14,871 research outputs found

    An integrated approach for requirement selection and scheduling in software release planning

    Get PDF
    It is essential for product software companies to decide which requirements should be included in the next release and to make an appropriate time plan of the development project. Compared to the extensive research done on requirement selection, very little research has been performed on time scheduling. In this paper, we introduce two integer linear programming models that integrate time scheduling into software release planning. Given the resource and precedence constraints, our first model provides a schedule for developing the requirements such that the project duration is minimized. Our second model combines requirement selection and scheduling, so that it not only maximizes revenues but also simultaneously calculates an on-time-delivery project schedule. Since requirement dependencies are essential for scheduling the development process, we present a more detailed analysis of these dependencies. Furthermore, we present two mechanisms that facilitate dynamic adaptation for over-estimation or under-estimation of revenues or processing time, one of which includes the Scrum methodology. Finally, several simulations based on real-life data are performed. The results of these simulations indicate that requirement dependency can significantly influence the requirement selection and the corresponding project plan. Moreover, the model for combined requirement selection and scheduling outperforms the sequential selection and scheduling approach in terms of efficiency and on-time delivery. \u

    A Branch-and-Cut based Pricer for the Capacitated Vehicle Routing Problem

    Get PDF
    openIl Capacitated Vehicle Routing Problem, abbreviato come CVRP, è un problema di ottimizzazione combinatoria d'instradamento nel quale, un insieme geograficamente sparso di clienti con richieste note deve essere servito da una flotta di veicoli stazionati in una struttura centrale. Negli ultimi due decenni, tecniche di Column generation incorporate all'interno di frameworks branch-price-and-cut sono state infatti l'approccio stato dell'arte dominante per la costruzione di algoritmi esatti per il CVRP. Il pricer, un componente critico nella column generation, deve risolvere il Pricing Problem (PP) che richiede la risoluzione di un Elementary Shortest Path Problem with Resource Constraints (ESPPRC) in una rete di costo ridotto. Pochi sforzi scientifici sono stati dedicati allo studio di approcci branch-and-cut per affrontare il PP. L'ESPPRC è stato tradizionalmente rilassato e risolto attraverso algoritmi di programmazione dinamica. Questo approccio, tuttavia, ha due principali svantaggi. Per cominciare, peggiora i dual bounds ottenuti. Inoltre, il tempo di esecuzione diminuisce all'aumentare della lunghezza dei percorsi generati. Per valutare la performance dei loro contributi, la comunità di ricerca operativa ha tradizionalmente utilizzato una serie d'istanze di test storiche e artificiali. Tuttavia, queste istanze di benchmark non catturano le caratteristiche chiave dei moderni problemi di distribuzione del mondo reale, che sono tipicamente caratterizzati da lunghi percorsi. In questa tesi sviluppiamo uno schema basato su un approccio branch-and-cut per risolvere il pricing problem. Studiamo il comportamento e l'efficacia della nostra implementazione nel produrre percorsi più lunghi comparandola con soluzioni all'avanguardia basate su programmazione dinamica. I nostri risultati suggeriscono che gli approcci branch-and-cut possono supplementare il tradizionale algoritmo di etichettatura, indicando che ulteriore ricerca in quest'area possa portare benefici ai risolutori CVRP.The Capacitated Vehicle Routing Problem, CVRP for short, is a combinatorial optimization routing problem in which, a geographically dispersed set of customers with known demands must be served by a fleet of vehicles stationed at a central facility. Column generation techniques embedded within branch-price-and-cut frameworks have been the de facto state-of-the-art dominant approach for building exact algorithms for the CVRP over the last two decades. The pricer, a critical component in column generation, must solve the Pricing Problem (PP), which asks for an Elementary Shortest Path Problem with Resource Constraints (ESPPRC) in a reduced-cost network. Little scientific efforts have been dedicated to studying branch-and-cut based approaches for tackling the PP. The ESPPRC has been traditionally relaxed and solved through dynamic programming algorithms. This approach, however, has two major drawbacks. For starters, it worsens the obtained dual bounds. Furthermore, the running time degrades as the length of the generated routes increases. To evaluate the performance of their contributions, the operations research community has traditionally used a set of historical and artificial test instances. However, these benchmark instances do not capture the key characteristics of modern real-world distribution problems, which are usually characterized by longer routes. In this thesis, we develop a scheme based on a branch-and-cut approach for solving the pricing problem. We study the behavior and effectiveness of our implementation in producing longer routes by comparing it with state-of-the-art solutions based on dynamic programming. Our results suggest that branch-and-cut approaches may supplement the traditional labeling algorithm, indicating that further research in this area may bring benefits to CVRP solvers

    A Branch-Price-and-Cut Algorithm for the Capacitated Multiple Vehicle Traveling Purchaser Problem with Unitary Demand

