    Research Trends and Outlooks in Assembly Line Balancing Problems

    Get PDF
    This paper presents the findings from the survey of articles published on the assembly line balancing problems (ALBPs) during 2014-2018. Before proceeding a comprehensive literature review, the ineffectiveness of the previous ALBP classification structures is discussed and a new classification scheme based on the layout configurations of assembly lines is subsequently proposed. The research trend in each layout of assembly lines is highlighted through the graphical presentations. The challenges in the ALBPs are also pinpointed as a technical guideline for future research works

    Balancing of parallel U-shaped assembly lines

    Get PDF
    Copyright © 2015 Elsevier. This is a PDF file of an unedited manuscript that has been accepted for publication in Computers & Operations Research (doi: 10.1016/j.cor.2015.05.014). As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting galley proof before it is published in its final citable form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain. Please cite this article as: Ibrahim Kucukkoc, David Z. Zhang, Balancing of parallel U-shaped assembly Lines, Computers & Operations Research, http://dx.doi.org/10.1016/j.cor.2015.05.014A new hybrid assembly line design, called Parallel U-shaped Assembly Line system, is introduced and characterised along with numerical examples for the first time. Different from existing studies on U-shaped lines, we combine the advantages of two individual line configurations (namely parallel lines and U-shaped lines) and create an opportunity for assigning tasks to multi-line workstations located in between two adjacent U-shaped lines with the aim of maximising resource utilisation. Utilisation of crossover workstations, in which tasks from opposite areas of a same U-shaped line can be performed, is also one of the main advantages of the U-shaped lines. As in traditional U-shaped line configurations, the newly proposed line configuration also supports the utilisation of crossover workstations. An efficient heuristic algorithm is developed to find well-balanced solutions for the proposed line configurations. Test cases derived from existing studies and modified in accordance with the proposed system in this study are solved using the proposed heuristic algorithm. The comparison of results obtained when the lines are balanced independently and when the lines are balanced together (in parallel to each other) clearly indicates that the parallelisation of U-shaped lines helps decrease the need for workforce significantly.Balikesir UniversityTurkish Council of Higher Educatio

    Type-E Parallel Two-Sided Assembly Line Balancing Problem: Mathematical Model and Ant Colony Optimisation based Approach with Optimised Parameters

    Get PDF
    Copyright © 2015 Elsevier. This is a PDF file of an unedited manuscript that has been accepted for publication in Computers and Industrial Engineering (doi:10.1016/j.cie.2014.12.037). The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.There are many factors which affect the performance of a complex production system. Efficiency of an assembly line is one of the most important of these factors since assembly lines are generally constructed as the last stage of an entire production system. Parallel two-sided assembly line system is a new research domain in academia though these lines have been utilised to produce large sized products such as automobiles, trucks, and buses in industry for many years. Parallel two-sided assembly lines carry practical advantages of both parallel assembly lines and two-sided assembly lines. The main purpose of this paper is to introduce type-E parallel two-sided assembly line balancing problem for the first time in the literature and to propose a new ant colony optimisation based approach for solving the problem. Different from the existing studies on parallel assembly line balancing problems in the literature, this paper aims to minimise two conflicting objectives, namely cycle time and number of workstations at the same time and proposes a mathematical model for the formal description of the problem. To the best of our knowledge, this is the first study which addresses both conflicting objectives on a parallel two-sided assembly line configuration. The developed ant colony optimisation algorithm is illustrated with an example to explain its procedures. An experimental design is also conducted to calibrate the parameters of the proposed algorithm using response surface methodology. Results obtained from the performed computational study indicate that minimising cycle time as well as number of workstations help increase system efficiency. It is also observed that the proposed algorithm finds promising results for the studied cases of type-E parallel two-sided assembly line balancing problem when the results are compared with those obtained from other three well-known heuristics

    A mathematical model and genetic algorithm-based approach for parallel two-sided assembly line balancing problem

