63 research outputs found

    Physical Vulnerability of Electric Systems to Natural Disasters and Sabotage

    Get PDF
    This report offers an analysis of the vulnerability of electric power system specific equipment which is included in a separate appendix that is under classification review by the Department of Energy. This appendix will be made available only under appropriate safeguards by the Department of Energy

    Elektromagnetische velden in arbeidssituaties

    Get PDF
    NB Nederlandstalige versie verschenen onder nummer 610015001N De EU heeft richtlijn 2004/40/EG uitgevaardigd om de werknemer te beschermen tegen gezondheidsrisico's door blootstelling aan elektromagnetische velden op het werk. Deze richtlijn moet uiterlijk 30 april 2008 zijn omgezet in nationale wetgeving. Ter voorbereiding hiervan heeft het RIVM in opdracht van het Ministerie van SZW de blootstelling in Nederlandse arbeidssituaties geinventariseerd en geanalyseerd. Het doel van dit rapport is de werkgevers een handreiking te geven om vast te stellen of aan de eisen uit de richtlijn wordt voldaan en om de risico-inventarisatie en -evaluatie (RI&E) voor elektromagnetische velden op te stellen. Totdat er geharmoniseerde Europese normen van het Europees Comiti voor elektrotechnische normalisatie (CENELEC) beschikbaar zijn voor alle situaties die moeten worden beoordeeld, gemeten en berekend, mag dit rapport als richtsnoer gebruikt worden. Gebruik van dit rapport is dus geen verplichting. Voor de meeste werkgevers is het voldoende om de eerste twee hoofdstukken door te nemen. De volgende drie hoofdstukken bevatten voor een aantal arbeidssituaties informatie over de blootstelling, de rekenregels waarmee de situatie kan worden ingeschat en de mogelijke beheersmaatregelen. Het laatste hoofdstuk geeft een overzicht van de kosten die met invoering van de richtlijn samenhangen. Om te kunnen toetsen of de blootstelling onder de limieten van de richtlijn blijft, moeten CENELEC-normen worden gebruikt, voor zover ze bestaan. Deze normen zijn zonder specialistische kennis niet eenvoudig toe te passen. Ook hoeft niet alle apparatuur even uitgebreid beoordeeld te worden of zijn even zware maatregelen nodig. Om de beoordeling te vergemakkelijken geeft dit rapport een beoordelingsschema en tabellen met een indeling van alle relevante werkomgevingen in drie categorieen. Voor iedere categorie geldt een ander beoordelingstraject.The EU has issued Directive 2004/40/EC on the protection of workers from health and safety risks arising from exposure to electromagnetic fields in the workplace. This directive must be implemented in national legislation no later than 30 April 2008. To prepare for implementation, RIVM has, on commission of the Ministry of Social Affairs and Employment, investigated and analysed the exposure in Dutch working environments. The purpose of this report is to provide assistance to employers to assess whether compliance is met and to carry out the inventory and evaluation of risks (RI&E) due to electromagnetic fields. Until harmonised European standards from CENELEC cover all relevant assessment, measurement and calculation situations, this report may serve as a guide. It is not mandatory to use this report. It will be sufficient for most of the employers to confine themselves to the first two chapters. Subsequent chapters deal with the exposure found in several working environments and provide guidelines for assessing risks and possible measures in these working environments. Costs for implementing the directive are discussed in the last chapter. CENELEC standards, if available, are mandatory for assessing whether exposure occurs below the limits in the directive. However, these standards are not easy to use without specialist knowledge. Furthermore, not all equipment needs to be assessed to the same extent nor are the same measures needed. A flow chart and tables of relevant working environments, classified into three categories, are provided to facilitate the assessment. Each category has its own assessment path.SZ

    Standardization Roadmap for Unmanned Aircraft Systems, Version 1.0

    Get PDF
    This Standardization Roadmap for Unmanned Aircraft Systems, Version 1.0 (“roadmap”) represents the culmination of the UASSC’s work to identify existing standards and standards in development, assess gaps, and make recommendations for priority areas where there is a perceived need for additional standardization and/or pre-standardization R&D. The roadmap has examined 64 issue areas, identified a total of 60 gaps and corresponding recommendations across the topical areas of airworthiness; flight operations (both general concerns and application-specific ones including critical infrastructure inspections, commercial services, and public safety operations); and personnel training, qualifications, and certification. Of that total, 40 gaps/recommendations have been identified as high priority, 17 as medium priority, and 3 as low priority. A “gap” means no published standard or specification exists that covers the particular issue in question. In 36 cases, additional R&D is needed. The hope is that the roadmap will be broadly adopted by the standards community and that it will facilitate a more coherent and coordinated approach to the future development of standards for UAS. To that end, it is envisioned that the roadmap will be widely promoted and discussed over the course of the coming year, to assess progress on its implementation and to identify emerging issues that require further elaboration

    Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project

    Get PDF
    This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed

    Hearing on PCBs - Problems of Use and Alternatives for Disposal

    Get PDF
    Our hearing this morning is concerned with the health and environmental effects posed by the use and disposal of PCB\u27s - Polychlorinated Biphenyls. Because of the numerous incidents involving PCB spills and the increasing amount of liquid PCB waste accumulating in California, this Committee has a responsibility to examine these effects and insure they do not pose a risk to the public health and environment. At this hearing, we\u27ll examine the long and short term human health hazards caused by the exposure to PCB\u27s. There has been a general concern that these very stable compounds may escape into the environment from accidents and leakages or while in interim storage. The State\u27s appropriate goal is to insure that these substances are destroyed by an acceptable method

    Hearing on PCBs - Problems of Use and Alternatives for Disposal

    Get PDF
    Our hearing this morning is concerned with the health and environmental effects posed by the use and disposal of PCB\u27s - Polychlorinated Biphenyls. Because of the numerous incidents involving PCB spills and the increasing amount of liquid PCB waste accumulating in California, this Committee has a responsibility to examine these effects and insure they do not pose a risk to the public health and environment. At this hearing, we\u27ll examine the long and short term human health hazards caused by the exposure to PCB\u27s. There has been a general concern that these very stable compounds may escape into the environment from accidents and leakages or while in interim storage. The State\u27s appropriate goal is to insure that these substances are destroyed by an acceptable method

    Dickey-Lincoln School Lakes Project at Dickey, Maine : Final Environmental Statement, Volume 1-4

    Get PDF
    The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, 90 feet above the existing streambed

    Manual de riscos elétricos : introdução às redes de proteção

    Get PDF
    Tese de mestrado. Mestrado em Engenharia de Segurança e Higiene Ocupacionais. Faculdade de Engenharia. Universidade do Porto. 201

    Electrical Age (v. 39)

    Get PDF

    Summary Report Comparing High Voltage Overhead and Underground Transmission Infrastructure

    Get PDF
    This report summarises the findings of an independent systematic literature review of high voltage overhead and underground transmission infrastructure, which was undertaken by The University of Queensland and Curtin University. This is the summary report for the study which is complemented by more detailed reports provided separately in Chapters 1 to 8 which cover the themes and cases studies in more detail
    • …
    corecore