59,498 research outputs found

    Flexible resources allocation techniques: characteristics and modelling

    Get PDF
    At the interface between engineering, economics, social sciences and humanities, industrial engineering aims to provide answers to various sectors of business problems. One of these problems is the adjustment between the workload needed by the work to be realised and the availability of the company resources. The objective of this work is to help to find a methodology for the allocation of flexible human resources in industrial activities planning and scheduling. This model takes into account two levers of flexibility, one related to the working time modulation, and the other to the varieties of tasks that can be performed by a given resource (multi–skilled actor). On the one hand, multi–skilled actors will help to guide the various choices of the allocation to appreciate the impact of these choices on the tasks durations. On the other hand, the working time modulation that allows actors to have a work planning varying according to the workload which the company has to face

    Specification of vertical semantic consistency rules of UML class diagram refinement using logical approach

    Get PDF
    Unified Modelling Language (UML) is the most popular modelling language use for software design in software development industries with a class diagram being the most frequently use diagram. Despite the popularity of UML, it is being affected by inconsistency problems of its diagrams at the same or different abstraction levels. Inconsistency in UML is mostly caused by existence of various views on the same system and sometimes leads to potentially conflicting system specifications. In general, syntactic consistency can be automatically checked and therefore is supported by current UML Computer-aided Software Engineering (CASE) tools. Semantic consistency problems, unlike syntactic consistency problems, there exists no specific method for specifying semantic consistency rules and constraints. Therefore, this research has specified twenty-four abstraction rules of class‟s relation semantic among any three related classes of a refined class diagram to semantically equivalent relations of two of the classes using a logical approach. This research has also formalized three vertical semantic consistency rules of a class diagram refinement identified by previous researchers using a logical approach and a set of formalized abstraction rules. The results were successfully evaluated using hotel management system and passenger list system case studies and were found to be reliable and efficient

    Inhibitors to optimal project portfolio selection

    Get PDF
    The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance

    The 1990 progress report and future plans

    Get PDF
    This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers

    Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    Get PDF
    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques

    Design choices for agent-based control of AGVs in the dough making process

    Get PDF
    In this paper we consider a multi-agent system (MAS) for the logistics control of Automatic Guided Vehicles (AGVs) that are used in the dough making process at an industrial bakery. Here, logistics control refers to constructing robust schedules for all transportation jobs. The paper discusses how alternative MAS designs can be developed and compared using cost, frequency of messages between agents, and computation time for evaluating control rules as performance indicators. Qualitative design guidelines turn out to be insufficient to select the best agent architecture. Therefore, we also use simulation to support decision making, where we use real-life data from the bakery to evaluate several alternative designs. We find that architectures in which line agents initiate allocation of transportation jobs, and AGV agents schedule multiple jobs in advance, perform best. We conclude by discussing the benefits of our MAS systems design approach for real-life applications

    Decision-based genetic algorithms for solving multi-period project scheduling with dynamically experienced workforce

    Get PDF
    The importance of the flexibility of resources increased rapidly with the turbulent changes in the industrial context, to meet the customers’ requirements. Among all resources, the most important and considered as the hardest to manage are human resources, in reasons of availability and/or conventions. In this article, we present an approach to solve project scheduling with multi-period human resources allocation taking into account two flexibility levers. The first is the annual hours and working time regulation, and the second is the actors’ multi-skills. The productivity of each operator was considered as dynamic, developing or degrading depending on the prior allocation decisions. The solving approach mainly uses decision-based genetic algorithms, in which, chromosomes don’t represent directly the problem solution; they simply present three decisions: tasks’ priorities for execution, actors’ priorities for carrying out these tasks, and finally the priority of working time strategy that can be considered during the specified working period. Also the principle of critical skill was taken into account. Based on these decisions and during a serial scheduling generating scheme, one can in a sequential manner introduce the project scheduling and the corresponding workforce allocations

    School librarianship in Canada: An introduction

    Get PDF

    Formalisation and use of competencies for industrial performance optimisation : a survey.

    Get PDF
    For many years, industrial performance has been implicitly considered as deriving from the optimisation of technological and material resources (machines, inventories,...), made possible by centralized organisations. The topical requirements for reactive and flexible industrial systems have progressively reintroduced the human workforce as the main source of industrial performance. Making this paradigm operational requires the identification and careful formalisation of the link between human resource and industrial performance, through concepts like skills, competencies or know-how. This paper provides a general survey of the formalisation and integration of competence-oriented concepts within enterprise information systems and decision systems, aiming at providing new methods and tools for performance management

    Integrating BIM and Planning Software for Health and Safety Site Induction

    Get PDF
    Project management software packages have been around for quite a long time to help managers to run construction projects effectively. Building Information Modelling – also known as Object-orientated Modelling technology was used at the beginning in architectural design which has become more widespread in structural and services engineering. The development of BIM modelling has made the tool more users friendly. As a result, BIM became widely used by most practitioners in their specialist areas. For health and safety practitioners within construction project management, This tool has not been fully explored. BIM technology has the potential to be used in safety planning procedures particularly those related to tasks on construction sites. The section of the research presented in this paper intend to explore and review health and safety issues on construction site with the sole intension of using better visualisation software to meet the needs of health and safety site practitioners in understanding such H&S problems. A framework needed for better H&S practice on site that may be used actively by all practitioners will be developed. The intension is to find a way forward in addressing ‘real’ health and safety site issues that may not be easy to be understood by practitioners without the full aid of visualisation. Keywords: Health, Safety, construction site, BIM, 4D Modellin
    • 

    corecore