Diversity in virtual reality landscape modelling
This paper examines the range of decisions that landscape architects need to consider in communicating the future of the landscape. The objective of this research paper was to investigate the issues affecting the landscape modelling process. It also aimed to provide a better understanding of the creators of landscape visualisations and the role they play in determining what audiences, often from many disciplines, see and debate. Interviews were conducted to gather ideas from practice and academia. The paper acknowledges that this was a limited exploration with the intention of establishing a base for a further study. Issues relating to the diversity of audiences, diversity of interpretation, appropriate levels of representation and representing the passage of time in VR models and technologies currently available for VR modelling were the focus of the interviews
Tracking of secondary and temporary objects in structural concrete work
Previous research has shown that “Scan-vs-BIM ” object recognition systems, that fuse 3D point clouds from Terrestrial Laser Scanning (TLS) or digital photogrammetry with 4D project BIM, provide valuable information for tracking structural works. However, until now, the potential of these systems has been demonstrated for tracking progress of permanent structures only; no work has been reported yet on tracking secondary or temporary structures. For structural concrete work, temporary structures include formwork, scaffolding and shoring, while secondary components include rebar. Together, they constitute most of the earned value in concrete work. The impact of tracking such elements would thus be added veracity and detail to earned value calculations, and subsequently better project control and performance. This paper presents three different techniques for recognizing concrete construction secondary and temporary objects in TLS point clouds. Two of the techniques are tested using real-life data collected from a reinforced concrete building construction site. The preliminary experimental results show that it is feasible to recognize secondary and temporary objects in TLS point clouds with good accuracy; but it is envisaged that superior results could be achieved by using additional cues such colour and 3D edge information
Geospatial Data Management Research: Progress and Future Directions
Without geospatial data management, today´s challenges in big data applications such as earth observation, geographic information system/building information modeling (GIS/BIM) integration, and 3D/4D city planning cannot be solved. Furthermore, geospatial data management plays a connecting role between data acquisition, data modelling, data visualization, and data analysis. It enables the continuous availability of geospatial data and the replicability of geospatial data analysis. In the first part of this article, five milestones of geospatial data management research are presented that were achieved during the last decade. The first one reflects advancements in BIM/GIS integration at data, process, and application levels. The second milestone presents theoretical progress by introducing topology as a key concept of geospatial data management. In the third milestone, 3D/4D geospatial data management is described as a key concept for city modelling, including subsurface models. Progress in modelling and visualization of massive geospatial features on web platforms is the fourth milestone which includes discrete global grid systems as an alternative geospatial reference framework. The intensive use of geosensor data sources is the fifth milestone which opens the way to parallel data storage platforms supporting data analysis on geosensors. In the second part of this article, five future directions of geospatial data management research are presented that have the potential to become key research fields of geospatial data management in the next decade. Geo-data science will have the task to extract knowledge from unstructured and structured geospatial data and to bridge the gap between modern information technology concepts and the geo-related sciences. Topology is presented as a powerful and general concept to analyze GIS and BIM data structures and spatial relations that will be of great importance in emerging applications such as smart cities and digital twins. Data-streaming libraries and “in-situ” geo-computing on objects executed directly on the sensors will revolutionize geo-information science and bridge geo-computing with geospatial data management. Advanced geospatial data visualization on web platforms will enable the representation of dynamically changing geospatial features or moving objects’ trajectories. Finally, geospatial data management will support big geospatial data analysis, and graph databases are expected to experience a revival on top of parallel and distributed data stores supporting big geospatial data analysis
Análisis descriptivo de datos de planificación y programación de obras para la automatización de la cuarta dimensión (4D) del sistema de modelamiento de información
