14,946 research outputs found

    Access and metro network convergence for flexible end-to-end network design

    Get PDF
    This paper reports on the architectural, protocol, physical layer, and integrated testbed demonstrations carried out by the DISCUS FP7 consortium in the area of access - metro network convergence. Our architecture modeling results show the vast potential for cost and power savings that node consolidation can bring. The architecture, however, also recognizes the limits of long-reach transmission for low-latency 5G services and proposes ways to address such shortcomings in future projects. The testbed results, which have been conducted end-to-end, across access - metro and core, and have targeted all the layers of the network from the application down to the physical layer, show the practical feasibility of the concepts proposed in the project

    IDEALIST control and service management solutions for dynamic and adaptive flexi-grid DWDM networks

    Get PDF
    Wavelength Switched Optical Networks (WSON) were designed with the premise that all channels in a network have the same spectrum needs, based on the ITU-T DWDM grid. However, this rigid grid-based approach is not adapted to the spectrum requirements of the signals that are best candidates for long-reach transmission and high-speed data rates of 400Gbps and beyond. An innovative approach is to evolve the fixed DWDM grid to a flexible grid, in which the optical spectrum is partitioned into fixed-sized spectrum slices. This allows facilitating the required amount of optical bandwidth and spectrum for an elastic optical connection to be dynamically and adaptively allocated by assigning the necessary number of slices of spectrum. The ICT IDEALIST project will provide the architectural design, protocol specification, implementation, evaluation and standardization of a control plane and a network and service management system. This architecture and tools are necessary to introduce dynamicity, elasticity and adaptation in flexi-grid DWDM networks. This paper provides an overview of the objectives, framework, functional requirements and use cases of the elastic control plane and the adaptive network and service management system targeted in the ICT IDEALIST project

    A review of daylighting design and implementation in buildings

    Get PDF

    "Please hold for your connection": Determining points of interconnection for open access broadband

    Get PDF
    One of the early decisions facing a regulator in the context of an open access Next Generation Access networks (NGA) is the location of the points of interconnection to that NGA. This decision is one which needs to take into account the scope of the natural monopoly associated with an NGA and the extent to which there is the potential for competitive supply of transmission services (or backhaul) from access seeker points of presence to the NGA. The Australian NGA is called the National Broadband Network (NBN). This paper starts with the research question, where are the optimum sites for points of interconnection to the Australian NBN?. The paper commences by describing the architecture of the Australian NBN and considering some of the issues which arise from the fact that it is designed to be ubiquitous. The paper considers the issues that need to be considered in determining the extent to which there is a natural monopoly in transmission services as well as the effects on outcomes that arise from the existing deployment of infrastructure associated with the delivery of digital subscriber line broadband services based on unbundled local loops and line sharing services. The paper then moves to consider the requirements for consideration in the Australian regulatory context. This is summarised by the phrase long-term interests of end-users and the paper considers the interpretation of this phrase in the context of decisions on the number and location of points of interconnection. There is a review of the nature and extent to which operators in Australia contributed to the deliberations of the Australian regulator in determining the location of points of interconnection. In turn the paper then describes the actual approach taken in respect of the Australian NBN and the rationale behind those decisions. The final part of the paper describes the decision that was taken along with the rationale. It also examines the subsequent positions taken by stakeholders in respect of the points of interconnection to the Australian NBN. --Next generation access network,national broadband network,natural monopoly,transmission,point of interconnection,GPON

    Data distribution satellite

    Get PDF
    A description is given of a data distribution satellite (DDS) system. The DDS would operate in conjunction with the tracking and data relay satellite system to give ground-based users real time, two-way access to instruments in space and space-gathered data. The scope of work includes the following: (1) user requirements are derived; (2) communication scenarios are synthesized; (3) system design constraints and projected technology availability are identified; (4) DDS communications payload configuration is derived, and the satellite is designed; (5) requirements for earth terminals and network control are given; (6) system costs are estimated, both life cycle costs and user fees; and (7) technology developments are recommended, and a technology development plan is given. The most important results obtained are as follows: (1) a satellite designed for launch in 2007 is feasible and has 10 Gb/s capacity, 5.5 kW power, and 2000 kg mass; (2) DDS features include on-board baseband switching, use of Ku- and Ka-bands, multiple optical intersatellite links; and (3) system user costs are competitive with projected terrestrial communication costs

    Design and Service Provisioning Methods for Optical Networks in 5G and Beyond Scenarios

    Get PDF
    Network operators are deploying 5G while also considering the evolution towards 6G. They consider different enablers and address various challenges. One trend in the 5G deployment is network densification, i.e., deploying many small cell sites close to the users, which need a well-designed transport network (TN). The choice of the TN technology and the location for processing the 5G protocol stack functions are critical to contain capital and operational expenditures. Furthermore, it is crucial to ensure the resiliency of the TN infrastructure in case of a failure in nodes and/or links while the resource efficiency is maximized.Operators are also interested in 5G networks with flexibility and scalability features. In this context, one main question is where to deploy network functions so that the connectivity and compute resources are utilized efficiently while meeting strict service latency and availability requirements. Off-loading compute resources to large and central data centers (DCs) has some advantages, i.e., better utilization of compute resources at a lower cost. A backup path can be added to address service availability requirements when using compute off-loading strategies. This might impact the service blocking ratio and limit operators’ profit. The importance of this trade-off becomes more critical with the emergence of new 6G verticals.This thesis proposes novel methods to address the issues outlined above. To address the challenge of cost-efficient TN deployment, the thesis introduces a framework to study the total cost of ownership (TCO), latency, and reliability performance of a set of TN architectures for high-layer and low-layer functional split options. The architectural options are fiber- or microwave-based. To address the strict availability requirement, the thesis proposes a resource-efficient protection strategy against single node/link failure of the midhaul segment. The method selects primary and backup DCs for each aggregation node (i.e., nodes to which cell sites are connected) while maximizing the sharing of backup resources. Finally, to address the challenge of resource efficiency while provisioning services, the thesis proposes a backup-enhanced compute off-loading strategy (i.e., resource-efficient provisioning (REP)). REP selects a DC, a connectivity path, and (optionally) a backup path for each service request with the aim of minimizing resource usage while the service latency and availability requirements are met.Our results of the techno-economic assessment of the TN options reveal that, in some cases, microwave can be a good substitute for fiber technology. Several factors, including the geo-type, functional split option, and the cost of fiber trenching and microwave equipment, influence the effectiveness of the microwave. The considered architectures show similar latency and reliability performance and meet the 5G service requirements. The thesis also shows that a protection strategy based on shared connectivity and compute resources can lead to significant cost savings compared to benchmarks based on dedicated backup resources. Finally, the thesis shows that the proposed backup-enhanced compute off-loading strategy offers advantages in service blocking ratio and profit gain compared to a conventional off-loading approach that does not add a backup path. Benefits are even more evident considering next-generation services, e.g., expected on the market in 3 to 5 years, as the demand for services with stringent latency and availability will increase
    • …
    corecore