreover, our trade-off balancing scheme can be generalized to balance a number of inconsistent KPIs more than two. Daniels and Kouvelis (DK) proposed a scheme to optimize the worst-case scenario for stochastic production scheduling and proposed the endpoint product (EP) and endpoint sum (ES) heuristics to hedge against processing time uncertainty. Using 5 levels of coefficients of variation (CVs) to represent processing time uncertainty, we show that our ToB heuristic is robust as well, and even outperforms the EP and ES heuristics on worst-case scenarios at high levels of processing time uncertainty. Moreover, our ToB heuristic generates undominated solution spaces of KPIs, which not only provides a solid base to set up specification limits for statistical process control (SPC) but also facilitates the application of modern portfolio theory and SPC techniques in the industry

    Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study

    Get PDF
    The technological advances recently brought to the manufacturing arena (collectively known as Industry 4.0) offer huge possibilities to improve decision-making processes in the shop floor by enabling the integration of information in real-time. Among these processes, scheduling is often cited as one of the main beneficiaries, given its data-intensive and dynamic nature. However, in view of the extremely high implementation costs of Industry 4.0, these potential benefits should be properly assessed, also taking into account that there are different approaches and solution procedures that can be employed in the scheduling decision-making process, as well as several information sources (i.e. not only shop floor status data, but also data from upstream/downstream processes). In this paper, we model various decision-making scenarios in a shop floor with different degrees of uncertainty and diverse efficiency measures, and carry out a computational experience to assess how real-time and advance information can be advantageously integrated in the Industry 4.0 context. The extensive computational experiments (equivalent to 6.3 years of CPU time) show that the benefits of using real-time, integrated shop floor data and advance information heavily depend on the proper choice of both the scheduling approach and the solution procedures, and that there are scenarios where this usage is even counterproductive. The results of the paper provide some starting points for future research regarding the design of approaches and solution procedures that allow fully exploiting the technological advances of Industry 4.0 for decision-making in scheduling.Ministerio de Ciencia e Innovación PID2019-108756RB-I0Junta de Andalucía P18-FR-1149, 5835 and US-12645

    Métaheuristiques pour le flow-shop de permutation bi-objectif stochastique

    Get PDF
    International audienceAlthough evolutionary algorithms are commonly used for solving multi-objective problems on the one hand and stochastic problems on the other hand, very few studies have investigated these two aspects simultaneously. For instance, scheduling problems are usually tackled in a single-objective deterministic form, whereas they are clearly multi-objective and they are subject to a wide range of uncertainty. In this paper, we present different approaches to solve stochastic multi-objective optimization problems and apply them to a bi-objective permutation flow-shop scheduling problem with random processing times.Bien que les algorithmes évolutionnaires soient couramment utilisés pour résoudre des problèmes multi-objectifs d'une part, et stochastiques d'autre part, très peu de travaux ont été menés sur ces deux aspects simultanément. Par exemple, les problèmes d'ordonnancement sont habituellement traités sous une forme mono-objectif déterministe, alors qu'ils sont clairement multi-objectifs et qu'ils sont soumis à de nombreux facteurs d'incertitude. Dans cet article, nous présentons différentes approches pour résoudre des problèmes d'optimisation multi-objectif stochastiques et les appliquons à un problème d'ordonnancement de type flow-shop de permutation bi-objectif avec durées d'exécution aléatoires