Descargue la tesis en el repositorio institucional de la Universtiy of Illinois: http://hdl.handle.net/2142/106135La necesidad de la automatización del proceso 4D BIM se hace necesaria para agilizar los flujos de
trabajo en las etapas de preconstrucción y construcción. Aunque el proceso de 4D BIM tiende a
ser laborioso, los beneficios de su ejecución son múltiples: visualización, monitoreo y control de
proyectos; seguridad de obras; aumento de productividad; etc. Diferentes esfuerzos para
automatizar su aplicación han sido publicados, sin embargo, existe una falta de estudios orientados
al análisis y relación entre las dos variables principales que permiten su automatización: la
planificación y programación de obras, y los objetos 3D-BIM. El presente estudio plantea cubrir
esta brecha a través de un análisis cualitativo y cuantitativo de los datos de programación de obra y
los objetos 3D-BIM, y su contraste con los testimonios de expertos en la industria AEC de los
Estados Unidos. Los resultados muestran que el 60% no utilizan un estándar para la programación
de obras y un 53% realizan practicas de actualización de manera mensual. Asimismo, el análisis
revela que un 77% de actividades en la construcción son relacionables con BIM y solo un 19% con
un LOD muy elevado podrían ser modelables. Métodos para lograr la automatización de 4D BIM
han sido discutidos y sugeridos
An investigation of TNAV equipped aircraft in a simulated en route metering environment
This document presents the results of an effort to estimate how often a TNAV (Time Navigation) equipped aircraft could be given a TNAV clearance in the En Route Metering (ERM) system as a function of the percentage of arriving traffic which is TNAV equipped. A fast-time simulation of Denver Stapleton international arrival traffic in the Denver Air Route Traffic Control Center route structure, including en route metering operations, was used to develop data on estimated conflicts, clearance communications and fuel usage for traffic mixes of 25, 50, 75 and 100% TNAV equipped. This study supports an overall effort by NASA to assess the benefits and required technology for using TNAV-equipped aircraft in the ERM environment
Recommended from our members
Requirements for building information modeling based lean production management systems for construction
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last
Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face
Modeling and manipulating spacetime objects in a true 4D model
The concept of spacetime has long been used in physics to refer to models that integrate 3D space and time as a single 4D continuum. We argue in this paper that it is also advantageous to use this concept in a practical geographic context by realizing a true 4D model, where time is modeled and implemented as a dimension in the same manner as the three spatial dimensions. Within this paper we focus on 4D vector objects, which can be implemented using dimension-independent data structures such as generalized maps. A 4D vector model allows us to create and manipulate models with actual 4D objects and the topological relationships connecting them, all of which have a geometric interpretation and can be constructed, modified, and queried. In this paper we discuss where such a 4D model fits with respect to other spatiotemporal modeling approaches, and we show concretely how higher-dimensional modeling can be used to represent such 4D objects and topological relationships. In addition, we explain how the 4D objects in such a system can be created and manipulated using a small set of implementable operations, which use simple 3D space and 1D time inputs for intuitiveness and which modify the underlying 4D model indirectly
Virtual Rephotography: Novel View Prediction Error for 3D Reconstruction
The ultimate goal of many image-based modeling systems is to render
photo-realistic novel views of a scene without visible artifacts. Existing
evaluation metrics and benchmarks focus mainly on the geometric accuracy of the
reconstructed model, which is, however, a poor predictor of visual accuracy.
Furthermore, using only geometric accuracy by itself does not allow evaluating
systems that either lack a geometric scene representation or utilize coarse
proxy geometry. Examples include light field or image-based rendering systems.
We propose a unified evaluation approach based on novel view prediction error
that is able to analyze the visual quality of any method that can render novel
views from input images. One of the key advantages of this approach is that it
does not require ground truth geometry. This dramatically simplifies the
creation of test datasets and benchmarks. It also allows us to evaluate the
quality of an unknown scene during the acquisition and reconstruction process,
which is useful for acquisition planning. We evaluate our approach on a range
of methods including standard geometry-plus-texture pipelines as well as
image-based rendering techniques, compare it to existing geometry-based
benchmarks, and demonstrate its utility for a range of use cases.Comment: 10 pages, 12 figures, paper was submitted to ACM Transactions on
Graphics for revie
- …