    Get PDF
    The multiple vehicle traveling purchaser problem (MVTPP) consists of simultaneously selecting suppliers and routing a fleet of homogeneous vehicles to purchase different products at the selected suppliers so that all product demands are fulfilled and traveling and purchasing costs are minimized. We consider variants of the MVTPP in which the capacity of the vehicles can become binding and the demand for each product is one unit. Corresponding solution algorithms from the literature are either branch-and-cut or branch-and-price algorithms, where in the latter case the route-generation subproblem is solved on an expanded graph by applying standard dynamic-programming techniques. Our branch-price-and-cut algorithm employs a novel labeling algorithm that works directly on the original network and postpones the purchasing decisions until the route has been completely defined. Moreover, we define a new branching rule generally applicable in case of unitary product demands, introduce a new family of valid inequalities to apply when suppliers can be visited at most once, and show how product incompatibilities can be handled without considering additional resources in the pricing problem. In comprehensive computational experiments with standard benchmark sets we prove that the new branch-price-and-cut approach is highly competitive

    Ariel - Volume 12(13) Number 4

    Get PDF
    Co-Editors Gary Fishbein Lynn Solomon Business Manager Rich Davis Assistant Business Manager Jeff Lavanier Layout Editors Paul J. Berlin Tracy A. Glauser Photography Editor Ben Alma

    A review of discrete-time optimization models for tactical production planning

    Full text link
    This is an Accepted Manuscript of an article published in International Journal of Production Research on 27 Mar 2014, available online: http://doi.org/10.1080/00207543.2014.899721[EN] This study presents a review of optimization models for tactical production planning. The objective of this research is to identify streams and future research directions in this field based on the different classification criteria proposed. The major findings indicate that: (1) the most popular production-planning area is master production scheduling with a big-bucket time-type period; (2) most of the considered limited resources correspond to productive resources and, to a lesser extent, to inventory capacities; (3) the consideration of backlogs, set-up times, parallel machines, overtime capacities and network-type multisite configuration stand out in terms of extensions; (4) the most widely used modelling approach is linear/integer/mixed integer linear programming solved with exact algorithms, such as branch-and-bound, in commercial MIP solvers; (5) CPLEX, C and its variants and Lindo/Lingo are the most popular development tools among solvers, programming languages and modelling languages, respectively; (6) most works perform numerical experiments with random created instances, while a small number of works were validated by real-world data from industrial firms, of which the most popular are sawmills, wood and furniture, automobile and semiconductors and electronic devices.This study has been funded by the Universitat Politècnica de València projects: ‘Material Requirement Planning Fourth Generation (MRPIV)’ (Ref. PAID-05-12) and ‘Quantitative Models for the Design of Socially Responsible Supply Chains under Uncertainty Conditions. Application of Solution Strategies based on Hybrid Metaheuristics’ (PAID-06-12).Díaz-Madroñero Boluda, FM.; Mula, J.; Peidro Payá, D. (2014). A review of discrete-time optimization models for tactical production planning. International Journal of Production Research. 52(17):5171-5205. doi:10.1080/00207543.2014.899721S51715205521

    The Team Orienteering Problem with Overlaps : An Application in Cash Logistics

    Get PDF
    The team orienteering problem (TOP) aims at finding a set of routes subject to maximum route duration constraints that maximize the total collected profit from a set of customers. Motivated by a real-life automated teller machine cash replenishment problem that seeks for routes maximizing the number of bank account holders having access to cash withdrawal, we investigate a generalization of the TOP that we call the team orienteering problem with overlaps (TOPO). For this problem, the sum of individual profits may overestimate the real profit. We present exact solution methods based on column generation and a metaheuristic based on large neighborhood search to solve the TOPO. An extensive computational analysis shows that the proposed solution methods can efficiently solve synthetic and real-life TOPO instances. Moreover, the proposed methods are competitive with the best algorithms from the literature for the TOP. In particular, the exact methods can find the optimal solution of 371 of the 387 benchmark TOP instances, 33 of which are closed for the first time

    Some operational aspects of a rotating advanced-technology space station for the year 2025

    Get PDF
    The study of an Advanced Technology Space Station which would utilize the capabilities of subsystems projected for the time frame of the years 2000 to 2025 is discussed. The study includes tradeoffs of nuclear versus solar dynamic power systems that produce power outputs of 2.5 megawatts and analyses of the dynamics of the spacecraft of which portions are rotated for artificial gravity. The design considerations for the support of a manned Mars mission from low Earth orbit are addressed. The studies extend to on-board manufacturing, internal gas composition effects, and locomotion and material transfer under artificial gravity forces. The report concludes with an assessment of technology requirements for the Advanced Technology Space Station
    corecore