    Single machine scheduling problems with uncertain parameters and the OWA criterion

    Get PDF
    In this paper a class of single machine scheduling problems is discussed. It is assumed that job parameters, such as processing times, due dates, or weights are uncertain and their values are specified in the form of a discrete scenario set. The Ordered Weighted Averaging (OWA) aggregation operator is used to choose an optimal schedule. The OWA operator generalizes traditional criteria in decision making under uncertainty, such as the maximum, average, median or Hurwicz criterion. It also allows us to extend the robust approach to scheduling by taking into account various attitudes of decision makers towards the risk. In this paper a general framework for solving single machine scheduling problems with the OWA criterion is proposed and some positive and negative computational results for two basic single machine scheduling problems are provided

    Min-Max Regret Scheduling To Minimize the Total Weight of Late Jobs With Interval Uncertainty

    Full text link
    We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched. Instead, only interval bounds for these parameters are given. In contrast to the stochastic optimization approach, we consider the problem of finding a robust schedule, which minimizes the maximum regret of a solution. Heuristic algorithm based on mixed-integer linear programming is presented and examined through computational experiments

    The Integration of Process Planning and Shop Floor Scheduling in Small Batch Part Manufacturing

    Get PDF
    In this paper we explore possibilities to cut manufacturing leadtimes and to improve delivery performance in a small batch part manufacturing shop by integrating process planning and shop floor scheduling. Using a set of initial process plans (one for each order in the shop), we exploit a resource decomposition procedure to determine schedules to determine schedules which minimize the maximum lateness, given these process plans. If the resulting schedule is still unsatisfactory, a critical path analysis is performed to select jobs as candidates for alternative process plans. In this way, an excellent due date performance can be achieved, with a minimum of process planning and scheduling effort

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    Design and Analysis of an Estimation of Distribution Approximation Algorithm for Single Machine Scheduling in Uncertain Environments

    Full text link
    In the current work we introduce a novel estimation of distribution algorithm to tackle a hard combinatorial optimization problem, namely the single-machine scheduling problem, with uncertain delivery times. The majority of the existing research coping with optimization problems in uncertain environment aims at finding a single sufficiently robust solution so that random noise and unpredictable circumstances would have the least possible detrimental effect on the quality of the solution. The measures of robustness are usually based on various kinds of empirically designed averaging techniques. In contrast to the previous work, our algorithm aims at finding a collection of robust schedules that allow for a more informative decision making. The notion of robustness is measured quantitatively in terms of the classical mathematical notion of a norm on a vector space. We provide a theoretical insight into the relationship between the properties of the probability distribution over the uncertain delivery times and the robustness quality of the schedules produced by the algorithm after a polynomial runtime in terms of approximation ratios

    A Robust Scheduling Approach for a Single Machine to Optimize a Risk Measure

    Get PDF
    Robustness in scheduling addresses the capability of devising schedules which are not sensitive – to a certain extent – to the disruptive effects of unexpected events. The paper presents a novel approach for protecting the quality of a schedule by taking into account the rare occurrence of very unfavourable events causing heavy losses. This calls for assessing the risk associated to the different scheduling decisions. In this paper we consider a stochastic scheduling problem with a set of jobs to be sequenced on a single machine. The release dates and processing times of the jobs are generally distributed independent random variables, while the due dates are deterministic. We present a branch-and-bound approach to minimize the Value-at-Risk of the distribution of the maximum lateness and demonstrate the viability of the approach through a series of computational experiments

    Order Acceptance and Scheduling: A Taxonomy and Review

    Get PDF
    Over the past 20 years, the topic of order acceptance has attracted considerable attention from those who study scheduling and those who practice it. In a firm that strives to align its functions so that profit is maximized, the coordination of capacity with demand may require that business sometimes be turned away. In particular, there is a trade-off between the revenue brought in by a particular order, and all of its associated costs of processing. The present study focuses on the body of research that approaches this trade-off by considering two decisions: which orders to accept for processing, and how to schedule them. This paper presents a taxonomy and a review of this literature, catalogs its contributions and suggests opportunities for future research in this area

    Minimizing value-at-risk in single-machine scheduling

    Get PDF
    The vast majority of the machine scheduling literature focuses on deterministic problems in which all data is known with certainty a priori. In practice, this assumption implies that the random parameters in the problem are represented by their point estimates in the scheduling model. The resulting schedules may perform well if the variability in the problem parameters is low. However, as variability increases accounting for this randomness explicitly in the model becomes crucial in order to counteract the ill effects of the variability on the system performance. In this paper, we consider single-machine scheduling problems in the presence of uncertain parameters. We impose a probabilistic constraint on the random performance measure of interest, such as the total weighted completion time or the total weighted tardiness, and introduce a generic risk-averse stochastic programming model. In particular, the objective of the proposed model is to find a non-preemptive static job processing sequence that minimizes the value-at-risk (VaR) of the random performance measure at a specified confidence level. We propose a Lagrangian relaxation-based scenario decomposition method to obtain lower bounds on the optimal VaR and provide a stabilized cut generation algorithm to solve the Lagrangian dual problem. Furthermore, we identify promising schedules for the original problem by a simple primal heuristic. An extensive computational study on two selected performance measures is presented to demonstrate the value of the proposed model and the effectiveness of our solution method
    • …