    Get PDF
    Copyright © 2015 Taylor & Francis. This is an Accepted Manuscript of an article published by Taylor & Francis in Production Planning & Control on 27 April 2015, available online: http://dx.doi.org/10.1080/09537287.2014.994685Assembly lines are usually constructed as the last stage of the entire production system and efficiency of an assembly line is one of the most important factors which affect the performance of a complex production system. The main purpose of this paper is to mathematically formulate and to provide an insight for modelling the parallel two-sided assembly line balancing problem, where two or more two-sided assembly lines are constructed in parallel to each other. We also propose a new genetic algorithm (GA)-based approach in alternatively to the existing only solution approach in the literature, which is a tabu search algorithm. To the best of our knowledge, this is the first formal presentation of the problem as well as the proposed algorithm is the first attempt to solve the problem with a GA-based approach in the literature. The proposed approach is illustrated with an example to explain the procedures of the algorithm. Test problems are solved and promising results are obtained. Statistical tests are designed to analyse the advantage of line parallelisation in two-sided assembly lines through obtained test results. The response of the overall system to the changes in the cycle times of the parallel lines is also analysed through test problems for the first time in the literature

    Mixed-model parallel two-sided assembly line balancing problem: A flexible agent-based ant colony optimization approach

    Get PDF
    This is the author accepted manuscript. The final version is available from the publisher via the DOI in this record.Assembly lines are frequently used as a production method to assemble complex products. Two-sided assembly lines are utilized to assemble large-sized products (e.g., cars, buses, trucks). Locating two lines in parallel helps improve line efficiency by enabling collaboration between the line workers. This paper proposes a mixed-model parallel two-sided assembly line system that can be utilized to produce large-sized items in an inter-mixed sequence. The mixed-model parallel two-sided line balancing problem is defined and the advantages of utilizing multi-line stations across the lines are discussed. A flexible agent-based ant colony optimization algorithm is developed to solve the problem and a numerical example is given to explain the method systematically. The proposed algorithm builds flexible balancing solutions suitable for any model sequence launched. The dynamically changing workloads of workstations (based on specific product models during the production process) are also explored. A comprehensive experimental study is conducted and the results are statistically analyzed using the well-known paired sample t-test. The test results indicate that the mixed-model parallel two-sided assembly line system reduces the workforce need in comparison with separately balanced mixed-model two-sided lines. It is also shown that the proposed algorithm outperforms the tabu search algorithm and six heuristics often used in the assembly line balancing domain

    Tabu Search Algorithm for Single and Multi-model Line Balancing Problems

    Get PDF
    This paper deals with the assembly line balancing issue. The considered objective is to minimize the weighted sum of products’ cycle times. The originality of this objective is that it is the generalization of the cycle time minimization used in single-model lines (SALBP) to the multi-model case (MALBP). An optimization algorithm made of a heuristic and a tabu-search method is presented and evaluated through an experimental study carried out on several and various randomly generated instances for both the single and multiproduct cases. The returned solutions are compared to optimal solutions given by a mathematical model from the literature and to a proposed lower bound inspired from the classical SALBP bound. The results show that the algorithm is high performing as the average relative gap between them is quite low for both problems

    A geometrical model for managing surface productivity of U-Shaped assembly lines

    Get PDF
    U-Shaped Assembly Lines (U-SALs) are cellular manufacturing systems that, among other things, provide a remarkable feature for industrial cost efficiency: their effectiveness in space utilization. While the challenge of machine placement for labour productivity optimization is widely studied in the literature, surface productivity optimization has been scarcely explored. This paper proposes an industry-validated geometrical model for optimizing U-SAL surface productivity. The model links the drivers for market, product and process with the geometrical design. Managers and lean practitioners can use this approach to make decisions for layout design. The model is particularly useful in cases where the cost of floor space is substantially high.Peer ReviewedPostprint (author's final draft

