903,671 research outputs found

    From Building Information Modeling to City Information Modeling

    Get PDF
    With the development of Geographic Information System (GIS), the concept of digital city is implemented widely. However, in practice, most of the GIS models are relatively poorly attributed, semantically. Building Information Modeling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of building, which is most used in small scale projects. In order to address the target problem of completing the semantic attribution of 3D digital city model, a framework of integrating BIM technology into GIS is demonstrated. A new concept of city information modeling (CIM) is proposed with the goal of bringing great benefits to the urban construction and city management. The composition of city information model is discussed. The data schema behind BIM and GIS (i.e. IFC and CityGML) are compared and mapped with each other. A case study of land planning of campus is demonstrated to present the potential benefits of CIM

    Securing a Wireless Site Network to Create a BIM-allied Work-front

    Get PDF
    The Building Information Model (BIM) serves as a framework to align all the project-related data, providing interoperability to store and retrieve information interactively. Unfortunately, the construction site itself is excluded from this interaction as the large amount of data requires high data transfer rates and ruggedized hardware. However, advanced wireless communication technologies open radically new avenues to relay large amounts of data automatically and in near real-time. Construction could be a key beneficiary of these advancements. Wireless communication integrated with BIM, GPS and the Internet is able to provide the backbone necessary for creating intelligent systems, supporting the designer in his or her office as well as workers on the work-front. This paper presents a study that documents the development and testing of prototypes designed to facilitate information sharing at the field-level during construction. The main system constitutes an information hub, called the eCKiosk, connecting “senders and receivers” both on-site as well as off-site. The system design is discussed and some of the main modules are demonstrated. Since the electronic Kiosk depends on robust connections to the wireless devices distributed across the site, reliable connectivity is essential. For this reason, the discussion includes a study of the electronic signals behaviour in an ever-changing construction site. Measurements of the signal strengths during excavation and concrete work are presented and compared with theoretical calculations used to predict wave propagation. The results show how present models overestimate signal attenuation patterns on the construction site. This is important for designing a reliable and secure wireless site networks to link BIM to the work-front

    Developing Project Managers’ Transversal Competences Using Building Information Modeling

    Get PDF
    The emergence of building information modeling (BIM) methodology requires the training of professionals with both specific and transversal skills. In this paper, a project-based learning experience carried out in the context of a project management course at the University of Extremadura is analyzed. To that end, a questionnaire was designed and given to students who participated in the initiative. Results suggest that BIM can be considered a virtual learning environment, from which students value the competences developed. The emotional performance observed was quite flat. Similarly, students valued the usefulness of the initiative. Students expressed a desire for the methodological change of the university classes, and thought that BIM methodology could be useful for other courses. The results obtained show a line of work to be done to improve the training of students and university teaching

    Application of BIM in sustainability analysis

    Get PDF
    Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction. The process produces the Building Information Model, which encompasses building geometry, spatial relationships, geographic information, quantities and properties of building components. On the other hand, Green Building Index (GBI) as the localized sustainability building rating system in Malaysia assesses the impact of building on environment based on energy efficiency, indoor environment quality, sustainable site & management, materials & resources, water efficiency and innovation. By integrating GBI assessment criteria with BIM technology, this research proposes a comparative case study analysis of Residential New Construction (RNC) and Non-Residential New Construction (NRNC) based on the Autodesk Ecotect Analysis software (a comprehensive, concept-to-detail sustainable design analysis tool that provides a wide range of simulation and analysis functionality through desktop and web-service platforms) and Autodesk Green Building Studio (A web-based energy analysis service which performs whole building analysis, optimizes energy efficiency, and works toward carbon neutrality earlier in the design process) to investigate the influence of construction material on energy consumption, lifecycle energy cost and carbon emission

    The interaction of lean and building information modeling in construction

    Get PDF
    Lean construction and Building Information Modeling are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, fifty-six interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete, but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers and developers of IT systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies

    Automated 3D data collection (A3DDC) for 3D building information modeling

    Get PDF

    SINTESIS GAMBAR KERJA, PERHITUNGAN STRUKTUR, DAN ANGGARAN BIAYA MENGGUNAKAN BIM DENGAN PENYAJIAN VIRTUAL REALITY

    Get PDF
    ABSTRAK Building Information Modelling (BIM) sudah mulai diterapkan dalam proses konstruksi bangunan di Indonesia yang menjadi bagian dari program Indonesia 4.0 karena Building Information Modelling sendiri bisa mengintegrasikan beberapa disiplin ilmu yang ada pada proses konstruksi. Berkembangnya teknologi tersebut, perencanaan sebuah bangunan secara umum dapat dikategorikan sebagai pekerjaan yang dapat menerapkan teknologi Virtual Reality (VR). Penelitian ini bertujuan untuk mengetahui diagram alir pada proses pembuatan Building Information Modelling, standar operasional prosedur Building Information Modelling serta implementasi fungsi Building Information Modelling dalam penyajian virtual reality. Penelitian ini menggunakan beberapa aplikasi Building Information Modelling diantaranya yaitu Revit, Naviswork, dan Robot Structural Analysis. Berdasarkan hasil yang dikeluarkan dari aplikasi Building Information Modelling tersebut adalah gambar kerja, perhitungan struktur, dan anggaran biaya yang saling terintegritas. Kata Kunci: Building Information Modelling (BIM), Gambar Kerja, Perhitungan Struktur, Anggaran Biaya, Virtual Reality. ABSTRACT Building Information Modeling (BIM) has begun to be applied in the building construction process in Indonesia which is part of the Indonesia 4.0 program because Building Information Modeling itself can integrate several existing disciplines in the construction process. With the development of this technology, planning a building in general can be categorized as a job that can apply Virtual Reality (VR) technology. This study aims to determine the flow chart in the process of making Building Information Modeling, the standard operating procedures for Building Information Modeling and the implementation of the Building Information Modeling function in presenting virtual reality. This study uses several Building Information Modeling applications including Revit, Naviswork, and Robot Structural Analysis. Based on the results issued from the Building Information Modeling application are integrated shop drawings, structural calculations, and budgeting. Keywords: Building Information Modeling (BIM), Shop Drawing, Structural Calculations, Budget, Virtual Reality

    Smart-BIM (Building Information Modeling)

    Get PDF
    Purpose: After a long period of international research and development, BIM has become mature. Many tools support the BIM process, or at least they claim. BIM not only offers opportunities for the Architectural Engineering and Construction industry, but also for the client. In this paper we don’t focus on the professional client, but on the client of a building assignment that act as the end-user. Involvement of the end user in the design process has been advocated by many scholars and designers, but has so far only marginally been adopted in practice. The importance of user participation is demonstrated by the lack of success of smart technologies in new housing or in renovation. Particularly elderly people resist accepting these technologies in their home environment, although they could benefit from these technologies to improve comfort and health care. As a result of poor understanding of these new technologies by both designers and end users, researchers observe that there is a mismatch between user demands and smart technology usability. Hence, this paper is an attempt to improve the role of users in the design process in two ways. Firstly, by adding the missing components of smart technology to current BIM model libraries. Secondly, by developing a virtual model in which users can interact with the smart technologies and configure their preferred layout. The final results are interesting not only for technology developers but also for housing designers who aim at improving the quality of life in future housing for aging society. Method: For a better understanding of BIM, a historical perspective is taken in this paper. The initiatives from different research institutes are discussed and how they affected each other. The up-take by the software industry is highlighted and their delicate relationship with science. In today’s design process BIM systems support spatial design that is accommodate by smart technology. Usually this smart technology is added after the spatial design in the final design stage by the installations expert. In our research we want to turn this process around; the smart technologies are accommodated by spatial design. Therefore we develop a design system with a library of smart components such as smart wall, smart kitchen and smart furniture. The difference between smart technologies and standard building components is that smart technologies interact with the building users. BIM allows for realistic visualization of designs in an early stage. In our prototype system, clients are presented a virtual space with a wide range of smart technologies. After being introduced to these technologies, the client expresses how these will fit within his/her activities. Following he/she can experience in the virtual model how smart technologies react when activities are executed. Results & Discussion A prototype system is presented that allows clients such as elderly to experience smart technologies. In contrast with traditional design it does not start from the spatial layout but from the activities that should be accommodated supported by smart technologies. We expect that fundamentally different layout will emerge from this approach. Although no experimental data are available yet, some first experiences will be discussed