Scheduling Jobs in Flowshops with the Introduction of Additional Machines in the Future
This is the author's peer-reviewed final manuscript, as accepted by the publisher. The published article is copyrighted by Elsevier and can be found at: http://www.journals.elsevier.com/expert-systems-with-applications/.The problem of scheduling jobs to minimize total weighted tardiness in flowshops,\ud
with the possibility of evolving into hybrid flowshops in the future, is investigated in\ud
this paper. As this research is guided by a real problem in industry, the flowshop\ud
considered has considerable flexibility, which stimulated the development of an\ud
innovative methodology for this research. Each stage of the flowshop currently has\ud
one or several identical machines. However, the manufacturing company is planning\ud
to introduce additional machines with different capabilities in different stages in the\ud
near future. Thus, the algorithm proposed and developed for the problem is not only\ud
capable of solving the current flow line configuration but also the potential new\ud
configurations that may result in the future. A meta-heuristic search algorithm based\ud
on Tabu search is developed to solve this NP-hard, industry-guided problem. Six\ud
different initial solution finding mechanisms are proposed. A carefully planned\ud
nested split-plot design is performed to test the significance of different factors and\ud
their impact on the performance of the different algorithms. To the best of our\ud
knowledge, this research is the first of its kind that attempts to solve an industry-guided\ud
problem with the concern for future developments
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers
This research addresses the problem of minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers. A mathematical model was developed to solve this problem. The problem is NP-Hard in the strong sense and only very small problems could be solved optimally. For exact methods, the computation times are long and not practical even when the problems are relatively small. Two construction heuristics were developed that could find solutions quickly. Also a simulated annealing heuristic was constructed that improved the solutions obtained from the construction heuristics. The combined heuristics could compute a good solution in a short amount of time. The heuristics were tested in three different environments: 3 stages, 4 stages, and 5 stages. To assess the quality of the solutions, a lower bound and two simple heuristics were generated for comparison purposes. The proposed heuristics showed steady improvement over the simple heuristics. When compared to the lower bounds, the heuristics performed well for the smaller environment, but the performance quality decreased as the number of stages increased. The combination of these heuristics defiantly shows promise for solving the problem
Scheduling flow lines with buffers by ant colony digraph
This work starts from modeling the scheduling of n jobs on m machines/stages as flowshop with buffers in manufacturing. A mixed-integer linear programing model is presented, showing that buffers of size n - 2 allow permuting sequences of jobs between stages. This model is addressed in the literature as non-permutation flowshop scheduling (NPFS) and is described in this article by a disjunctive graph (digraph) with the purpose of designing specialized heuristic and metaheuristics algorithms for the NPFS problem. Ant colony optimization (ACO) with the biologically inspired mechanisms of learned desirability and pheromone rule is shown to produce natively eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions found by other heuristics. The proposed ACO has been critically compared and assessed by computation experiments over existing native approaches. Most makespan upper bounds of the established benchmark problems from Taillard (1993) and Demirkol, Mehta, and Uzsoy (1998) with up to 500 jobs on 20 machines have been improved by the proposed ACO
Recommended from our members
Combinatorial optimization and metaheuristics
Today, combinatorial optimization is one of the youngest and most active areas of discrete mathematics. It is a branch of optimization in applied mathematics and computer science, related to operational research, algorithm theory and computational complexity theory. It sits at the intersection of several fields, including artificial intelligence, mathematics and software engineering. Its increasing interest arises for the fact that a large number of scientific and industrial problems can be formulated as abstract combinatorial optimization problems, through graphs and/or (integer) linear programs. Some of these problems have polynomial-time (“efficient”) algorithms, while most of them are NP-hard, i.e. it is not proved that they can be solved in polynomial-time. Mainly, it means that it is not possible to guarantee that an exact solution to the problem can be found and one has to settle for an approximate solution with known performance guarantees. Indeed, the goal of approximate methods is to find “quickly” (reasonable run-times), with “high” probability, provable “good” solutions (low error from the real optimal solution). In the last 20 years, a new kind of algorithm commonly called metaheuristics have emerged in this class, which basically try to combine heuristics in high level frameworks aimed at efficiently and effectively exploring the search space. This report briefly outlines the components, concepts, advantages and disadvantages of different metaheuristic approaches from a conceptual point of view, in order to analyze their similarities and differences. The two very significant forces of intensification and diversification, that mainly determine the behavior of a metaheuristic, will be pointed out. The report concludes by exploring the importance of hybridization and integration methods
- …