    Modelling and Solving Mixed-model Parallel Two-sided Assembly Line Problems

    Get PDF
    The global competitive environment and the growing demand for personalised products have increased the interest of companies in producing similar product models on the same assembly line. Companies are forced to make significant structural changes to rapidly respond to diversified demands and convert their existing single-model lines into mixed-model lines in order to avoid unnecessary new line construction cost for each new product model. Mixed-model assembly lines play a key role in increasing productivity without compromising quality for manufacturing enterprises. The literature is extensive on assembling small-sized products in an intermixed sequence and assembling large-sized products in large volumes on single-model lines. However, a mixed-model parallel two-sided line system, where two or more similar products or similar models of a large-sized product are assembled on each of the parallel two-sided lines in an intermixed sequence, has not been of interest to academia so far. Moreover, taking model sequencing problem into consideration on a mixed-model parallel two-sided line system is a novel research topic in this domain. Within this context, the problem of simultaneous balancing and sequencing of mixed-model parallel two-sided lines is defined and described using illustrative examples for the first time in the literature. The mathematical model of the problem is also developed to exhibit the main characteristics of the problem and to explore the logic underlying the algorithms developed. The benefits of utilising multi-line stations between two adjacent lines are discussed and numerical examples are provided. An agent-based ant colony optimisation algorithm (called ABACO) is developed to obtain a generic solution that conforms to any model sequence and it is enhanced step-by-step to increase the quality of the solutions obtained. Then, the algorithm is modified with the integration of a model sequencing procedure (where the modified version is called ABACO/S) to balance lines by tracking the product model changes on each workstation in a complex production environment where each of the parallel lines may a have different cycle time. Finally, a genetic algorithm based model sequencing mechanism is integrated to the algorithm to increase the robustness of the obtained solutions. Computational tests are performed using test cases to observe the performances of the developed algorithms. Statistical tests are conducted through obtained results and test results establish that balancing mixed-model parallel two-sided lines together has a significant effect on the sought performance measures (a weighted summation of line length and the number of workstations) in comparison with balancing those lines separately. Another important finding of the research is that considering model sequencing problem along with the line balancing problem helps algorithm find better line balances with better performance measures. The results also indicate that the developed ABACO and ABACO/S algorithms outperform other test heuristics commonly used in the literature in solving various line balancing problems; and integrating a genetic algorithm based model sequencing mechanism into ABACO/S helps the algorithm find better solutions with less amount of computational effort

    Time and space multi-manned assembly line balancing problem using genetic algorithm

    Get PDF
    Purpose: Time and Space assembly line balancing problem (TSALBP) is the problem of balancing the line taking the area required by the task and to store the tools into consideration. This area is important to be considered to minimize unplanned traveling distance by the workers and consequently unplanned time waste. Although TSALBP is a realistic problem that express the real-life situation, and it became more practical to consider multi-manned assembly line to get better space utilization, few literatures addressed the problem of time and space in simple assembly line and only one in multi-manned assembly line. In this paper the problem of balancing bi-objective time and space multi-manned assembly line is proposed Design/methodology/approach: Hybrid genetic algorithm under time and space constraints besides assembly line conventional constraints is used to model this problem. The initial population is generated based on conventional assembly line heuristic added to random generations. The objective of this model is to minimize number of workers and number of stations. Findings: The results showed the effectiveness of the proposed model in solving multi-manned time and space assembly line problem. The proposed method gets better results in solving real-life Nissan problem compared to the literature. It is also found that there is a relationship between the variability of task time, maximum task time and cycle time on the solution of the problem. In some problem features it is more appropriate to solve the problem as simple assembly line than multi-manned assembly line. Originality/value: It is the first article to solve the problem of balancing multi-manned assembly line under time and area constraint using genetic algorithm. A relationship between the problem features and the solution is found according to it, the solution method (one sided or multi-manned) is definedPeer Reviewe

    Assembly Line

    Get PDF
    An assembly line is a manufacturing process in which parts are added to a product in a sequential manner using optimally planned logistics to create a finished product in the fastest possible way. It is a flow-oriented production system where the productive units performing the operations, referred to as stations, are aligned in a serial manner. The present edited book is a collection of 12 chapters written by experts and well-known professionals of the field. The volume is organized in three parts according to the last research works in assembly line subject. The first part of the book is devoted to the assembly line balancing problem. It includes chapters dealing with different problems of ALBP. In the second part of the book some optimization problems in assembly line structure are considered. In many situations there are several contradictory goals that have to be satisfied simultaneously. The third part of the book deals with testing problems in assembly line. This section gives an overview on new trends, techniques and methodologies for testing the quality of a product at the end of the assembling line
    • …
    corecore