134,314 research outputs found

    Identifying and addressing adaptability and information system requirements for tactical management

    Get PDF

    Learning targets in science guidance

    Get PDF

    Development of titanium dioxide nanoparticles/nanosolution for photocatalytic activity

    Get PDF
    Biological and chemical contaminants by man-made activities have been serious global issue. Exposure of these contaminants beyond the limits may result in serious environmental and health problem. Therefore, it is important to develop an effective solution that can be easily utilized by mankind. One of the effective ways to overcome this problem is by using titanium dioxide (TiO2). TiO2 is a well-known photocatalyst that widely used for environmental clean-up due to its ability to decompose organic pollutant and kill bacteria. Although it is proven TiO2 has an advantage to solve this concern, its usefulness unfortunately is limited only under UV light irradiation. Therefore, the aim of this work was to investigate the potential of TiO2 that can be activated under visible light by the incorporation of metal ions (Fe, Ag, Zr and Ag-Zr). In this study, sol-gel method was employed for the synthesis of metal ions incorporated TiO2. XRD analysis revealed that all samples content biphasic anatase-brookite TiO2 of size 3 nm to 5 nm. It was found that the incorporation of these metal ions did not change the morphology of TiO2 but the crystallinity and optical properties were affected. The crystallinity of anatase in the biphasic TiO2 was found to be decreased and favored brookite formation. PL analysis showed metal ions incorporation suppressed the recombination of electron-hole pairs while the band gap energy of TiO2 (3.2 eV) was decreased by the incorporation of Fe (2.46 eV) and Ag (2.86 eV). Among this incorporation, Ag-Zr incorporated TiO2 showed highest performance for methyl orange degradation (93%) under fluorescent xxv light irradiation for 10 h. This follows by Zr-TiO2 (82%), Fe-TiO2 (75%) and Ag�TiO2 (43%). Meanwhile, the highest antibacterial performance was exhibited by Ag�TiO2. TEM images showed that E.coli bacterium was killed within 12 h after treated with Ag-TiO2. The results obtained from the fieldwork study established that Ag-Zr incorporation have excellent performances for VOC removal and antibacterial test. The VOC content after treated with Ag-Zr-TiO2 fulfilled the Industry Code of Practice on Indoor Air Quality 2010 which is lower than 3 ppm. In addition, the percentage of microbes also found to be decrease around 45 % within 5 days of monitoring

    Maintenance Knowledge Management with Fusion of CMMS and CM

    Get PDF
    Abstract- Maintenance can be considered as an information, knowledge processing and management system. The management of knowledge resources in maintenance is a relatively new issue compared to Computerized Maintenance Management Systems (CMMS) and Condition Monitoring (CM) approaches and systems. Information Communication technologies (ICT) systems including CMMS, CM and enterprise administrative systems amongst others are effective in supplying data and in some cases information. In order to be effective the availability of high-quality knowledge, skills and expertise are needed for effective analysis and decision-making based on the supplied information and data. Information and data are not by themselves enough, knowledge, experience and skills are the key factors when maximizing the usability of the collected data and information. Thus, effective knowledge management (KM) is growing in importance, especially in advanced processes and management of advanced and expensive assets. Therefore efforts to successfully integrate maintenance knowledge management processes with accurate information from CMMSs and CM systems will be vital due to the increasing complexities of the overall systems. Low maintenance effectiveness costs money and resources since normal and stable production cannot be upheld and maintained over time, lowered maintenance effectiveness can have a substantial impact on the organizations ability to obtain stable flows of income and control costs in the overall process. Ineffective maintenance is often dependent on faulty decisions, mistakes due to lack of experience and lack of functional systems for effective information exchange [10]. Thus, access to knowledge, experience and skills resources in combination with functional collaboration structures can be regarded as vital components for a high maintenance effectiveness solution. Maintenance effectiveness depends in part on the quality, timeliness, accuracy and completeness of information related to machine degradation state, based on which decisions are made. Maintenance effectiveness, to a large extent, also depends on the quality of the knowledge of the managers and maintenance operators and the effectiveness of the internal & external collaborative environments. With emergence of intelligent sensors to measure and monitor the health state of the component and gradual implementation of ICT) in organizations, the conceptualization and implementation of E-Maintenance is turning into a reality. Unfortunately, even though knowledge management aspects are important in maintenance, the integration of KM aspects has still to find its place in E-Maintenance and in the overall information flows of larger-scale maintenance solutions. Nowadays, two main systems are implemented in most maintenance departments: Firstly, Computer Maintenance Management Systems (CMMS), the core of traditional maintenance record-keeping practices that often facilitate the usage of textual descriptions of faults and actions performed on an asset. Secondly, condition monitoring systems (CMS). Recently developed (CMS) are capable of directly monitoring asset components parameters; however, attempts to link observed CMMS events to CM sensor measurements have been limited in their approach and scalability. In this article we present one approach for addressing this challenge. We argue that understanding the requirements and constraints in conjunction - from maintenance, knowledge management and ICT perspectives - is necessary. We identify the issues that need be addressed for achieving successful integration of such disparate data types and processes (also integrating knowledge management into the “data types” and processes)

    Goals/questions/metrics method and SAP implementation projects

    Get PDF
    During the last years some researchers have studied the critical success factors (CSFs) in ERP implementations. However, until now, no one has studied how these CSFs should be put in practice to help organizations achieve success in ERP implementations. This technical research report attempts to define the usage of Goals/Questions/Metrics (GQM) approach in the definition of a measurement system for ERP implementation projects. GQM approach is a mechanism for defining and interpreting operational, measurable goals. Lately, because of its intuitive nature the approach has gained widespread appeal. We present a metrics overview and a description of GQM approach. Then we provide an example of GQM application for monitoring sustained management support in ERP implementations. Sustained management support is the most cited critical success factor in ERP implementation projects.Postprint (published version

    Measuring Software Process: A Systematic Mapping Study

    Get PDF
    Context: Measurement is essential to reach predictable performance and high capability processes. It provides support for better understanding, evaluation, management, and control of the development process and project, as well as the resulting product. It also enables organizations to improve and predict its process’s performance, which places organizations in better positions to make appropriate decisions. Objective: This study aims to understand the measurement of the software development process, to identify studies, create a classification scheme based on the identified studies, and then to map such studies into the scheme to answer the research questions. Method: Systematic mapping is the selected research methodology for this study. Results: A total of 462 studies are included and classified into four topics with respect to their focus and into three groups based on the publishing date. Five abstractions and 64 attributes were identified, 25 methods/models and 17 contexts were distinguished. Conclusion: capability and performance were the most measured process attributes, while effort and performance were the most measured project attributes. Goal Question Metric and Capability Maturity Model Integration were the main methods and models used in the studies, whereas agile/lean development and small/medium-size enterprise were the most frequently identified research contexts.Ministerio de Economía y Competitividad TIN2013-46928-C3-3-RMinisterio de Economía y Competitividad TIN2016-76956-C3-2- RMinisterio de Economía y Competitividad TIN2015-71938-RED
    corecore