9,913 research outputs found

    Cybersecurity of Railway Command and Control Systems

    Get PDF
    With the large-scale migration to computer-based and network technology, the threat of unauthorized remote access to railway command and control systems does not appear to be something extraordinary.But external effects shall be considered alongside with internal factorsof signalling software and hardware such errors and undocumented features. Risk mitigation in terms of cybersecurity of signalling installations can onlybe achieved as a combination of means designed within some holistic approach integrating both safety and IT security aspects

    Precise vehicle location as a fundamental parameter for intelligent selfaware rail-track maintenance systems

    Get PDF
    The rail industry in the UK is undergoing substantial changes in response to a modernisation vision for 2040. Development and implementation of these will lead to a highly automated and safe railway. Real-time regulation of traffic will optimise the performance of the network, with trains running in succession within an adjacent movable safety zone. Critically, maintenance will use intelligent trainborne and track-based systems. These will provide accurate and timely information for condition based intervention at precise track locations, reducing possession downtime and minimising the presence of workers in operating railways. Clearly, precise knowledge of trains’ real-time location is of paramount importance. The positional accuracy demand of the future railway is less than 2m. A critical consideration of this requirement is the capability to resolve train occupancy in adjacent tracks, with the highest degree of confidence. A finer resolution is required for locating faults such as damage or missing parts, precisely. Location of trains currently relies on track signalling technology. However, these systems mostly provide an indication of the presence of trains within discrete track sections. The standard Global Navigation Satellite Systems (GNSS), cannot precisely and reliably resolve location as required either. Within the context of the needs of the future railway, state of the art location technologies and systems were reviewed and critiqued. It was found that no current technology is able to resolve location as required. Uncertainty is a significant factor. A new integrated approach employing complimentary technologies and more efficient data fusion process, can potentially offer a more accurate and robust solution. Data fusion architectures enabling intelligent self-aware rail-track maintenance systems are proposed

    The when and where of an emerging crime type: the example of metal theft from the railway network of Great Britain

    Get PDF
    Metal theft has become an increasingly common crime in recent years, but lack of data has limited research into it. The present study used police-recorded crime data to study the spatial and temporal concentration of metal theft from the railway network of Great Britain. Metal theft was found to exhibit only weak seasonality, to be concentrated at night and to cluster in a few locations close to – but not in – major cities. Repeat-victimisation risk continued for longer than has been found for other crime types. These and other features appear to point to metal theft being a planned, rather than opportunistic, offence and to the role of scrap-metal dealers as facilitators

    Timed Fault Tree Models of the China Yongwen Railway Accident

    Get PDF
    Safety is an essential requirement for railway transportation. There are many methods that have been developed to predict, prevent and mitigate accidents in this context. All of these methods have their own purpose and limitations. This paper presents a new useful analysis technique: timed fault tree analysis. This method extends traditional fault tree analysis with temporal events and fault characteristics. Timed Fault Trees (TFTs) can determine which faults need to be eliminated urgently, and it can also provide a safe time window to repair them. They can also be used to determine the time taken for railway maintenance requirements, and thereby improve maintenance efficiency, and reduce risks. In this paper, we present the features and functionality of a railway transportation system based on timed fault tree models. We demonstrate the applicability of our framework via a case study of the China Yongwen line railway accident

    Developing a distributed electronic health-record store for India

    Get PDF
    The DIGHT project is addressing the problem of building a scalable and highly available information store for the Electronic Health Records (EHRs) of the over one billion citizens of India
    corecore